Article
Publication date: 23 January 2023

Bruno Falcón Silveira and Dayana Bastos Costa

Several studies have addressed the use of four-dimensional (4D) building information modeling (BIM) for construction management. However, the automation of the processes for…

Abstract

Purpose

Several studies have addressed the use of four-dimensional (4D) building information modeling (BIM) for construction management. However, the automation of the processes for generating 4D models and their integrated use with Location-Based Planning and the Last Planner® System is not well discussed. Therefore, this paper aims to develop a method for automating the generation and use of 4D BIM models integrated with Location-Based Planning and Last Planner® System supporting project control cycles.

Design/methodology/approach

The research strategy adopted was Design Science Research. The automated method for using the 4D models was developed and refined in two residential building projects in Brazil, along with 31 meetings and involving 11 direct users. The assessment of the proposed method focuses on four constructs: the impact of process automation, the impact on the identification and assessment of site progress and the planning process, ease of adoption and utility of the proposed method.

Findings

The results of this paper indicated increased adherence between planned and executed through an automated method for using the 4D models. The established routines enabled automating the link between the planning levels and the three-dimensional (3D) model, providing a more agile and updated data source and achieving 92.8% of user satisfaction regarding the deadline and frequency of delivery of the 4D model reports. Moreover, this study identified the relationships between the processes of the method proposed and Digital Models.

Originality/value

The primary scientific value achieved in this study is creating a method for automating processes and simplifying steps for the generation and use of 4D BIM models in the production planning and control cycles during the construction phase.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 6 March 2023

Ningshuang Zeng, Xuling Ye, Yan Liu and Markus König

The unstable labor productivity and periodic planning method cause barriers to improving construction logistics management. This paper aims to explore a demand-driven mechanism…

Abstract

Purpose

The unstable labor productivity and periodic planning method cause barriers to improving construction logistics management. This paper aims to explore a demand-driven mechanism for efficient construction logistics planning to record the material consumption, report the real-time demand and trigger material replenishment from off-site to on-site, which is aided by Building Information Modeling (BIM) and the Kanban technique.

Design/methodology/approach

This paper follows the design science research (DSR) principles to propose a system of designing and applying Kanban batch with 4D BIM for construction logistics planning and monitoring. Prototype development with comparative simulation experiments of a river remediation project is conducted to analyze the conventional and Kanban-triggered supply. Two-staged industrial interviews are conducted to guide and evaluate the system design.

Findings

The proposed BIM-enabled Kanban system enables construction managers and suppliers to better set integrated on- and off-site targets, report real-time demands and conduct collaborative planning and monitoring. The simulation results present significant site storage and schedule savings applying the BIM-enabled Kanban system. Feedback and constructive suggestions from practitioners are collected via interviews and analyzed for further development.

Originality/value

This paper brings to the limelight the benefits of implementing BIM-enabled demand-driven replenishment to remove waste from the material flow. This paper combines lean production theory with advanced information technology to solve construction logistics management problems.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 February 2024

Moslem Sheikhkhoshkar, Hind Bril El Haouzi, Alexis Aubry and Farook Hamzeh

In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control…

Abstract

Purpose

In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control metrics have been devised and put into practice, often with little emphasis on analyzing their underlying concepts. To cover this gap, this research aims to identify and analyze a holistic list of control metrics and their functionalities in the construction industry.

Design/methodology/approach

A multi-step analytical approach was conducted to achieve the study’s objectives. First, a holistic list of control metrics and their functionalities in the construction industry was identified. Second, a quantitative analysis based on social network analysis (SNA) was implemented to discover the most important functionalities.

Findings

The results revealed that the most important control metrics' functionalities (CMF) could differ depending on the type of metrics (lagging and leading) and levels of control. However, in general, the most significant functionalities include managing project progress and performance, evaluating the look-ahead level’s performance, measuring the reliability and stability of workflow, measuring the make-ready process, constraint management and measuring the quality of construction flow.

