Search results

1 – 10 of 341
Article
Publication date: 16 April 2024

Tung-Cheng Lin and Mei-Ling Yeh

The ecosystem concept has attracted attention in information system research to explain business competition, innovation and many other emerging phenomena. Existing studies focus…

Abstract

Purpose

The ecosystem concept has attracted attention in information system research to explain business competition, innovation and many other emerging phenomena. Existing studies focus more on a single ecosystem type or a single ecosystem goal and pay little attention to the ecosystem’s evolution. The objective of the study is to investigate the factors that impact the evolution of the information ecosystem (IE) to gain a better understanding of strategic thinking.

Design/methodology/approach

The IE involves many actors, so the multi-case study approach is conducted with purposeful sampling to recruit all the significant ecosystem actors. The collected qualitative data are analyzed by coding data, exploring data relationships and structuring pattern steps; institutional theory is used as a theoretical framework.

Findings

The results demonstrate that industry practices, laws and regulations, new actors and the mimetic pressure of outsourcers drive the growth of the ecosystem. Strategy intention, cost pressure and normative pressure all contribute to the IE’s evolution.

Originality/value

The concept of ecosystems has attracted attention in information system research. The study investigates the factors contributing to the evolution of the IE from an institutional theory perspective. Our suggestion is that new players can find a niche in offering information technology (IT)/ information services (IS)-related solutions to survive in the ecosystem; however, they need to pay attention to the normative pressure.

Details

Aslib Journal of Information Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2050-3806

Keywords

Article
Publication date: 22 March 2024

Ramgy Pararajasingam, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a…

Abstract

Purpose

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a critical issue in the construction industry, especially in developing economies, of which Sri Lanka is not an exception. Therefore, this study aims to focus on exploring the causes of ineffective material management practices in civil engineering construction projects in Sri Lanka and their impact on successful project delivery.

Design/methodology/approach

Furthermore, the literature findings were validated through the preliminary survey. Subsequently, a quantitative research approach was adopted to pursue the research aim. Questionnaire responses were obtained from 215 construction professionals in civil engineering projects who were selected using the judgemental and snowball sampling techniques. Collected data were analysed through Statistical Package for the Social Sciences (SPSS) V26 and Microsoft Excel 2016.

Findings

Moreover, the study revealed that material price fluctuation, shortage of material in the market, delay in material procurement, inadequate planning and delays in material delivery are the most frequent causes of ineffective material management in civil engineering projects. In addition, it was evidenced that most ineffective material management practices cause both time and cost overruns in civil engineering construction projects. Most respondents emphasized inadequate planning, inadequate qualified and experienced staff, lack of supervision and lack of leadership as the causes for both time and cost overruns.

Originality/value

The study was concluded by proposing strategies for effective material management. Education/training/enlightenment of staff in charge of materials management, use of software like Microsoft Project, Primavera and similar software to eliminate manual errors in material management, and providing clear specifications to suppliers were the most agreed strategies for effective material management in civil engineering construction projects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 2 January 2023

Ismail Abdi Changalima, Ismail Juma Ismail and Alban Dismas Mchopa

This study aims to examine the role of supplier selection and supplier monitoring in public procurement efficiency in terms of cost reduction in Tanzania.

2251

Abstract

Purpose

This study aims to examine the role of supplier selection and supplier monitoring in public procurement efficiency in terms of cost reduction in Tanzania.

Design/methodology/approach

A structured questionnaire was used to collect cross-sectional survey data from 179 public procuring entities in Tanzania. Structural equation modelling (SEM) was used to analyse the collected data.

Findings

The findings revealed that supplier selection and supplier monitoring are positive and significant predictors of public procurement efficiency in terms of cost reduction.

Research limitations/implications

This study was conducted in Tanzanian public procurement contexts, so generalisations should be made with caution. Also, this study collected cross-sectional data; other studies may consider longitudinal data.

Practical implications

This study provides procurement practitioners with insights into selecting the proper suppliers and embracing supplier monitoring to achieve procurement efficiency in terms of cost reduction.

Originality/value

This study examines the effects of supplier selection and supplier monitoring on procurement cost reduction as a measure of public procurement efficiency in the Tanzanian context. Consequently, it provides empirical evidence of supplier management practices in the public procurement context.

Details

Vilakshan - XIMB Journal of Management, vol. 21 no. 1
Type: Research Article
ISSN: 0973-1954

Keywords

Article
Publication date: 15 April 2024

Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, J. Jorge Ochoa and Aparna Samaraweera

Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities…

Abstract

Purpose

Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities around its supply chain. Hence, the purpose of this study is twofold: to identify the OC project delivery models, the limitations in their procurement approach to facilitate the resilience of the supply chain and interventions to promote supply chain resilience (SCR) and to identify the gaps in the existing procurement process and propose further research areas that implement strategies to improve SCR.

Design/methodology/approach

The study was conducted as a systematic literature review. In total, 41 peer-reviewed research papers published between 2013 and 2023 were shortlisted through the preferred reporting items for systematic reviews and meta-analysis guidelines. A descriptive analysis was conducted, followed by a thematic analysis.

Findings

The descriptive analysis reveals that the emphasis on digitising OC has shifted to transforming the business model, procurement and supply chain with a human-centric view. In thematic analysis, the predictability of the SC partners and the probabilities of evaluating the prospects are revealed as arbitrary characteristics in the current procurement strategies. Rewarding collaborative relationships among SC partners and incorporating provisions to postpone the module delivery are some interventions to promote flexibility. Drafting comprehensive and effective contracts that address transparency issues and facilitating the need for continuous development of capabilities through procurement are among the further research avenues proposed.

Originality/value

This study is a precursor demonstrating the potential of the procurement process to implement the decrees of SCR for better goal congruence of the OC supply chain.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 12 January 2023

Guoli Wang and Chenxin Ma

Motivated by the wide application of procurement strategies in retailing, this paper aims to examine the effect of procurement strategies on decisions and profits and strategic…

Abstract

Purpose

Motivated by the wide application of procurement strategies in retailing, this paper aims to examine the effect of procurement strategies on decisions and profits and strategic inventory (SI) is considered.

Design/methodology/approach

The game-theoretic models are developed under a two-period fresh product supply chain (FSC), and consist of the mode of purchasing products only in the first period without SI (Scenario S), the mode of purchasing products in every period without SI (Scenario T) and the mode of purchasing products in every period with SI (Scenario TS).

Findings

Conducting the calculating and comparing, some major findings can be concluded. In general, two-period purchasing strategies (Scenarios T and TS) promote a higher freshness-keeping effort than the single buying strategy (Scenario S). Regarding the pricing strategy, SI and Scenario S can both contribute to obtaining a lower wholesale price, the retailer's pricing is relatively complicated and hinges on the consumer's sensitivity to freshness-keeping effort and the holding cost. Besides, comparing the sales quantity and the profit, the authors find that Scenario TS stimulates more demands and brings more profits for the manufacturer. However, Scenario TS is not the optimal selection for the reason that SI sometimes hurts the retailer and even the whole supply chain. Whereas, when the holding cost is in a certain range, Scenario TS will lead to a win-win situation.

Originality/value

The main findings of this study can give the enterprises some advice on the procurement strategies of fresh products and the decisions of pricing and the freshness-keeping effort.

Details

Kybernetes, vol. 53 no. 4
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 19 March 2024

John Maleyeff and Jingran Xu

The article addresses the optimization of safety stock service levels for parts in a repair kit. The work was undertaken to assist a public transit entity that stores thousands of…

Abstract

Purpose

The article addresses the optimization of safety stock service levels for parts in a repair kit. The work was undertaken to assist a public transit entity that stores thousands of parts used to repair equipment acquired over many decades. Demand is intermittent, procurement lead times are long, and the total inventory investment is significant.

Design/methodology/approach

Demand exists for repair kits, and a repair cannot start until all required parts are available. The cost model includes holding cost to carry the part being modeled as well as shortage cost that consists of the holding cost to carry all other repair kit parts for the duration of the part’s lead time. The model combines deterministic and stochastic approaches by assuming a fixed ordering cycle with Poisson demand.

Findings

The results show that optimal service levels vary as a function of repair demand rate, part lead time, and cost of the part as a percentage of the total part cost for the repair kit. Optimal service levels are higher for inexpensive parts and lower for expensive parts, although the precise levels are impacted by repair demand and part lead time.

Social implications

The proposed model can impact society by improving the operational performance and efficiency of public transit systems, by ensuring that home repair technicians will be prepared for repair tasks, and by reducing the environmental impact of electronic waste consistent with the right-to-repair movement.

Originality/value

The optimization model is unique because (1) it quantifies shortage cost as the cost of unnecessary holding other parts in the repair kit during the shortage time, and (2) it determines a unique service level for each part in a repair kit bases on its lead time, its unit cost, and the total cost of all parts in the repair kit. Results will be counter-intuitive for many inventory managers who would assume that more critical parts should have higher service levels.

Details

Journal of Quality in Maintenance Engineering, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 28 June 2023

Nur Faiza Ishak and Vinesh Thiruchelvam

The purpose of this study is to discuss policy review in the interest of sustainable innovations in Malaysia’s public procurement. This study also offers the overall relationship…

1926

Abstract

Purpose

The purpose of this study is to discuss policy review in the interest of sustainable innovations in Malaysia’s public procurement. This study also offers the overall relationship between existing policies related to sustainable innovations in public procurement and the coherences towards the four dimensions of sustainable innovations.

Design/methodology/approach

This study outlines the current policies in Malaysia which are related to sustainable innovation initiatives and explores the cohesiveness that appears disconnected and understood separately. Policy content analysis is conducted on the current policies related to sustainable innovations in the context of Malaysia’s public procurement.

