Search results

1 – 10 of over 23000
Article
Publication date: 1 July 1978

Ronald L. Schill

Since 1973–74, the beginning of the so‐called resources crunch, there has been an increased emphasis upon the role of the procurement function in strategic corporate planning and

Abstract

Since 1973–74, the beginning of the so‐called resources crunch, there has been an increased emphasis upon the role of the procurement function in strategic corporate planning and management. The role of procurement has begun significant change in a number of companies, yet remains in basically an operational mode in others. However, strategic management has often been “borne” out of situational crises imposed by changing environmental factors, rather than as a result of recognition of the strategic potential which management has. In essence, changes often come through reaction to problems, rather than through positive recognition and implementation of strategic management as an initiative itself. This has been particularly true of procurement.

Details

International Journal of Physical Distribution & Materials Management, vol. 9 no. 2
Type: Research Article
ISSN: 0269-8218

Article
Publication date: 11 November 2013

Lu Weisheng, Anita M.M. Liu, Wang Hongdi and Wu Zhongbing

The purpose of this paper is to attempt to shed light on procurement innovation by examining two state-of-the-art procurement systems in China – an agent-construction system (ACS…

4914

Abstract

Purpose

The purpose of this paper is to attempt to shed light on procurement innovation by examining two state-of-the-art procurement systems in China – an agent-construction system (ACS or in Chinese Dai Jian Zhi) and public-private partnership (PPP), with special consideration given to the systems’ particular political, economic, social, technological, environmental, and legal (PESTEL) background.

Design/methodology/approach

The paper does so by using content analyses, semi-structured interviews, and a “PESTEL-Procurement Innovation” framework.

Findings

It is found that PPP has not been as popular as expected, while the ACS, which is little known to the international construction management community, is widespread in China. The study of ACS and PPP further reveals that congruence between a procurement system and its external PESTEL conditions is essential for procurement innovation.

Research limitations/implications

The “PESTEL-Procurement Innovation” framework could be a useful tool for devising procurement innovation; although there are many questions yet to be answered by further research.

Practical implications

The paper provides useful insights into procurement innovation, particularly when governments worldwide are searching for innovative procurement systems to help deliver public projects and services.

Originality/value

The paper possesses originality in that it tackles procurement innovation, an area that is under researched in construction management. It exhorts the re-connection between a procurement system and its external PESTEL conditions for devising bona fide procurement innovations.

Details

Engineering, Construction and Architectural Management, vol. 20 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 July 2022

Veer Shivajee, Rajesh Kumar Singh and Sanjay Rastogi

This study aims to provide a rich learning opportunity from COVID-19 crisis for making resilient supply chain by adopting new strategies for the procurement system.

1664

Abstract

Purpose

This study aims to provide a rich learning opportunity from COVID-19 crisis for making resilient supply chain by adopting new strategies for the procurement system.

Design/methodology/approach

The systematic literature review has been conducted from the year 2012 to 2022 with the objective of developing procurement system for resilient supply chain. Fifty-four research papers are selected for this study.

Findings

The study exhibits that procurement function makes a significant contribution in creating supply chain resilience in the time of COVID-19 pandemic. The COVID-19 emergency has enforced companies to operate in new ways to face supply chain disruptions. The new strategies and actions appropriate for resilient procurement system have been identified.

Research limitations/implications

This study is limited to the papers that were indexed in the Scopus database. It has also been limited to the procurement function and supply chain resilience.

Practical implications

This research highlights strategies for supply chain resilience to improve the business performance in COVID-19 or similar types of crisis.

Originality/value

The originality of this paper is to identify the strategies and new practices followed in procurement function to improve the supply chain resilience. This study suggests directions for future research on the integration of procurement and manufacturing for making resilience in the supply chain.

