Search results

1 – 10 of over 3000
Article
Publication date: 10 January 2023

Oliver William Jones, David Devins and Greg Barnes

The paper is a proof of concept (PoC) intervention study aimed for developing performance management (PM) practices in manufacturing small and medium-sized enterprises (SMEs) with…

827

Abstract

Purpose

The paper is a proof of concept (PoC) intervention study aimed for developing performance management (PM) practices in manufacturing small and medium-sized enterprises (SMEs) with the longer-term aim enabling the SMEs to improve their productivity. The intervention was designed and deployed by a collaborative quartet of academics, management consultants, accountancy firm and a commercial bank manager.

Design/methodology/approach

The paper firstly musters a set of initialising PM practices aligned to productivity improvement. These are utilised to design a knowledge transfer intervention for deployment with a set of manufacturing SMEs incorporating some associated productivity tools. The evaluation of the intervention utilised a case study approach founded on a logic model of the intervention to assess the development of the PM practices.

Findings

The intervention contributed to a partial development of the mustered practices and the productivity diagnostic based on the multi-factor productivity (MFP) abstraction and a data extraction protocol had the strongest impact. The study revealed the importance of the three interlaced factors: Depth of engagement, feedback opportunities and the intervention gradient (the increase of independent action from the participating SME's and the diminishment of the external intervention effort).

Research limitations/implications

The case study is based on a limited number of individual SME's, and within just the manufacturing sector.

Practical implications

SME businesses will require a more sustained programme of interventions than this pilot to develop PM capability, and depth of engagement within the SME is critical. Professional stakeholders can be utilised in recruitment of firms for intervention programmes. Business can start developing PM capability prior to PMS implementation using the tools from this programme.

Originality/value

The productivity diagnostic tool, based on a synthesis of MFP and the performance pyramid, an array of potential initialising practices for PM capability and discovery of potential mechanisms for PM practice development.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 1
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 13 February 2024

Kaisu Laitinen, Mika Luhtala, Maiju Örmä and Kalle Vaismaa

Insufficient productivity development in the global and Finnish infrastructure sectors indicates that there are challenges in genuinely achieving the goals of resource efficiency…

Abstract

Purpose

Insufficient productivity development in the global and Finnish infrastructure sectors indicates that there are challenges in genuinely achieving the goals of resource efficiency and digitalization. This study adapts the approach of capability maturity model integration (CMMI) for examining the capabilities for productivity development that reveal the enablers of improving productivity in the infrastructure sector.

Design/methodology/approach

Civil engineering in Finland was selected as the study area, and a qualitative research approach was adopted. A novel maturity model was constructed deductively through a three-step analytical process. Previous research literature was adapted to form a framework with maturity levels and key process areas (KPAs). KPA attributes and their maturity criteria were formed through a thematic analysis of interview data from 12 semi-structured group interviews. Finally, validation and refinement of the model were performed with an expert panel.

Findings

This paper provides a novel maturity model for examining and enhancing the infrastructure sector’s maturity in productivity development. The model brings into discussion the current business logics, relevance of lifecycle-thinking, binding targets and outcomes of limited activities in the surrounding infrastructure system.

Originality/value

This paper provides a new approach for pursuing productivity development in the infrastructure sector by constructing a maturity model that adapts the concepts of CMMI and change management. The model and findings benefit all actors in the sector and provide an understanding of the required elements and means to achieve a more sustainable built environment and effective operations.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Book part
Publication date: 5 April 2024

Luis Orea, Inmaculada Álvarez-Ayuso and Luis Servén

This chapter provides an empirical assessment of the effects of infrastructure provision on structural change and aggregate productivity using industrylevel data for a set of…

Abstract

This chapter provides an empirical assessment of the effects of infrastructure provision on structural change and aggregate productivity using industrylevel data for a set of developed and developing countries over 1995–2010. A distinctive feature of the empirical strategy followed is that it allows the measurement of the resource reallocation directly attributable to infrastructure provision. To achieve this, a two-level top-down decomposition of aggregate productivity that combines and extends several strands of the literature is proposed. The empirical application reveals significant production losses attributable to misallocation of inputs across firms, especially among African countries. Also, the results show that infrastructure provision has stimulated aggregate total factor productivity growth through both within and between industry productivity gains.

Article
Publication date: 23 March 2023

Haftu Hailu Berhe, Hailekiros Sibhato Gebremichael and Kinfe Tsegay Beyene

Existing conceptual, empirical and case studies evidence suggests that manufacturing industries find the joint implementation of Kaizen philosophy initiatives. However, the…

Abstract

Purpose

Existing conceptual, empirical and case studies evidence suggests that manufacturing industries find the joint implementation of Kaizen philosophy initiatives. However, the existing practices rarely demonstrated in a single framework and implementation procedure in a structure nature. This paper, therefore, aims to develop, validate and practically test a framework and implementation procedure for the implementation of integrated Kaizen in manufacturing industries to attain long-term improvement of operational, innovation, business (financial and marketing) processes, performance and competitiveness.