Findings

This study observed that the current policies related to sustainable innovations in public procurement are actually interconnected with each other through a hierarchical framework. This study also demonstrates that the 12th Malaysia Plan has comprehensively encompassed every aspect of the environment, social, economic and innovation to contribute to one primary goal – green economic growth.

Research limitations/implications

The proposed policy framework is expected to be beneficial for the administrator executive among the civil servant to connect the independent policies and, at the same time, contribute to the overall goal of green economic growth. Through a broad policy structure too, this study helps the industry player to recognize their potential in any area related to sustainable innovation.

Originality/value

The policy framework illustrated is new to the literature, especially in Malaysia’s context. The compilation of current policy grounded by the 12th Malaysia Plan has not been presented in any publications.

Article
Publication date: 2 April 2024

Nikhitha Adepu, Sharareh Kermanshachi, Apurva Pamidimukkala and Emily Nwakpuda

The building sector is vital to a nation’s economy, as it has a major influence on economic activity and growth, job creations and the advancement of infrastructure. Intricate…

Abstract

Purpose

The building sector is vital to a nation’s economy, as it has a major influence on economic activity and growth, job creations and the advancement of infrastructure. Intricate challenges that are inherent in crises such as the COVID-19 outbreak lead to material scarcities, project delays, labor shortages, escalated expenses, funding challenges, regulatory obstacles and dwindling investment funds, all of which culminate in costs that are in excess of those budgeted. While numerous studies have explored the ramifications of COVID-19 on project budgets, there is little, if any, data available on forecasting the magnitude of this impact.

Design/methodology/approach

This investigation seeks to bridge this knowledge deficiency by devising a predictive tool grounded in an ordinal logistic regression method. An online survey was designed and disseminated to gauge the views of construction field experts about the diverse contributors to excessive costs during the viral outbreak, and a predictive tool, crafted from the survey participants’ feedback.

Findings

Findings showed that smaller-scale enterprises and contractor-centric establishments faced greater adversities than medium-to-large ones and consultancy-or-owner-type entities.

Originality/value

The insights from this research shed light on the amplified risk of higher project costs amid health crises or analogous events, underlining the imperative need for fortified risk management approaches to bolster project outcomes. By factoring in demographics, this research offers policymakers a refined lens through which to customize interventions and promote balanced and enduring advancement in the construction industry.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 15 December 2022

Cong Wang, Henry Liu, Michael C.P. Sing and Jin Wu

Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction…

Abstract

Purpose

Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction. However, Private Public Partnerships (PPPs) have been subjected to a long pre-construction, thereby leading to an inefficient development process. Therefore, the purpose of this paper is to pay attention to the influencing factors elongating the pre-construction duration.

Design/methodology/approach

Based on data of 5,677 PPP projects between 2009 and 2021 in China, the authors adopt the Accelerated Failure Time (AFT) model in duration analysis to empirically analyze the following underlying dynamics determining the duration of PPP pre-construction stages: (1) policy uncertainty; (2) corruption; and (3) procurement method selection. To observe the influencing paths more specifically, the authors divided the pre-construction duration into the pre-tendering period and tendering period and regressed them separately.

Findings

The results indicate that the pre-construction duration is significantly prolonged with increased policy uncertainty and corruption degree as well as the use of tendering methods. Meanwhile, the above factors have a greater impact on the pre-tendering period than the tendering period.

Originality/value

The contribution of this study is twofold: (1) theoretically, this paper provides new evidence on the impact of PPP policy uncertainty, corruption and procurement method selection on the pre-construction duration. It complements empirical studies on the factors elongating the time efficiency of PPPs projects. (2) In practice, it provides a specific path for the government to improve the time efficiency of PPPs.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 April 2024

Richard Kadan, Temitope Seun Omotayo, Prince Boateng, Gabriel Nani and Mark Wilson

This study aimed to address a gap in subcontractor management by focusing on previously unexplored complexities surrounding subcontractor management in developing countries. While…

Abstract

Purpose

This study aimed to address a gap in subcontractor management by focusing on previously unexplored complexities surrounding subcontractor management in developing countries. While past studies concentrated on selection and relationships, this study delved into how effective subcontractor management impacts project success.

Design/methodology/approach

This study used the Bayesian Network analysis approach, through a meticulously developed questionnaire survey refined through a piloting stage involving experienced industry professionals. The survey was ultimately distributed among participants based in Accra, Ghana, resulting in a response rate of approximately 63%.

Findings

The research identified diverse components contributing to subcontractor disruptions, highlighted the necessity of a clear regulatory framework, emphasized the impact of financial and leadership assessments on performance, and underscored the crucial role of main contractors in Integrated Project and Labour Cost Management with Subcontractor Oversight and Coordination.

Originality/value

Previous studies have not considered the challenges subcontractors face in projects. This investigation bridges this gap from multiple perspectives, using Bayesian network analysis to enhance subcontractor management, thereby contributing to the successful completion of construction projects.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

1 – 10 of 341