Search results

1 – 9 of 9
Book part
Publication date: 31 January 2024

Julie Nichols, Lynette Newchurch, Ann Newchurch, Rebecca Agius and David Weetra

Country and cultural heritage are inextricably linked for First Nations peoples. This chapter explores those relationships in the context of repatriating cultural heritage…

Abstract

Country and cultural heritage are inextricably linked for First Nations peoples. This chapter explores those relationships in the context of repatriating cultural heritage materials back to Country and conceptualising a place for its ‘awakening’ for the Ngadjuri community of Mid-North South Australia. These materials in the context of this book ‘interpreted’ as a form of data curation, requiring potentially unique information systems designs to achieve accessibility, recoverability, and durability in remote communities with limited internet and mobile phone coverage. On the other hand, it is critically important to note, that the processes, challenges and repatriation of culturally sensitive materials and remains, are dependant here on the limitations of language. The reference to the notion of ‘data’ as a descriptor, and an inadequate term on some level, does not, and is not intended to, diminish any of their cultural significance and gravity. These are challenges that are worth the intellectual and technological investment to realise a return to Country for generationally displaced peoples and their cultural property that also needs to make it home.

Details

Data Curation and Information Systems Design from Australasia: Implications for Cataloguing of Vernacular Knowledge in Galleries, Libraries, Archives, and Museums
Type: Book
ISBN: 978-1-80455-615-3

Keywords

Open Access
Article
Publication date: 21 July 2022

Anna-Therése Järvenpää, Johan Larsson and Per Erik Eriksson

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Abstract

Purpose

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Design/methodology/approach

Semi-structured interviews about six infrastructure projects were conducted to identify respondents’ views on innovation possibilities. These possibilities were then analyzed from an organizational control perspective within principal–agent relationships between the Swedish Transport Administration (STA) and their contractors.

Findings

How the client uses control systems affects innovation possibilities. Relying on process control could negatively affect innovation opportunities, whereas output control could have a positive influence. In addition, social control seems to have a weak effect, as the STA appears not to use social control to facilitate joint innovation. Public clients must comply with the Public Procurement Act and, therefore, retain the requirements specified in the tendering documents. Much of the steering of the execution is connected to the ex ante phase (before signing the contract), which affects innovation possibilities in the design and execution phases for the contractor.

Research limitations/implications

This study was conducted with only one client, thus limiting its generalizability. However, the findings provide an important stepping stone to further investigation into balancing control systems and creating innovation possibilities in a principal–agent relationship.

Originality/value

Although public procurement has increasingly been emphasized as a major potential source of innovation, studying how a public client’s use of organizational control systems affects innovation possibilities in the construction sector has received scant attention.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Abstract

Details

Understanding Children's Informal Learning: Appreciating Everyday Learners
Type: Book
ISBN: 978-1-80117-274-5

Article
Publication date: 9 February 2024

Runze Yu and Li Ma

The paper covers mega infrastructure construction supply chain (MICSC) in Engineering-Procurement-Construction (EPC) projects, where the frequent occurrence of risk incidents has…

134

Abstract

Purpose

The paper covers mega infrastructure construction supply chain (MICSC) in Engineering-Procurement-Construction (EPC) projects, where the frequent occurrence of risk incidents has greatly affected human life. The research aims to establish a risk evaluation index system for MICSC in EPC projects, exploring what risk factors lead to risk incidents and measure the importance and causality of all these risk factors.

Design/methodology/approach

The research applies a combination of quantitative and qualitative analysis methodology to process data sequentially. In the first place, risk factors for MICSC in EPC projects are extracted and identified from literature survey and expert interviews. In the second place, an integration model fuzzy Analytic Hierarchy Process (f-AHP) and fuzzy Decision-making Trial and Evaluation Laboratory (f-DEMATEL) is constructed to comprehensively analyze all these risk factors.

Findings

12 primary risk factors and 36 secondary risk factors comprise the risk evaluation index system for MICSC in EPC projects from 178 literature and 5 professionals. The results indicate that Political Situation (F1), Social Security (F2) and Management Mode (F8) are critical risk factors, where F1 and F2 are cause factors and F8 is an effect factor.

Originality/value

There are three main contributions of this paper. First and foremost, from the perspective of the research content, no other study has been able to assess risk factors for MICSC in EPC projects, while embedding nine phases of the whole project life cycle and six subjects of stakeholders into a risk evaluation index system. Additionally, from the perspective of research method, a combined model incorporating f-AHP and f-DEMATEL is constructed to avoid the one-sidedness of a single model. Last but not least, from the perspective of practical significance, focusing on the critical risk factors, a series of effective measures are formulated to make appropriate management decisions for nodal enterprises of MICSC, which can improve their risk management capabilities.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 23 October 2023

Dafnis N. Coudounaris and Peter Björk

This paper aims to investigate the internal factors of resources and capabilities of five born globals (BGs) from Estonia. It explores quantitatively the internal factors between…

Abstract

Purpose

This paper aims to investigate the internal factors of resources and capabilities of five born globals (BGs) from Estonia. It explores quantitatively the internal factors between a medium BG and four small BGs.

Design/methodology/approach

The study used a survey questionnaire in collecting information from the CEOs of BGs. The questionnaire consisted of 105 questions relevant to export sales related to differences in internal factors.

Findings

The firms’ size and industrial sector play a role in export sales due to differences in internal factors. Small BGs expect financially based rewards, non-financial rewards, the job satisfaction of sales representatives with the export manager, and with work in general, and the representatives’ job satisfaction is higher in the small BGs than in the medium BG. The sales representatives’ job performance, their work performance, sales presentations, technical knowledge, adaptiveness, teamwork, planning, support, the organisational capabilities for business identification, relationship-building and innovation are all higher in medium BGs than in small BGs. Eleven sub-constructs of the model were shown to be important for small BGs.

Originality/value

The current study is focused on BGs from Estonia, i.e. small BGs and medium BGs. The study contributes to the internal factors of resources and capabilities of BGs as well as to the literature review on BGs. It also provides a logical conceptual model, indicating that the export manager’s job satisfaction is the central construct influenced by antecedent factors and is related directly to the export sales performance of the BG.

Article
Publication date: 31 October 2023

Edmond Wai-Ming Lam, Albert P.C. Chan, Timothy O. Olawumi, Irene Wong and Kayode Olatunji Kazeem

Sustainability has been the subject of several scientific investigations. Many researchers in the construction industry have also examined a range of sustainability-related…

Abstract

Purpose

Sustainability has been the subject of several scientific investigations. Many researchers in the construction industry have also examined a range of sustainability-related studies. However, few studies have thoroughly reviewed implementing sustainability concepts in high-rise residential buildings (HRRBs).

Design/methodology/approach

By adopting scientometrics and systematic review (SR), this study seeks to map out recent sustainability trends and concepts in the design, development and operation of HRRBs worldwide and in Hong Kong. With a focus on bibliographic records from the Web of Science (WoS) database, 1,395 journal articles from 2013 to 2022 were analysed. Furthermore, thirteen studies were systematically reviewed.

Findings

The SR indicated that sustainable practices in developing Hong Kong's HRRBs emphasised zero-carbon buildings, reduced energy usage and energy-efficient retrofitting. Likewise, terms such as BIM, urban density, life cycle assessment and system dynamics are strongly connected with clusters that include “residential buildings”, “high-rise buildings” and “high-rise residential buildings”. The study identified significant themes in establishing HRRBs by combining sustainable practices, emphasising urban governance and policy management, building performance and thermal comfort, energy and design optimisation, occupant behaviour and sensitivity analysis. Core sustainability ideas have improved resource management, air quality management and knowledge of user behaviour in HRRBs.

Originality/value

The study allows researchers and practitioners to explore future research directions in the built environment per the application of sustainable concepts in the development of HRRBs from design, construction and post-construction phases.

Details

Smart and Sustainable Built Environment, vol. 13 no. 2
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 23 January 2023

Amir Naser Ghanbaripour, Craig Langston, Roksana Jahan Tumpa and Greg Skulmoski

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating…

457

Abstract

Purpose

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating project delivery success is crucial for organizations since it enables them to prepare for future growth through more effective project management mechanisms and rank the organization's projects for continuous improvement. There is considerable disagreement over a set of success criteria that can be applied to all kinds of projects when evaluating project delivery success, making it a complicated procedure for practitioners and scholars. This research seeks to alleviate the problem by validating and testing a systematic project delivery success model (3D integration model) in the Australian construction industry. The aim is to establish a dependable approach built upon prior research and reliable in evaluating delivery success for any project type.

Design/methodology/approach

Based on a novel project delivery success model, this research applies a case study methodology to analyse 40 construction projects undertaken by a single Australian project management consultancy. The research utilizes a mixed-method research approach and triangulates three sets of data. First, the project delivery success (PDS) scores of the projects are calculated by the model. Second, a qualitative analysis targeting the performance of the same projects using a different system called the performance assessment review (PAR) scores was obtained. These culminate in two sets of ranking. The third step seeks validation of results from the head of the partnering organization that has undertaken the projects.

Findings

The findings of this study indicate that the 3D integration model is accurate and reliable in measuring the success of project delivery in construction projects of various sizes, locations and durations. While the model uses six key performance indicators (KPIs) to measure delivery success, it is evident that three of these may significantly improve the likelihood of PDS: value, speed and impact. Project managers should focus on these priority aspects of performance to generate better results.

Research limitations/implications

Restrictions inherent to the case study approach are identified for this mixed-method multiple-case study research. There is a limitation on the sample size in this study. Despite the researcher's best efforts, no other firm was willing to share such essential data; therefore, only 40 case studies could be analysed. Nonetheless, the number of case studies met the literature's requirements for adequate units for multiple-case research. This research only looked at Australian construction projects. Thus, the conclusions may not seem applicable to other countries or industries. The authors investigated testing the PDS in the construction sector. It can assist in improving efficiency and resource optimization in this area. Nonetheless, the same technique may be used to analyse and rank the success of non-construction projects.