Design/methodology/approach

The study primarily described the problem, extensively reviewed the current state-of-the-art literature and then identified a gap. Based on it, generic and comprehensive integrated framework and implementation procedure is developed. Besides, the study used managers, consultants and academics from various fields to validate a framework and implementation procedure for addressing business concerns. In this case, the primary data was collected through self-administered questionnaire, and 244 valid questionnaires were received and were analyzed. Furthermore, the research verified the practicability of the framework by empirically exploring the current scenario of selected manufacturing companies.

Findings

The research discovered innovative framework and six-phase implementation procedure to fill the existing conceptual gap. Furthermore, the survey-based and exploratory empirical analysis of the research demonstrated that the practice of the proposed framework based on structured procedure is valued and companies attain the middling improvements of productivity, delivery time, quality, 5S practice, waste and accident rate by 61.03, 44, 52.53, 95.19, 80.12, and 70.55% respectively. Additionally, the companies saved a total of 14933446 ETH Birr and 5,658 M2 free spaces. Even though, the practices and improvements vary from company to company, and even companies unable to practice some of the unique techniques of the identified CI initiatives considered in the proposed framework.

Research limitations/implications

All data collected in the survey came from professionals working for Ethiopian manufacturing companies, universities and government. It is important to highlight that n = 244 is high sample size, which is adequate for a preliminary survey but reinforcing still needs further survey in terms of generalization of the results since there are hundreds of manufacturing companies, consultants and academicians implementing and consulting Kaizen. Therefore, a further study on a wider Ethiopian manufacturing companies, consultants and academic scale would be informative.

Practical implications

This work is very important for Kaizen professionals in the manufacturing industry, academic and government but in particular for senior management and leadership teams. Aside from the main findings on framework development, there is some strong evidence that practice of Kaizen resulted in achieving quantitative (monetary and non-monetary) and qualitative results. Thus, senior management teams should use this research out to practice and analyze the effect of Kaizen on their own organizations. Within the academic community, this study is one of the first focusing on development, validating and practically testing and should aid further study, research and understanding of Kaizen in manufacturing industries.

Originality/value

So far, it is rare to find preceding studies proposed, validated and practically test an integrated Kaizen framework with the context of manufacturing industries. Thus, authors understand that this is the very first research focused on the development of the framework for manufacturing industries continuously to be competitive and could help managers, institutions, practitioners and academicians in Kaizen practice.

Details

International Journal of Quality & Reliability Management, vol. 40 no. 10
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 5 October 2022

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva

Sources highlight that lack of systematic labour training components results in low performance and productivity of labour, which leads the construction industry of many countries…

Abstract

Purpose

Sources highlight that lack of systematic labour training components results in low performance and productivity of labour, which leads the construction industry of many countries to face various challenges. This study aims to quantify the variations in the performance and productivity levels of labour in building construction projects through the applications of effective work-based training components.

Design/methodology/approach

A comprehensive literature review and a series of experts’ discussions with action-oriented communication approaches were conducted to develop a set of practices related to labour training, performance assessment and productivity measurements within a framework. The developed practices were applied to around 100 labourers working on nine building construction projects through a construction supervisory training programme.

Findings

The study presents the detailed patterns of the significant changes in labour performance and productivity levels. The majority of trained labourers have grown to perform the work process with some relevant theoretical and operational knowledge and skills. The overall results spotlight the significant behavioural changes that can be observed in workforce operations by improving labour performance, which resulted in implementing effective labour-rewarding practices within a framework.

Research limitations/implications

Although the study findings were limited to the Sri Lankan context, the proposed practices can be applied to the industry practices of the construction sector of other developing countries and the other developing industries in similar ways/scenarios.

Practical implications

The study outcomes contribute to uplifting the work qualities of labourers with life-long learning opportunities and unlocking the potential barriers for expanding the local labour supply while controlling the excessive inclination of the local firms towards foreign labour. This paper describes further implications and future scopes of the study elaborately.

Originality/value

The study provides generalised mechanisms and practices that transform the labour characteristics and add new attributes for strengthening the values of construction supervision practices to obtain well-improved work outputs. The study outcomes reinforce the chain relationships among the training elements, labour performance and productivity levels, leading to upgrading current planning and operational management practices, especially adding constructive mechanisms in resource levelling and productivity benchmarking practices.