Originality/value

This research will assist the project team in getting a comprehensive sensemaking of planning and control systems and their functionalities to plan and control different dynamic aspects of the project.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 5 February 2024

Swarup Mukherjee, Anupam De and Supriyo Roy

Identifying and prioritizing supply chain risk is significant from any product’s quality and reliability perspective. Under an input-process-output workflow, conventional risk…

Abstract

Purpose

Identifying and prioritizing supply chain risk is significant from any product’s quality and reliability perspective. Under an input-process-output workflow, conventional risk prioritization uses a risk priority number (RPN) aligned to the risk analysis. Imprecise information coupled with a lack of dealing with hesitancy margins enlarges the scope, leading to improper assessment of risks. This significantly affects monitoring quality and performance. Against the backdrop, a methodology that identifies and prioritizes the operational supply chain risk factors signifies better risk assessment.

Design/methodology/approach

The study proposes a multi-criteria model for risk prioritization involving multiple decision-makers (DMs). The methodology offers a robust, hybrid system based on the Intuitionistic Fuzzy (IF) Set merged with the “Technique for Order Performance by Similarity to Ideal Solution.” The nature of the model is robust. The same is shown by applying fuzzy concepts under multi-criteria decision-making (MCDM) to prioritize the identified business risks for better assessment.

Findings

The proposed IF Technique for Order Preference by Similarity to the Ideal Solution (TOPSIS) for risk prioritization model can improve the decisions within organizations that make up the chains, thus guaranteeing a “better quality in risk management.” Establishing an efficient representation of uncertain information related to traditional failure mode and effects analysis (FMEA) treatment involving multiple DMs means identifying potential risks in advance and providing better supply chain control.

Research limitations/implications

In a company’s supply chain, blockchain allows data storage and transparent transmission of flows with traceability, privacy, security and transparency (Roy et al., 2022). They asserted that blockchain technology has great potential for traceability. Since risk assessment in supply chain operations can be treated as a traceability problem, further research is needed to use blockchain technologies. Lastly, issues like risk will be better assessed if predicted well; further research demands the suitability of applying predictive analysis on risk.

Practical implications

The study proposes a hybrid framework based on the generic risk assessment and MCDM methodologies under a fuzzy environment system. By this, the authors try to address the supply chain risk assessment and mitigation framework better than the conventional one. To the best of their knowledge, no study is found in existing literature attempting to explore the efficacy of the proposed hybrid approach over the traditional RPN system in prime sectors like steel (with production planning data). The validation experiment indicates the effectiveness of the results obtained from the proposed IF TOPSIS Approach to Risk Prioritization methodology is more practical and resembles the actual scenario compared to those obtained using the traditional RPN system (Kim et al., 2018; Kumar et al., 2018).

Originality/value

This study provides mathematical models to simulate the supply chain risk assessment, thus helping the manufacturer rank the risk level. In the end, the authors apply this model in a big-sized organization to validate its accuracy. The authors validate the proposed approach to an integrated steel plant impacting the production planning process. The model’s outcome substantially adds value to the current risk assessment and prioritization, significantly affecting better risk management quality.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 19 June 2023

Mirela Schramm Tonetto, Carlos Torres Formoso, Tarcisio Abreu Saurin, Fabiana Bonesi De Luca, Fernanda Pavan Lora and Elvira Lantelme

The COVID-19 pandemic offered a unique glimpse into the resilience of construction projects, shedding light on several learning opportunities. The purpose of this paper is to…

Abstract

Purpose

The COVID-19 pandemic offered a unique glimpse into the resilience of construction projects, shedding light on several learning opportunities. The purpose of this paper is to develop propositions for the improvement of resilient performance in construction in the post-pandemic era.

Design/methodology/approach

The propositions were developed based on an empirical study in Brazil. Data collection involved the analysis of regulations, interviews with health experts, managers, and workers, in addition to non-participant observations of the use of 37 control practices in 39 construction sites comparing the work-as-imagined and the work-as-done. The practices were classified in a hierarchy of controls.

Findings

Seven propositions for the improvement of resilient performance were developed, addressing collaboration between construction companies, slack resources, new health and safety practices, production planning and control, digital technologies, visual management, and organizational culture. These propositions emphasize organizational support for resilience. This is in contrast to the nature of most observed practices (57%) that relied on administrative controls and personal protective equipment, which are measures dependent on behaviors that resemble resilience at the individual level.