Details

Journal of Global Operations and Strategic Sourcing, vol. 16 no. 2
Type: Research Article
ISSN: 2398-5364

Keywords

Article
Publication date: 1 January 2001

JOHN E. TOOKEY, MICHAEL MURRAY, CLIFF HARDCASTLE and DAVID LANGFORD

Today there are a number of different types of procurement routes available for clients to choose from. Each different type of procurement (traditional, design and build…

6184

Abstract

Today there are a number of different types of procurement routes available for clients to choose from. Each different type of procurement (traditional, design and build, management, etc.) has its own proponents and inherent strengths and weaknesses. Selection of optimal procurement systems is difficult, because even experienced clients cannot know all the potential benefits or risks for each system. Procurement is, therefore, a succession of ‘calculated risks’. Industry and academia have focussed research on reducing procurement risk through better procurementsystem selection methods. Current research considers procurement as a set of rationalistic decisions within a closed environment, aiming to produce generic, prescriptive rules for clients and advisers to use to select the ‘best’ procurement route for their project. This paper seeks to identify whether prescriptive procurement guidance was adhered to on a set of case study projects. It was found that clients usually selected appropriate procurement systems, and where an inappropriate system was selected, alterations were made in contract form to incorporate aspects of the ‘best’ procurement route.

Details

Engineering, Construction and Architectural Management, vol. 8 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 September 2021

Abimbola Windapo, Abdulrauf Adediran, James Olabode Bamidele Rotimi and Nnedinma Umeokafor

This study aims to investigate whether clients’ knowledge about construction procurement systems influence project performance objectives and the role of procurement systems on…

Abstract

Purpose

This study aims to investigate whether clients’ knowledge about construction procurement systems influence project performance objectives and the role of procurement systems on project performance objectives in South Africa.

Design/methodology/approach

Using a two-round survey, 90 usable questionnaires from construction professionals in South Africa plus 3 expert clients were collected. The data were analysed using descriptive statistics – means, percentages and the analytical hierarchy process to determine the rank of client project performance criteria, while inferential statistics – Pearson product-moment correlation was used in establishing the relationship between the level of clients’ knowledge and project performance.

Findings

It was found that the common procurement systems used are traditional, followed by management-oriented and integrated procurement systems. In addition, it emerged that client’s knowledge of procurement systems shows a positive relationship with the achievement of project performance objectives. Based on these findings, it is concluded that some procurement systems being selected by clients in South Africa are inappropriately selected. This is despite the emergence of more efficient procurement systems. If procurement systems are selected based on the knowledge of the client, it will give better chances of a successful project outcome.

Practical implications

The research suggests the need for clients to seek ways to improve their understanding or increase their knowledge of procurement systems in construction. Policymakers’ responsibilities in driving policies that will place responsibilities on clients to seek a reasonable way to improve their knowledge where possible is implied in the study.

Originality/value

It contributes to improving project performance by examining whether the level of knowledge possessed by a client influences project performance.

Details

Journal of Engineering, Design and Technology , vol. 20 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 1 April 2001

Khi V. Thai

Academically, public procurement has been a neglected area of study even though governmental entities and public procurement practitioners have diligently worked to improve public…

1937

Abstract

Academically, public procurement has been a neglected area of study even though governmental entities and public procurement practitioners have diligently worked to improve public procurement practices. This article will identify common elements of public procurement knowledge through a brief analysis of the literature and will provide a summary of government efforts to improve public procurement practices. In addition, this article will comprehensively re-examine public procurement by using a systems approach as a method of inquiry. Finally, implications of the proposed public procurement system regarding future research and study will be discussed.

Details

Journal of Public Procurement, vol. 1 no. 1
Type: Research Article
ISSN: 1535-0118

Open Access
Article
Publication date: 3 January 2024

Leticia Mahuwi and Baraka Israel

Understanding the interplay between transparency, accountability and e-procurement and their collective contribution to anti-corruption efforts in public procurement is crucial…

Abstract

Purpose

Understanding the interplay between transparency, accountability and e-procurement and their collective contribution to anti-corruption efforts in public procurement is crucial for developing effective strategies and policies. This research seeks to investigate whether e-procurement plays a significant role in enhancing transparency and accountability and subsequently reducing corruption risks in the public pharmaceutical procurement system.

Design/methodology/approach

The study employed a cross-sectional questionnaire survey to gather data from 274 procurement personnel and pharmacists working in 28 government-owned hospitals in the Southern Highlands of Tanzania. The collected data were then analysed using confirmatory factor analysis (CFA) and the Hayes PROCESS macro to test the study hypotheses.

Findings

The study findings revealed a negative and significant relationship between transparency and procurement corruption (ß = −0.117, p < 0.008). Moreover, accountability negatively and significantly affects procurement corruption (ß = −0.162, p = 0.006). Furthermore, the findings indicate that, at a high degree of e-procurement system implementation, transparency and accountability have a stronger impact on procurement anti-corruption measures.

Practical implications

Policymakers and decision-makers should implement robust mechanisms that enhance transparency, accountability and anti-corruption efforts. These may include providing clear and accessible information on procurement processes, efficient mechanisms for monitoring and reporting procurement irregularities and continuous improvement of e-procurement systems. By incorporating these measures and nurturing collaboration amongst procurement stakeholders, it becomes possible to foster a procurement environment characterised by integrity, fairness, accountability and reduced corruption.

Originality/value

Whilst previous studies delved into exploring the effect of transparency and accountability on procurement anti-corruption, the novelty of this study is the inclusion of e-procurement as a moderating variable in the relationship between transparency, accountability and anti-corruption. By so doing, this study adds to the existing body of knowledge regarding anti-corruption measures and offers valuable practical insights for policymakers and professionals aiming to enhance transparency, accountability and ethical conduct within the public pharmaceutical procurement system.

Details

Management Matters, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2279-0187

Keywords

Open Access
Article
Publication date: 16 November 2022

David Špaček and Zuzana Špačková

Scholarly research on e-procurement has been limited and, like e-government, e-procurement has been researched primarily from the perspective of adoption/non-adoption. This paper…

1620

Abstract

Purpose

Scholarly research on e-procurement has been limited and, like e-government, e-procurement has been researched primarily from the perspective of adoption/non-adoption. This paper aims to focus on public administration employees’ perceptions of the quality of národní elektronický nástroj (NEN) – the Czech national e-procurement tool they are required to use.

Design/methodology/approach

The paper is based primarily on statistical analysis of data obtained through two questionnaire surveys addressed to contacts from of all Czech central state administration bodies using NEN; 175 completed questionnaires were gathered in 2020 and 128 in 2022 and subjected to statistical analysis in SPSS.

Findings

NEN was launched as fully operational in August 2015. The research indicates that in 2022 there were still important gaps in the quality of NEN as perceived by public employees.

Social implications

The paper has important practical implications for e-procurement policymakers. It shows that making the e-procurement system compulsory is not sufficient. The government needs to guarantee that it would be competitive with tools that would otherwise be preferred. Otherwise, the application of the digital-by-default principle may lead to institutionalisation of services that are not user-friendly. This has important implications for e-government/e-procurement management and change management.

Originality/value

Little is known about public employees’ perceptions of the quality of e-government and e-procurement. Although e-procurement is an area where the digital-by-default principle was implemented rather early, the quality of e-procurement has still received limited attention in research.

Details

Journal of Public Procurement, vol. 23 no. 1
Type: Research Article
ISSN: 1535-0118

Keywords

Article
Publication date: 28 March 2023

Dmaithan Abdelkarim Almajali, Tha’er Majali, Ra'ed Masa'deh, Mohmood Ghaleb Al-Bashayreh and Ahmad Mousa Altamimi

The commonly used e-procurement systems still show unsatisfactory implementation outcomes because many organisations are still unable to effectively interpret the initial adoption…

522

Abstract

Purpose

The commonly used e-procurement systems still show unsatisfactory implementation outcomes because many organisations are still unable to effectively interpret the initial adoption decision. The e-procurement systems are generally developed at organisational level, but their usage is at individual level, by the employees particularly. This paper examined technology acceptance model’s (TAM) key antecedents, involving e-procurement systems usage by employees in their daily activities. This study aims to examine the impact of factors affecting e-procurement acceptance among users through the mediating role of users’ attitude. The commonly used e-procurement systems still show.

Design/methodology/approach

TAM was applied and expanded in this study, in exploring the factors impacting the employees’ e-procurement acceptance. This study used quantitative method, and questionnaires were distributed to 200 users in Jordanian public shareholding firms. The collected data were quantitatively analysed using PLS modelling.

Findings

Significant TAM relationships involving e-procurement were affirmed. The expanded TAM in the scrutiny of antecedents showed that content, processing and usability affected perceived usefulness, while perceived convenience did not affect the usefulness factor. Furthermore, it was noticed that perceived ease of use was affected by usability and training, while perceived connectedness was not affected by usability and training.

Practical implications

The results demonstrated the necessity of e-procurement training. Furthermore, at the start of the implementation stage, effective design on system navigation and system usability, and consistent support, could increase use effectiveness and acceptance. Also, expedient information and buyer–supplier product flows should be made available.

Originality/value

Most organizations invest a lot of time and money in installing e-procurement systems to deliver their goods at the right time and at the right price. However, many of these e-procurement systems have failed due to low acceptance among users. Thus, to the best of the authors’ knowledge, this is the first study that used TAM and theory of planned behaviour in examining the effects of perceived convenience, perceived connectedness, content, training, processing and usability factors, in Jordanian firms. Lastly, the focus of this study was on the individual employee’s acceptance, rather than on the organisational-level adoption, as the unit of analysis, to provide insight on how organisations can achieve maximally from e-procurement investments and from other comparable technologies of e-supply chain management.

Details

Journal of Consumer Marketing, vol. 40 no. 6
Type: Research Article
ISSN: 0736-3761

Keywords

Article
Publication date: 30 August 2019

Yang Wang, Jing Liu, Jian Zuo and Raufdeen Rameezdeen

The purpose of this paper is to investigate driving factors that improve the project management efficiency (PME) in centralized public procurement systems.

1102

Abstract

Purpose

The purpose of this paper is to investigate driving factors that improve the project management efficiency (PME) in centralized public procurement systems.

Design/methodology/approach

Employees in four public-sector organizations in China were surveyed. The structural equation modeling was employed to examine the relationship amongst those variables.

Findings

Organizational culture (OC) is an effective method to improve PME, and employee quality is the most critical factor of OC in this system. Job satisfaction (JS) is another significant contributor to PME and satisfaction with fairness of salary in this system being the key factor of JS. Job analysis (JA) has indirect influence on PME through JS and OC, whereas the job structure in this system is the most critical factor for JA.

Practical implications

An operational way to improve PME is to implement it from the perspectives of employee, organization and technique. At the organizational level, it is imperative to strengthen the OC by a well-structured recruitment system and to improve PME via well-design training. At the person level, both financial (i.e. income and welfare) and career incentives (i.e. promotion opportunities and a sense of belonging) are proposed to achieve employees’ JS to improve PME. At the technique level, JA approach (i.e. job rotation) is recommended to enlarge the positive influence of OC and JS on PME. These can not only ensure the management professionalism in a centralized public procurement system but can also motivate employees and maximize PME.

Originality/value

PME in a centralized public procurement system will be improved by addressing these key factors and their interrelationships. This provides detailed pathways for the centralized public procurement system to achieve better PME via optimal OC and JS and reasonable JA in China. In addition, the institutional and administrative traditions may vary significantly across cities, regions and countries. Therefore, such contextual differences should be taken into consideration for the improvement of PME in a centralized public procurement system.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 23000