Search results

1 – 10 of over 4000
Article
Publication date: 3 July 2023

Ozan Okudan, Murat Cevikbas and Zeynep Işık

The purpose of this paper is to propose a decision support framework that can be used by decision-makers to identify the most convenient disruption analysis (DA) methods for…

Abstract

Purpose

The purpose of this paper is to propose a decision support framework that can be used by decision-makers to identify the most convenient disruption analysis (DA) methods for megaprojects and their stakeholders.

Design/methodology/approach

The framework was initially developed by conducting a comprehensive literature review to obtain extensive knowledge about disruption management and megaprojects. Focus group discussion (FGD) sessions with the participation of the construction practitioners were then organized to validate and strengthen the findings of the literature review. Consequently, 17 selection factors were identified and categorized as requirement, ability and outcome. Lastly, the most convenient DA methods for megaprojects were identified by performing integrated fuzzy analytical hierarchy process (AHP) and fuzzy technique for order of preference by similarity to ideal solution (TOPSIS) analysis. Additionally, consistency analysis was also conducted to verify the reliability of the results.

Findings

The results revealed that the measured mile method is the most appropriate DA method for megaprojects. In case the measured mile method cannot be adopted due to various technical and contractual reasons, the decision-makers are proposed to consider program analysis, work or trade sampling, earned value analysis and control chart method, respectively. Second, the selection factors such as “Comprehensible analysis procedure,” “Existing knowledge and experience about a particular DA method,” “Ability to resolve greater number of disruption events,” “Ability to resolve complex disruption events,” “Ability to exclude factors that are not under the owner's responsibility” and “General acceptance by practitioners, courts, and arbitration, etc.” were given the top priority by the experts, highlighting the critical aspects of the DA methods.

Originality/value

Disruption claims in megaprojects are very critical for the contractors to compensate for the losses stemming from disruption events. Although the effective use of DA methods maximizes the accuracy and reliability of disruption claims, decision-makers can barely implement these methods adequately since past studies neglect to present extensive knowledge about the most convenient DA methods for megaprojects. Thus, developing a decision support framework for the selection of DA methods, this study is the earliest attempt that examines the mechanisms and inherent differences of DA methods. Additionally, owing to the robustness and versatility of this research approach, the research approach could be replicated also for future studies focusing on other project-based industries since disruption is also a challenging issue for many other industries.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 November 2022

Bismark Amfo, Adinan Bahahudeen Shafiwu and Mohammed Tanko

The authors investigated cocoa farmers' access to subsidized fertilizer in Ghana and implications on productivity.

Abstract

Purpose

The authors investigated cocoa farmers' access to subsidized fertilizer in Ghana and implications on productivity.

Design/methodology/approach

Primary data were sourced from 435 cocoa farmers. Cragg hurdle and two-step Tobit model with continuous endogenous regressors/covariates were applied for the drivers of cocoa farmers' participation in fertilizer subsidy programme and productivity. Propensity score matching (PSM), inverse-probability weights (IPW) and augmented inverse-probability weights (AIPW) were applied for productivity impact assessment of fertilizer subsidy.

Findings

All the farmers were aware of fertilizer subsidy for cocoa production in Ghana. Farmers became aware of fertilizer subsidy through extension officers, media and other farmers. Half of cocoa farmers benefitted from fertilizer subsidy. Averagely, cocoa farmers purchased 292 kg of subsidized fertilizer. Many socio-economic, farm-level characteristics and institutional factors determine cocoa farmers' participation in fertilizer subsidy programme, quantity of subsidized fertilizer obtained and productivity. Beneficiaries of fertilizer subsidy recorded higher cocoa productivity than non-beneficiaries. Hence, fertilizer subsidy for cocoa production in Ghana leads to a gain in productivity.

Practical implications

There should be more investments in fertilizer subsidy so that all cocoa farmers benefit and obtain the required quantities.

Originality/value

The authors provide new evidence on cocoa productivity gain or loss emanating from fertilizer subsidy by combining different impact assessment techniques for deeper analysis: PSM, IPW and AIPW.