Details

Construction Innovation , vol. 24 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 13 February 2024

Seungjae Shin

The purpose of this study is to compare the competition and productivity of the US freight rail transportation industry for the past 41 years (1980 ∼ 2020), which consists of the…

231

Abstract

Purpose

The purpose of this study is to compare the competition and productivity of the US freight rail transportation industry for the past 41 years (1980 ∼ 2020), which consists of the two periods, before and after the abolishment of the Interstate Commerce Commission (ICC) in 1995.

Design/methodology/approach

This study investigates any relationships between the market concentration index values and labor productivity values in the separate two periods, and how the existence of a regulatory body in the freight transportation market impacted the productivity of the freight rail transportation industry by using a Cobb–Douglas production function on annual financial statement data from the US stock exchange market.

Findings

This study found that, after the abolishment of the ICC: (1) the rail industry became less competitive, (2) even if the rail industry had an increasing labor productivity trend, there was a strong negative correlation between the market concentration index and labor productivity and (3) the rail industry’s total factor productivity was decreased.

Originality/value

This study is to find empirical evidence of the effect of the ICC abolishment on the competition and productivity levels in the US freight rail transportation industry using a continuous data set of 41-year financial statements, which is unique compared to previous studies.

Details

Journal of International Logistics and Trade, vol. 22 no. 1
Type: Research Article
ISSN: 1738-2122

Keywords

Article
Publication date: 11 September 2023

Camillus Abawiera Wongnaa, Alhassan Abudu, Awal Abdul-Rahaman, Ernest Amegawovor Akey and Stephen Prah

This study examined the impact of the Input Credit Scheme (ICS) by the Integrated Water Management and Agriculture Development (IWAD) on the productivity and food security of…

Abstract

Purpose

This study examined the impact of the Input Credit Scheme (ICS) by the Integrated Water Management and Agriculture Development (IWAD) on the productivity and food security of smallholder rice farmers in Ghana.

Design/methodology/approach

Cross-sectional data from 250 rice farming households in the Mamprugu Moagduri district of the North East Region obtained from a multi-stage sampling technique were used for the study. Inverse Probability Weighted Regression Adjustment (IPWRA), Propensity Score Matching (PSM) and Kendall's coefficient of concordance were the methods of analysis employed.

Findings

Empirical results show that education, rice farming experience, dependency ratio, FBO membership, farm size and farm age were the significant factors influencing participation in the input credit scheme (ICS). Also, participants had an average rice productivity of 1,476.83 kg/ha, whereas non-participants had 1,131.81 kg/ha implying that participants increased their productivity by about 30%. In addition, the study revealed that participant households increased their household dietary diversity (HDDS) by 0.45 points amounting to about 8% diversity in their diets. High-interest rates associated with credit received, the short periods of credit repayment and the high cost of inputs provided under the scheme were the most challenging constraints associated with partaking in the ICS.

Practical implications

The available literature on agricultural interventions have predominantly emphasized input credit as a key factor for improving cropt productivity and food security of smallholders. This study provides compelling evidence that participation in ICSs can result in substantial benefits for agricultural development, as evidenced by increased productivity leading to improved food security. The significance of these findings is highlighted by the fact that, through participation in input credit schemes, smallholder rice farmers in many developing countries see substantial improvement in their capacity to access productive resources, thereby improving their productivity, while simultaneously reducing food insecurity.

Social implications

Leveraging on the improved productivity of participants in the ICS, this study advocates that such input credit schemes should scale up to more food-insecure farming communities in Ghana.

Originality/value

The study uses a doubly robust econometric approach to evaluate the impact of ICS on smallholder rice farmers' productivity and food security in Ghana, making it the first of its kind. The findings offer a solid basis for future research and provide guidance for policymakers looking to boost agricultural development in Ghana.

Details

Agricultural Finance Review, vol. 83 no. 4/5
Type: Research Article
ISSN: 0002-1466

Keywords

Article
Publication date: 16 April 2024

Rahadian Haryo Bayu Sejati, Dermawan Wibisono and Akbar Adhiutama

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor…

Abstract

Purpose

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor productivity without compromising human safety in Indonesian upstream oil field operations that manage ageing and life extension (ALE) facilities.

Design/methodology/approach

The research design applies a pragmatic paradigm by employing action research strategy with qualitative-quantitative methodology involving 385 of 1,533 workers. The KBPMS-L6s conceptual framework is developed and enriched with the Analytical Hierarchy Process (AHP) to prioritize fit-for-purpose Key Performance Indicators. The application of L6s with Human Performance Modes analysis is used to provide a statistical baseline approach for pre-assessment of the contractor’s organizational capabilities. A comprehensive literature review is given for the main pillars of the contextual framework.