Originality/value

Despite the research conducted previously on the PDS of construction projects, there is still confusion among researchers and practitioners about what constitutes a successful project delivery. Although several studies have attempted to address this confusion, no consensus on consistent performance metrics or a practical project success model has been formed. More importantly, (1) the ability to measure success across multiple project types, (2) the use of triple bottom line (TBL) to incorporate sustainability in evaluating delivery success and (3) the use of a complexity measurement tool to adjust delivery success scores set the 3D integration model apart from others.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 12 February 2024

Nanjangud Vishwanath Vighnesh, Balachandra Patil and Deepak Chandrashekar

There is widespread consensus that unchecked growth of e-waste is a major challenge to global sustainability transition. Current research has failed to connect e-waste with…

Abstract

Purpose

There is widespread consensus that unchecked growth of e-waste is a major challenge to global sustainability transition. Current research has failed to connect e-waste with principles of circularity and sustainability from the consumption perspective. This paper aims to answer the following questions: What kind of environmental behaviors (EBs) exist among consumers in relation to e-waste?; In what ways are these consumers different from and similar to each other based on their EBs in relation to e-waste?; How do consumers and their EBs contribute to sustainable waste management?

Design/methodology/approach

Based on primary data from an Indian sample of information and communication technology consumers, EBs relevant to e-waste management are identified. In the next stage, a behavior-based segmentation and profiling of consumers is performed.

Findings

The first phase of analysis produced eight distinct EBs which were then used in the next phase to obtain a consumer typology of three segments. The three consumer segments differed significantly with each other on general environmental behavior and awareness about e-waste.

Research limitations/implications

The paper develops a comprehensive conceptual framework for studying the demand-side circularity transition for sustainable e-waste management.

Practical implications

For business stakeholders, findings of the study and the proposed framework can inform behavior change interventions to customize offerings for different right consumer segments.

Originality/value

The paper adds new knowledge to the intersectional area of e-waste, consumer behavior and sustainability through the development of consumer typology and a conceptual framework.

Details

Journal of Indian Business Research, vol. 16 no. 1
Type: Research Article
ISSN: 1755-4195

Keywords

Article
Publication date: 6 February 2024

Safowaa Osei-Tutu, Joshua Ayarkwa, Gabriel Nani, Dickson Osei-Asibey and Ivy Maame Adwoa Abu

This study aims to identify in literature the role of construction stakeholders in the implementation of circular economy (CE) in the construction industry (CI). This study also…

Abstract

Purpose

This study aims to identify in literature the role of construction stakeholders in the implementation of circular economy (CE) in the construction industry (CI). This study also sought to identify the status quo and research trend, “hot themes”, areas requiring more research and future research direction of stakeholders’ role in CE implementation in the CI.

Design/methodology/approach

A literature search was conducted using the Scopus search engine, augmented by Google Scholar to produce 50 relevant articles for the identification of stakeholders’ roles using content analysis. The scientometric study was undertaken using VOSviewer on 42 articles obtained from Scopus search to identify the status quo, “hot themes”, knowledge gaps and future research direction of the role of stakeholders in CE implementation.

Findings

Through content analysis, the identified roles of government as a stakeholder are to develop efficient policy instruments, legislation support and financial investment in research and development activities that will promote the smooth implementation of CE. The role of academia/research is to engage in research aimed at investigating both the short-term behaviour and the durability of recycled materials and products. In addition, the roles of professionals in the consultant/design/procurement team are to design with life cycle assessment and reused materials, design for deconstruction and disassembly, etc. The role of the user/consumer is to ensure knowledge diffusion and awareness exchange that recognize the available opportunities for long-term material usage (including repair, reuse, refurbishment and recycling). The research status quo identified from the scientometric analysis include how stakeholders can come up with innovative ways in demolition that will ensure that more of the materials can be reused. Stakeholders should focus on enacting policies and laws that can promote the use of recycled materials in buildings, etc. Research that focuses on how to engage the various construction stakeholders to come up with specific public policy that will promote CE implementation, identifying the specific roles to be played by stakeholders during policy enactment as well as managing the environment, laws and legislations towards CE implementation. The role of stakeholders in the extension of the life span of projects, the use of strategies to minimize waste generation and standardization of building materials, components and connectors with the purpose of simplifying disassembly are the research gaps and areas for future research studies. Some of the research “hot themes” include “circular business models in the CI”, “environmental sustainability policy implementation”, “environmental, economic and social sustainability”, “policy, laws and legislations on waste management” and “environmental and industrial economics” towards CE implementation.

Practical implications

The findings from this study serve as a valuable reference for construction stakeholders to assess their specific roles as stakeholders and to identify the status quo and research trend, “hot themes”, areas requiring more research and future research directions on stakeholders’ roles in CE implementation in the CI.

Originality/value

Identifying the role of stakeholders for CE implementation is one bold step towards the achievement of CE implementation in the CI.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 9 of 9