Article
Publication date: 13 January 2023

Hasan Bağcı and Seyhan Çil Koçyiğit

Decree Law No. 663 introduced a decentralized organizational structure and administration pertaining to Turkish public hospitals in November 2011. This study aims to explore the…

Abstract

Purpose

Decree Law No. 663 introduced a decentralized organizational structure and administration pertaining to Turkish public hospitals in November 2011. This study aims to explore the effects of the public hospital unions (PHUs), which were a result of Decree Law No. 663, on the efficiency and productivity of public hospitals.

Design/methodology/approach

Data envelopment analysis (DEA) and DEA-based Malmquist total factor productivity (TFP) index were used from 2011 to 2016. Raw materials and supply expenses, salaries and fringe benefits, other service costs, general administrative expenses, total number of beds, number of specialists, number of residents, number of general practitioners, number of nurses and midwives and other medical officials were used as input variables. Working capital turnover, number of inpatients, number of outpatients and number of surgical operations for Groups A, B and C were used as output variables.

Findings

According to the DEA scores, the percentage of efficient hospitals showed a declining trend from 2011 to 2016. The TFP results also showed a decreasing trend from 2011 to 2016.

Practical implications

Providing administrative and financial autonomy to public hospital managers may cause efficiency and productivity losses, which is contrary to expectations.

Originality/value

This study is the first to reveal the impact of decentralization of public healthcare providers on their performance levels in Turkey.

Details

Benchmarking: An International Journal, vol. 30 no. 10
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 15 February 2022

Ha Duy Khanh, Soo Yong Kim and Le Quoc Linh

This study aims to focus on exploring the construction productivity of building projects under the influence of potential factors. The three primary purposes are (1) determining…

Abstract

Purpose

This study aims to focus on exploring the construction productivity of building projects under the influence of potential factors. The three primary purposes are (1) determining critical factors affecting construction productivity; (2) identifying causal relationship and occurrence probability of these factors to develop a Bayesian network (BN) model; and (3) validating the accuracy of predictions from the proposed BN model via a case study.

Design/methodology/approach

A conceptual framework that includes three performance stages was used. Twenty-two possible factors were screened from a comprehensive literature review and evaluated through expert opinions. Data were collected using a structured questionnaire-based survey and case-study-based survey. The sampling methods were based on non-probability sampling.

Findings

Worker characteristic-related factors significantly affect labour productivity for a construction task. Construction productivity is dominated by the working frequency of workers (overtime), complexity of the task, level of technology application and accidents. Labour productivity is defined as nearly 50% of the baseline productivity using the BN model created by the caut 2sal relationship and probability of factors. The prediction error of the BN model was 6.6%, 10.0% and 9.3% for formwork (m2/h), reinforcing steel (ton/h) and concrete (m3/h), respectively.

Research limitations/implications

The evaluation or prediction of productivity performance has become a necessary topic for research and practice.

Practical implications

Managers and practitioners in the construction sector can utilise the outcome of this study to create good productivity management policies for their prospective projects.

Originality/value

Worker-related characteristics are dominant among critical factors affecting labour productivity for a construction task; the proposed BN-based predictive model is built based on these critical factors. The BN approach is highly accurate for construction productivity prediction. The findings of this study can fill gaps in the construction management body of knowledge when modelling construction productivity under the effects of multiple factors and using a simple probabilistic graphic tool.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 August 2023

Oluseyi Julius Adebowale and Justus Ngala Agumba

Small and medium-sized contractors are critical to micro and macroeconomic performance. These contractors in South Africa have long been confronted with the problem of business…

Abstract

Purpose

Small and medium-sized contractors are critical to micro and macroeconomic performance. These contractors in South Africa have long been confronted with the problem of business failure because of a plethora of factors, including poor productivity. The purpose of this study is to investigate salient issues undermining the productivity of small and medium-sized contractors in South Africa. This study proposes alternative possibilities to engender productivity improvement.

Design/methodology/approach

Qualitative data were collected using semi-structured interviews with 15 contractors in Gauteng Province, South Africa. The research data were analysed using content and causal layered analyses.

Findings

Challenges to contractors’ productivity were associated with inadequately skilled workers, management competence and political factors. Skills development, construction business and political factors were dominant stakeholders’ perceptions. Metaphors for construction labour productivity are presented and reconstructed as alternative directions for productivity improvement.

Practical implications

Contractors lose a substantial amount of South African Rand to poor productivity. Alternative directions provided in this study can be leveraged to increase profitability in construction organizations, enhance the social well-being of South Africans and ultimately improve the contribution of contractors to the South African economy.