Originality/value

Although much has been studied on COVID-19 implications for construction projects, previous empirical studies have not adopted the organizational resilience perspective as the main theoretical background.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 January 2023

Emmanuel Itodo Daniel, Olalekan Oshodi, Daniel Dabara and Nenpin Dimka

Housing provides constructed space for human activities. Literature indicates that housing impacts wealth, education attainment and health outcomes, among others. Because of its…

Abstract

Purpose

Housing provides constructed space for human activities. Literature indicates that housing impacts wealth, education attainment and health outcomes, among others. Because of its contributions to society, it is essential to develop and implement strategies that address the housing shortage experienced in most cities across the globe. This study aims to unpack the factors affecting housing production in the UK and chart the way forward.

Design/methodology/approach

In addressing this study's aim, an interprivitst approach was adopted and semi-structured interviews were conducted with 18 experienced professionals. Data were collected across the four nations of the UK (England, Wales, Scotland and Northern Ireland).

Findings

The results indicated that the opportunistic behaviour of stakeholders is one of the main factors affecting housing production in the study area. Also, modern construction methods, collaborative practices, government intervention and affordable housing schemes were identified as key strategies for addressing housing production factors.

Practical implications

This study identified strategies for mitigating housing production issues that provide a focal point to all stakeholders keen on filling the housing shortage gap and improving productivity to channel their resources and effort accordingly.

Originality/value

To the best of the authors’ knowledge, this study is one of the first to empirically analyse the influencing factors on the housing gap in the UK from the perspective of the supply side to provide information that could lead towards closing the said gap.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 19 October 2023

Mohamed Saad Bajjou and Anas Chafi

Lean construction (LC) consists of very effective techniques; however, its implementation varies considerably from one industry to another. Although numerous lean initiatives do…

Abstract

Purpose

Lean construction (LC) consists of very effective techniques; however, its implementation varies considerably from one industry to another. Although numerous lean initiatives do exist in the construction industry, the research topic related to LC implementation is still unexplored due to the scarcity of validated assessment frameworks. This study aims to provide the first attempt in developing a structural model for successful LC implementation.

Design/methodology/approach

This study developed a Lean construction model (LCM) by critically reviewing seven previous LC frameworks from different countries, defining 18 subprinciples grouped into 6 major principles and formulating testable hypotheses. The questionnaire was pre-tested with 12 construction management experts and revised by 4 specialized academics. A pilot study with 20 construction units enhanced content reliability. Data from 307 Moroccan construction companies were collected to develop a measurement model. SPSS V. 26 was used for Exploratory Factor Analysis, followed by confirmatory factor analysis using AMOS version 23. Finally, a structural equation model statistically assessed each construct's contribution to the success of LC implementation.

Findings

This work led to the development of an original LCM based on valid and reliable LC constructs, consisting of 18 measurement items grouped into 6 LC principles: Process Transparency, People involvement, Waste elimination, Planning and Continuous improvement, Client Focus and Material/information flow and pull. According to the structural model, LC implementation success is positively influenced by Planning and Scheduling/continuous improvement (β = 0.930), followed by Elimination of waste (β = 0.896). Process transparency ranks third (β = 0.858). The study demonstrates that all these factors are mutually complementary, highlighting a positive relationship between LC implementation success and the holistic application of all LC principles.

Originality/value

To the best of the authors’ knowledge, this study is the first attempt to develop a statistically proven model of LC based on structural equation modelling analysis, which is promising for stimulating construction practitioners and researchers for more empirical studies in different countries to obtain a more accurate reflection of LC implementation. Moreover, the paper proposes recommendations to help policymakers, academics and practitioners anticipate the key success drivers for more successful LC implementation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 January 2023

Juliana de Jesus Mendes, Marcelo José Carrer, Marcela de Mello Brandão Vinholis and Hildo Meirelles de Souza Filho

This study aimed to identify the determinants of farmers' participation in agricultural information-sharing digital groups and their impacts on farm performance.

Abstract

Purpose

This study aimed to identify the determinants of farmers' participation in agricultural information-sharing digital groups and their impacts on farm performance.

Design/methodology/approach

Primary data of the 2015/2016 crop year collected from 175 cattle farmers were analyzed using descriptive statistics and econometric models. Farmers who had smartphones and participated in social groups/applications, especially those created to exchange agricultural information, were considered adopters of the technology.