Findings

The KBPMS-L6s concept has given an improved hierarchy for strategic and operational levels to achieve a performance benchmark to manage ALE facilities in Indonesian upstream oil field operations. To increase quality management practices in managing ALE facilities, the L6s application requires an assessment of the organizational capability of contractors and an analysis of Human Performance Modes (HPM) to identify levels of construction workers’ productivity based on human competency and safety awareness that have never been done in this field.

Research limitations/implications

The action research will only focus on the contractors’ productivity and safety performances that are managed by infrastructure maintenance programs for managing integrity of ALE facilities in Indonesian upstream of oil field operations. Future research could go toward validating this approach in other sectors.

Practical implications

This paper discusses the implications of developing the hybrid KBPMS- L6s enriched with AHP methodology and the application of HPM analysis to achieve a 14% reduction in inefficient working time, a 28% reduction in supervision costs, a 15% reduction in schedule completion delays, and a 78% reduction in safety incident rates of Total Recordable Incident Rate (TRIR), Days Away Restricted or Job Transfer (DART) and Motor Vehicle Crash (MVC), as evidence of achieving fit-for-purpose KPIs with safer, better, faster, and at lower costs.

Social implications

This paper does not discuss social implications

Originality/value

This paper successfully demonstrates a novel use of Knowledge-Based system with the integration AHP and HPM analysis to develop a hybrid KBPMS-L6s concept that successfully increases contractor productivity without compromising human safety performance while implementing ALE facility infrastructure maintenance program in upstream oil field operations.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 15 December 2023

Nicola Castellano, Roberto Del Gobbo and Lorenzo Leto

The concept of productivity is central to performance management and decision-making, although it is complex and multifaceted. This paper aims to describe a methodology based on…

Abstract

Purpose

The concept of productivity is central to performance management and decision-making, although it is complex and multifaceted. This paper aims to describe a methodology based on the use of Big Data in a cluster analysis combined with a data envelopment analysis (DEA) that provides accurate and reliable productivity measures in a large network of retailers.

Design/methodology/approach

The methodology is described using a case study of a leading kitchen furniture producer. More specifically, Big Data is used in a two-step analysis prior to the DEA to automatically cluster a large number of retailers into groups that are homogeneous in terms of structural and environmental factors and assess a within-the-group level of productivity of the retailers.

Findings

The proposed methodology helps reduce the heterogeneity among the units analysed, which is a major concern in DEA applications. The data-driven factorial and clustering technique allows for maximum within-group homogeneity and between-group heterogeneity by reducing subjective bias and dimensionality, which is embedded with the use of Big Data.

Practical implications

The use of Big Data in clustering applied to productivity analysis can provide managers with data-driven information about the structural and socio-economic characteristics of retailers' catchment areas, which is important in establishing potential productivity performance and optimizing resource allocation. The improved productivity indexes enable the setting of targets that are coherent with retailers' potential, which increases motivation and commitment.

Originality/value

This article proposes an innovative technique to enhance the accuracy of productivity measures through the use of Big Data clustering and DEA. To the best of the authors’ knowledge, no attempts have been made to benefit from the use of Big Data in the literature on retail store productivity.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 11
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 1 April 2024

Mohammad Hani Al-Rifai

The purpose of this paper is twofold: first, a case study on applying lean principles in manufacturing operations to redesign and optimize an electronic device assembly process…

Abstract

Purpose

The purpose of this paper is twofold: first, a case study on applying lean principles in manufacturing operations to redesign and optimize an electronic device assembly process and its impact on performance and second, introducing cardboard prototyping as a Kaizen tool offering a novel approach to testing and simulating improvement scenarios.

Design/methodology/approach

The study employs value stream mapping, root cause analysis, and brainstorming tools to identify root causes of poor performance, followed by deploying a Kaizen event to redesign and optimize an electronic device assembly process. Using physical models, bottlenecks and opportunities for improvement were identified by the Kaizen approach at the workstations and assembly lines, enabling the testing of various scenarios and ideas. Changes in lead times, throughput, work in process inventory and assembly performance were analyzed and documented.

Findings

Pre- and post-improvement measures are provided to demonstrate the impact of the Kaizen event on the performance of the assembly cell. The study reveals that implementing lean tools and techniques reduced costs and increased throughput by reducing assembly cycle times, manufacturing lead time, space utilization, labor overtime and work-in-process inventory requirements.

Originality/value

This paper adds a new dimension to applying the Kaizen methodology in manufacturing processes by introducing cardboard prototyping, which offers a novel way of testing and simulating different scenarios for improvement. The paper describes the process implementation in detail, including the techniques and data utilized to improve the process.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 4
Type: Research Article
ISSN: 1741-0401

Keywords

1 – 10 of over 3000