Originality/value

The causal layered analysis (CLA) applied in this study is novel to construction labour productivity research. The four connected layers of CLA, which make a greater depth of inquiry possible, were explored to investigate labour productivity in construction organizations.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 6 September 2022

Murat Cevikbas, Ozan Okudan and Zeynep Işık

The purpose of this paper is to propose a disruption claim management (DCM) life cycle and a risk management framework to provide comprehensive guidance to construction…

Abstract

Purpose

The purpose of this paper is to propose a disruption claim management (DCM) life cycle and a risk management framework to provide comprehensive guidance to construction practitioners for facilitating effective and efficient DCM.

Design/methodology/approach

DCM life cycle was initially developed through a focus group discussion (FGD) with the participation of the construction practitioners who have diverse experiences about DCM. The life cycle is comprised of 6 phases and also includes proper reactions of the owners and contractors. Then, 42 risk factors that can impact the deliverables of DCM were identified through a literature review and an additional FGD session. This was then followed by a Fuzzy Analytical Hierarchy Process (FAHP) which was performed to evaluate the importance of each risk factor in terms of the factor's impact on the success of DCM. Additionally, consistency analysis was performed to further maximize the reliability of the results.

Findings

Findings revealed that a proactive and systematic approach should be adopted and DCM practices should be initiated before any disruption event is triggered. Accordingly, the proposed framework recommends DCM practices to be initiated early in the contract development phase since compensation for the disruption might be recovered only to the extent that the contract permits. The contract-related risks were given top priority by the experts so that the results of the fuzzy AHP analysis also verified the significance of the contract development phase. Besides contract-related risks, risks related to insufficient site observation, ignorance of the project team, cognitive bias and conflict of interest were determined as the most significant DCM risks, needing an urgent and sophisticated risk response plan. Lastly, results suggested that “Site observation and record-keeping” is the most formidable phase since the phase's implementation on a continuous basis could create unforeseen organizational challenges such as mismanagement of project records, especially in the dynamic and turbulent environment of the construction projects.

Originality/value

Disruption – which is caused mostly by change – is inevitable in construction projects due to their sophisticated nature. DCM, therefore, becomes crucial to compensate losses of contractors and eliminate or diminish the prolonged dispute resolution process. Existing studies, however, do not provide a comprehensive theoretical basis for the DCM life cycle and DCM life cycle's potential risks so that DCM life cycle's promising benefits can hardly be materialized. Thus, developing a DCM life cycle and associating DCM life cycle with risk management, this study is highly believed to make a promising theoretical contribution to the DCM domain since this is one of the earliest attempts in the literature. Additionally, this research provides construction practitioners with an insight into the effective implementation of DCM practices in construction projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 October 2022

Ummad Mazhar

The health costs associated with obesity are increasing in developed and emerging economies. Particularly important, though remaining underexplored, is the overall impact of…

Abstract

Purpose

The health costs associated with obesity are increasing in developed and emerging economies. Particularly important, though remaining underexplored, is the overall impact of health risks associated with being obese and overweight on the productivity of firms in a cross-country setting. The purpose of this paper is to address these issues.

Design/methodology/approach

This paper exploits the natural variation in the percentage of obese males in the population as an exogenous health risk randomly distributed across firms in each country.

Findings

Investigating this link for a sample of around 80 emerging countries, the evidence suggests a significant negative effect of health risks on productivity.

Research limitations/implications

The identification assumptions are checked using different approaches to establish the robustness of the empirical link.

Originality/value

This study helps us understand the microlevel effects of the rising average obesity rate. This knowledge is rare in emerging economies which are facing the highest risks of obesity and cardiovascular diseases associated with it.

Details

Journal of Economic Studies, vol. 50 no. 6
Type: Research Article
ISSN: 0144-3585

Keywords

Open Access
Article
Publication date: 1 February 2023

Oluwatoyin Esther Akinbowale, Heinz Eckart Klingelhöfer and Mulatu Fekadu Zerihun

The purpose of this study is to assess the impact of cyberfraud in the South African banks with the aim to provide recommendations to effectively mitigate it.

4074

Abstract

Purpose

The purpose of this study is to assess the impact of cyberfraud in the South African banks with the aim to provide recommendations to effectively mitigate it.

Design/methodology/approach

The study uses a qualitative approach involving the use of structured questionnaires. The questionnaires were made available to the staff of 17 licensed banks in South Africa who deal with management, operation, administration and banking services. Two hypotheses were formulated and non-parametric statistical analyses involving the use of Chi-square test, Fischer’s Exact test and Spearman’s correlation were carried out. The two hypotheses formulated were tested to draw a conclusion.

Findings

The results obtained indicate that the impact of cyberfraud in the South African banking industry is highly significant and has affected the reputation of some of the banks. This calls for the need to review the diverse ways of curbing cyberfraud to lessen their impact and that of associated fraud risks on the banking operation.

Practical implications

This study provides an analysis on the relationship cyberfraud occurrences and the reputation of South African banks. The implementation of the recommendations may reinforce the existing security measures in the fight against cyberfraud.

Originality/value

The novelty of this study lies in the fact that the assessment of the impact of cyberfraud on the banking industry in South Africa has not been sufficiently highlighted by the existing literature.

Details

Journal of Financial Crime, vol. 31 no. 2
Type: Research Article
ISSN: 1359-0790

Keywords

Article
Publication date: 27 October 2023

Muhammad Saiful Islam, Madhav Nepal and Martin Skitmore

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural…

Abstract

Purpose

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural relationships among each other. The purpose of this study is, therefore, to establish the complex structural relationships of risks involved.

Design/methodology/approach

In total, 76 published articles from the previous literature are reviewed using the content analysis method. Three risk networks in different phases of power plant projects are depicted based on literature review and case studies. The possible methods of solving these risk networks are also discussed.

Findings

The study finds critical cost overrun risks and develops risk networks for the procurement, civil and mechanical works of power plant projects. It identifies potential models to assess cost overrun risks based on the developed risk networks. The literature review also revealed some research gaps in the cost overrun risk management of power plants and similar infrastructure projects.

Practical implications

This study will assist project risk managers to understand the potential risks and their relationships to prevent and mitigate cost overruns for future power plant projects. It will also facilitate decision-makers developing a risk management framework and controlling projects’ cost overruns.

Originality/value

The study presents conceptual risk networks in different phases of power plant projects for comprehending the root causes of cost overruns. A comparative discussion of the relevant models available in the literature is presented, where their potential applications, limitations and further improvement areas are discussed to solve the developed risk networks for modeling cost overrun risks.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 21 November 2022

Babar Ali, Ajibade A. Aibinu and Vidal Paton-Cole

Delay and disruption claims involve a complex process that often result in disputes, unnecessary expenses and time loss on construction projects. This study aims to review and…

Abstract

Purpose

Delay and disruption claims involve a complex process that often result in disputes, unnecessary expenses and time loss on construction projects. This study aims to review and synthesize the contributions of previous research undertaken in this area and propose future directions for improving the process of delay and disruption claims.

Design/methodology/approach

This study adopted a holistic systematic review of literature following Preferred Reporting Items for Systematic Reviews and Meta-Analysis guidelines. A total of 230 articles were shortlisted related to delay and disruption claims in construction using Scopus and Web of Science databases.

Findings

Six research themes were identified and critically reviewed including delay analysis, disruption analysis, claim management, contract administration, dispute resolution and delay and disruption information and records. The systematic review showed that there is a dearth of research on managing the wide-ranging information required for delay and disruption claims, ensuring the transparency and uniformity in delay and disruption claims’ information and adopting an end-user’s centred research approach for resolving the problems in the process of delay and disruption claims.

Practical implications

Complexities in delay and disruption claims are real-world problems faced by industry practitioners. The findings will help the research community and industry practitioners to prioritize their energies toward information management of delay and disruption claims.

Originality/value

This study contributes to the body of knowledge in delay and disruption claims by identifying the need for conducting more research on its information requirements and management. Subsequently, it provides an insight on the use of modern technologies such as drones, building information modeling, radio frequency identifiers, blockchain, Bigdata and machine learning, as tools for more structured and efficient attainment of required information in a transparent and consistent manner. It also recommends greater use of design science research approach for delay and disruption claims. This will help to ensure delay and disruption claims are the least complex and less dispute-prone process.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of over 4000