Findings

A Poisson hurdle model showed that farmers' decision to participate in agricultural information-sharing digital groups is determined by schooling, age (negative effect) and use of tools for planning production. The intensity of participation is affected by risk propensity, interaction with specialist advisors, use of tools for planning production and participation in cooperatives. The authors also found empirical evidence that farmers' participation in agricultural information-sharing digital groups positively affects farm income per hectare.

Research limitations/implications

The results of this study are important for accelerating the diffusion of low-cost digital technologies, which are powerful tools for improving farmers' sharing and access to valuable information in real time and in locations far from urban areas.

Originality/value

To the best of the authors’ knowledge, this is the first empirical analysis of the adoption and impacts of agricultural information-sharing digital groups/applications by Brazilian cattle farmers. The diffusion of simple digital technologies is important for reducing heterogeneity and increasing the efficiency of cattle production.

Details

Journal of Agribusiness in Developing and Emerging Economies, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-0839

Keywords

Article
Publication date: 28 July 2023

G. Citybabu and S. Yamini

This research aims to conduct a literature review of Lean Six Sigma (LSS) in the Indian context and related research publications and apply bibliometric analysis and the author's…

Abstract

Purpose

This research aims to conduct a literature review of Lean Six Sigma (LSS) in the Indian context and related research publications and apply bibliometric analysis and the author's visualization to map research trends in this area.

Design/methodology/approach

This article conducts a bibliometric analysis of LSS-related research in the Indian context using data gathered from Scopus and Web of Science databases from 2011 to 2022. The review provides information on LSS-related research in the Indian context and evaluates performance based on primary sources, authors, keywords, countries, affiliations, and documents. The analysis employs the Biblioshiny app and Bibliometrix R-tool for data analysis and scientific mapping.

Findings

The results of the bibliometric analysis indicate that the LSS culture has widely spread in India. The International Journal of Lean Six Sigma and Production Planning and Control were found to be the most productive sources for publishing LSS-related research articles. Antony J. was identified as the most active author in this field, contributing the most over the years. Among all organizations, NITs have conducted the most comprehensive research on LSS, indicating their significant investment of resources and efforts in studying this methodology and its applications in India. Additionally, the study examined the intellectual, social, and conceptual structures to identify implicit gaps and future research opportunities.

Practical implications

The findings of this study can inform academicians, researchers, practitioners, and policymakers about the state-of-the-art and the specifics of the most prolific studies. This study will facilitate their exploration of emerging research areas in LSS.

Originality/value

To the best of the authors knowledge, this is the first bibliometric analysis of LSS in the Indian context, providing an overview of relevant publications published between 2011 and 2022. This study analyzed 194 articles on LSS in India, which can help researchers and academics identify emerging research areas, suitable collaborators, and relevant journals for future publications.

Details

The TQM Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1754-2731

Keywords

Article
Publication date: 7 November 2023

Panitas Sureeyatanapas, Danai Pancharoen and Khwantri Saengprachatanarug

Industry 4.0 is recognised as a competitive strategy that helps implementers optimise their value chain. However, its adoption poses several challenges. This study investigates…

111

Abstract

Purpose

Industry 4.0 is recognised as a competitive strategy that helps implementers optimise their value chain. However, its adoption poses several challenges. This study investigates and ranks the drivers and barriers to implementing Industry 4.0 in the Thai sugar industry, the world's second-largest sugar exporter. It also evaluates the industry's readiness for Industry 4.0.

Design/methodology/approach

The drivers and impediments were identified based on a systematic literature review (SLR) and further investigated using a questionnaire, expert interviews, Pearson's correlation and nonparametric statistical analyses. The IMPULS model was used to assess the industry's readiness.

Findings

Most companies expect to minimise costs, develop employees and improve various elements of operational performance and data tracking capability. Thai sugar producers are still at a low readiness level to deploy Industry 4.0. High investment is the major challenge. Small businesses struggle to hire competent employees, collaborate with a highly credible technology provider and adapt to new solutions.

Practical implications

The findings can serve as a benchmark or guide for sugar manufacturers and companies in other sectors, where Industry 4.0 technologies are not yet widely utilised, to overcome existing roadblocks and make strategic decisions. They can also assist governments in developing policies that foster digital transformation and increase national competitiveness.

Originality/value

There is a scarcity of research on Industry 4.0 execution in the sugar industry. This study addresses this gap by investigating the reasons for the hesitancy of sugar producers to pursue Industry 4.0 and proposing solutions.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords