1 – 10 of 62Patrik Jonsson, Johan Öhlin, Hafez Shurrab, Johan Bystedt, Azam Sheikh Muhammad and Vilhelm Verendel
This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?
Abstract
Purpose
This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?
Design/methodology/approach
A mixed-method case approach is applied. Explanatory variables are identified from the literature and explored in a qualitative analysis at an automotive original equipment manufacturer. Using logistic regression and random forest classification models, quantitative data (historical schedule transactions and internal data) enables the testing of the predictive difference of variables under various planning horizons and inaccuracy levels.
Findings
The effects on delivery schedule inaccuracies are contingent on a decoupling point, and a variable may have a combined amplifying (complexity generating) and stabilizing (complexity absorbing) moderating effect. Product complexity variables are significant regardless of the time horizon, and the item’s order life cycle is a significant variable with predictive differences that vary. Decoupling management is identified as a mechanism for generating complexity absorption capabilities contributing to delivery schedule accuracy.
Practical implications
The findings provide guidelines for exploring and finding patterns in specific variables to improve material delivery schedule inaccuracies and input into predictive forecasting models.
Originality/value
The findings contribute to explaining material delivery schedule variations, identifying potential root causes and moderators, empirically testing and validating effects and conceptualizing features that cause and moderate inaccuracies in relation to decoupling management and complexity theory literature?
Details
Keywords
Azim Mohammad, Abu Hamja and Peter Hasle
Shorter lead time with low price and quality product demand is pivotal in the garment industry. Pressure on production lead time stresses the importance of reducing style…
Abstract
Purpose
Shorter lead time with low price and quality product demand is pivotal in the garment industry. Pressure on production lead time stresses the importance of reducing style changeover time in manufacturing factories, and this paper aims to contribute to solving the challenge by showing how the single minute exchange of die (SMED) methodology in practice can be adapted to garment factories in developing countries.
Design/methodology/approach
The paper investigates three cases of SMED implementation integrated with responsible, accountable, consulted, informed (RACI) matrices in garment factories in an action research approach. Both quantitative and qualitative methods are applied.
Findings
The study shows a reduction of 50% to 64% of changeover time with SMED implementation measured with two key indicators – throughout time and time to reach peak production. Moreover, the implementation depends on the application of the RACI matrix for the distribution of responsibility as well as integration with the basic production flow before and after the application of SMED.
Practical implications
The study can guide better SMED implementation in garment factories with limited investment by stressing the need to adapt to the specifics of the garment industry, secure the division of responsibility and integrate SMED in the production flow before and after the changeover.
Originality/value
Limited research on the application of SMED in the garment industry. This paper contributes to understanding the specific conditions for successful implementation in the garment industry in developing countries and addresses additional activities that help secure a sustainable implementation process.
Details
Keywords
Elena Stefana, Paola Cocca, Federico Fantori, Filippo Marciano and Alessandro Marini
This paper aims to overcome the inability of both comparing loss costs and accounting for production resource losses of Overall Equipment Effectiveness (OEE)-related approaches.
Abstract
Purpose
This paper aims to overcome the inability of both comparing loss costs and accounting for production resource losses of Overall Equipment Effectiveness (OEE)-related approaches.
Design/methodology/approach
The authors conducted a literature review about the studies focusing on approaches combining OEE with monetary units and/or resource issues. The authors developed an approach based on Overall Equipment Cost Loss (OECL), introducing a component for the production resource consumption of a machine. A real case study about a smart multicenter three-spindle machine is used to test the applicability of the approach.
Findings
The paper proposes Resource Overall Equipment Cost Loss (ROECL), i.e. a new KPI expressed in monetary units that represents the total cost of losses (including production resource ones) caused by inefficiencies and deviations of the machine or equipment from its optimal operating status occurring over a specific time period. ROECL enables to quantify the variation of the product cost occurring when a machine or equipment changes its health status and to determine the actual product cost for a given production order. In the analysed case study, the most critical production orders showed an actual production cost about 60% higher than the minimal cost possible under the most efficient operating conditions.
Originality/value
The proposed approach may support both production and cost accounting managers during the identification of areas requiring attention and representing opportunities for improvement in terms of availability, performance, quality, and resource losses.
Details
Keywords
Michail Katsigiannis, Minas Pantelidakis and Konstantinos Mykoniatis
With hybrid simulation techniques getting popular for systems improvement in multiple fields, this study aims to provide insight on the use of hybrid simulation to assess the…
Abstract
Purpose
With hybrid simulation techniques getting popular for systems improvement in multiple fields, this study aims to provide insight on the use of hybrid simulation to assess the effect of lean manufacturing (LM) techniques on manufacturing facilities and the transition of a mass production (MP) facility to incorporating LM techniques.
Design/methodology/approach
In this paper, the authors apply a hybrid simulation approach to improve an educational automotive assembly line and provide guidelines for implementing different LM techniques. Specifically, the authors describe the design, development, verification and validation of a hybrid discrete-event and agent-based simulation model of a LEGO® car assembly line to analyze, improve and assess the system’s performance. The simulation approach examines the base model (MP) and an alternative scenario (just-in-time [JIT] with Heijunka).
Findings
The hybrid simulation approach effectively models the facility. The alternative simulation scenario (implementing JIT and Heijunka LM techniques) improved all examined performance metrics. In more detail, the system’s lead time was reduced by 47.37%, the throughput increased by 5.99% and the work-in-progress for workstations decreased by up to 56.73%.
Originality/value
This novel hybrid simulation approach provides insight and can be potentially extrapolated to model other manufacturing facilities and evaluate transition scenarios from MP to LM.
Details
Keywords
João Eduardo Sampaio Brasil, Fabio Antonio Sartori Piran, Daniel Pacheco Lacerda, Maria Isabel Wolf Morandi, Debora Oliveira da Silva and Miguel Afonso Sellitto
The purpose of this study is to evaluate the efficiency of a Brazilian steelmaking company’s reheating process of the hot rolling mill.
Abstract
Purpose
The purpose of this study is to evaluate the efficiency of a Brazilian steelmaking company’s reheating process of the hot rolling mill.
Design/methodology/approach
The research method is a quantitative modeling. The main research techniques are data envelopment analysis, TOBIT regression and simulation supported by artificial neural networks. The model’s input and output variables consist of the average billet weight, number of billets processed in a batch, gas consumption, thermal efficiency, backlog and production yield within a specific period. The analysis spans 20 months.
Findings
The key findings include an average current efficiency of 81%, identification of influential variables (average billet weight, billet count and gas consumption) and simulated analysis. Among the simulated scenarios, the most promising achieved an average efficiency of 95% through increased equipment availability and billet size.
Practical implications
Additional favorable simulated scenarios entail the utilization of higher pre-reheating temperatures for cold billets, representing a large amount of savings in gas consumption and a reduction in CO2 emissions.
Originality/value
This study’s primary innovation lies in providing steelmaking practitioners with a systematic approach to evaluating and enhancing the efficiency of reheating processes.
Details
Keywords
Frank Bodendorf, Sebastian Feilner and Joerg Franke
This paper aims to explore the significance of resource sharing in business to capture new market opportunities and securing competitive advantages. Firms enter strategic…
Abstract
Purpose
This paper aims to explore the significance of resource sharing in business to capture new market opportunities and securing competitive advantages. Firms enter strategic alliances (SAs), especially for designing new products and to overcome challenges in today’s fast changing environment. Research projects have dealt with the creation of SAs, however without concrete referencing the impact on selected supply chain resources. Furthermore, academia rather focused on elaborating the advantages and disadvantages of SAs and how this affects structural changes in the organization than examining the effects on supply chain complexity and performance.
Design/methodology/approach
The authors collected and triangulated a multi-industry data set containing primary data coming from more than 200 experts in the field of supply chain management along and secondary data coming from Refinitiv’s joint ventures (JVs) and SA database and IR solutions’ database for annual reports. The data is evaluated in three empirical settings using binomial testing and structural equation modeling.
Findings
The results show that nonequity SAs and JVs have varying degrees of impact on supply chain resources due to differences in the scope of the partnership. This has a negative impact on the complexity of the supply chain, with the creation of a JV leading to greater complexity than the creation of a nonequity SA. Furthermore, the findings prove that complexity negatively impacts overall supply chain performance. In addition, this study elaborates that increased management capabilities are needed to exploit the potentials of SAs and sheds light on hurdles that must be overcome within the supply network when forming a partnership. Finally, the authors give practical implications on how organizations can cope with increasing complexity to lower the risk of poor supply chain performance.
Originality/value
This study investigates occurring challenges when establishing nonequity SAs or JVs and how this affects their supply chain by examining supply networks in terms of complexity and performance.
Details
Keywords
Muhammad Imran, Abdul Sattar and Md Shabbir Alam
Economic ties and formation of trade blocks escalates the movement of goods among the participants and bring different economic and structural changes. Therefore, the current…
Abstract
Purpose
Economic ties and formation of trade blocks escalates the movement of goods among the participants and bring different economic and structural changes. Therefore, the current research emphasises on the distribution of market structure and industrial value added among the participant countries of China–Pakistan economic corridor project while focussing on pre and post FTA status.
Design/methodology/approach
This study utilises the footloose capital model for analysing whether China or Pakistan is more suitable for attracting factors of production to increase their share of industrial value added. For econometric analyses the current research utilises data from 1995 to 2018 and maximum likelihood effect method to assess factors that affect regional value-added distribution.
Findings
Results show that both countries owe different level of economic developments. Effect of capital is, comparatively, similar for both countries while Pakistan supports trade openness which points towards the fact of positive utilisation of abundant labour resources in Pakistan by establishing industrial structure either through domestic capital formation or foreign investment. Whereas, share of labour and trade openness of China positively affect value added production of China.
Originality/value
This is one of the unique studies that studies the regional economic treaties usefulness for any developing country across Asia. Where this study uses the footloose capital model and maximum likelihood method for its analysis which is not previously done, while for detailed analyses the study further divides the timeframe into two parts as pre-FTA ranges from 1995 to 2006, post-FTA from 2007 to 2018 while overall results consist of whole-time frame.
Details
Keywords
Marvin Gonzalez and Gioconda Quesada
The productivity of a port is a measure that is important to different stakeholders: port administrators (port authority), third-party logistics providers, manufacturers and…
Abstract
Purpose
The productivity of a port is a measure that is important to different stakeholders: port administrators (port authority), third-party logistics providers, manufacturers and consumers, among others. This study analyses productivity in terms of vessel movement efficiencies (loading/unloading of cargo) and container release from port facilities. Both factors add to the overall productivity in any port.
Design/methodology/approach
A comparative analysis of the productivity of three ports is measured using a Quality Function Deployment (QFD) and benchmarking analysis to help establish strategies that will help improve productivity. Considering the information confidentially the authors will call the ports according to their geographic location. The ports under study are the USA Southeast Port (Port of America), Central Asian Port (Port of Asia) and Central Europe Port (Port of Europe).
Findings
This study has established an analysis strategy that allows seeing points of sale in the ports. This study will compare three different continents, only to demonstrate the applicability of QFD and benchmarking. Still, the strategy can be used in ports that compete due to their proximity and location. Identifying the variables to be analyzed made it possible to establish a strategy to increase productivity.
Originality/value
There are many studies that analyze port productivity, but none try to standardize the variables to be compared in different scenarios. This study has compared three ports from three different geographical areas, using the same variables in all three cases. The study critically analyses the performance of three ports and proposes a strategy based on QFD and benchmarking research.
Details
Keywords
Abror Hoshimov, Anna Corinna Cagliano, Giulio Mangano, Maurizio Schenone and Sabrina Grimaldi
This paper aims to propose a simulation model integrated with an empirical regression analysis to provide a new mathematical formulation for automated storage and retrieval system…
Abstract
Purpose
This paper aims to propose a simulation model integrated with an empirical regression analysis to provide a new mathematical formulation for automated storage and retrieval system (AS/RS) travel time estimation under class-based storage and different input/output (I/O) point vertical levels.
Design/methodology/approach
A simulation approach is adopted to compute the travel time under different warehouse scenarios. Simulation runs with several I/O point levels and multiple shape factor values.
Findings
The proposed model is extremely precise for both single command (SC) and dual command (DC) cycles and very well fitted for a reliable computation of travel times.
Research limitations/implications
The proposed mathematical formulation for estimating the AS/RS travel time advances widely applied methodologies existing in literature. As well as, it provides a practical implication by supporting faster and more accurate travel time computations for both SC and DC cycles. However, the regression analysis is conducted based on simulated data and can be refined by numerical values coming from real warehouses.
Originality/value
This work provides a new simulation model and a refined mathematical equation to estimate AS/RS travel time.
Details
Keywords
Innocent Chigozie Osuizugbo, Fidelis Okechukwu Ezeokoli, Kevin Chuks Okolie and Aduragbemi Deborah Olojo
The application of good buildability practices is vital for improving the performance of projects and businesses in the construction sector. Despite the plethora of research into…
Abstract
Purpose
The application of good buildability practices is vital for improving the performance of projects and businesses in the construction sector. Despite the plethora of research into buildability in construction in the previous years, there is little information concerning how buildability practice can be successfully implemented. This paper aims to develop a conceptual framework that explains how buildability practice can be implemented successfully in the construction industry.
Design/methodology/approach
The paper uses an integrative literature review method to synthesise literature from different domains to describe various themes by which buildability assessment can be successfully implemented in the construction industry.
Findings
The findings of the review of literature conceptualised a buildability implementation framework at four principal themes: buildability attributes for improving the practice of construction management, factors supporting the implementation of buildability assessment, measures for improving the buildability of building designs and factors impeding the implementation of buildability assessment.
Originality/value
The outcome of this study contributes to knowledge in three different ways. First, the framework emerging from this study provides guidance to stakeholders on strategies for the successful implementation of buildability. Second, the information gathered in this study is useful for the development of buildability assessment tool. Finally, the framework has a potential of improving the practice of embedding buildability into designs. The detailed descriptions of the relevant variables at each principal theme advance the understanding of buildability in the construction industry and are fundamental to developing buildability assessment tools for the industry.