1 – 10 of over 3000Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu, David J. Edwards and Eric Asamoah
Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide…
Abstract
Purpose
Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide decision-making on risk allocation in PPP power projects in Ghana.
Design/methodology/approach
A total of 67 risk factors and 9 risk allocation criteria were established from literature and ranked in a two-round Delphi survey using questionnaires. The fuzzy synthetic evaluation method was used in developing the risk allocation model.
Findings
The model’s output variable is the risk allocation proportions between the public body and private body based on their capability to manage the risk factors. Out of the 37 critical risk factors, the public sector was allocated 12 risk factors with proportions = 50%, while the private sector was allocated 25 risk factors with proportions = 50%.
Originality/value
To the best of the authors’ knowledge, this research presents the first attempt in Ghana at endeavouring to develop a QRAM for PPP power projects. There is confidence in the model to efficiently allocate risks emanating from PPP power projects.
Details
Keywords
Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and David John Edwards
In comparison to other countries, power generation in Sub-Saharan Africa is poor. The demand for power has surged in recent times and continues to increase at a fast rate. The…
Abstract
Purpose
In comparison to other countries, power generation in Sub-Saharan Africa is poor. The demand for power has surged in recent times and continues to increase at a fast rate. The public–private partnership (PPP) model has been identified as an option to address the challenges in the power sector. The purpose of this research paper is to critically explore the reasons for entering into PPP power projects in Ghana by the public and private parties.
Design/methodology/approach
Questionnaires were used to elicit responses from respondents using a two-round Delphi survey. From 60 respondents contacted in round one, 48 responses were obtained, and these 48 respondents further took part in round two. Mean score ranking was used to rank the reasons for entering into PPP power projects, while analysis of variance (ANOVA) was run to test significant difference in perceptions among the respondents.
Findings
From round 2 of the Delphi survey, the significant reasons for public sector entering into PPP power projects were as follows: achieving improved value for money, access to additional capital, increased certainty of projects and greater efficiency of project delivery services. For private sector, most significant reasons were as follows: obtaining of investment support, improvement in private sector’s international image and synergy with public sector. From ANOVA analysis, there were significant different perceptions among some of factors on the respondent profile variables and the reasons for entering into PPP power projects, while other factors did not have significant different perception.
Originality/value
Significant reasons for both public and private sectors identified would be incorporated by the government when PPP policy guidelines and laws are reviewed. This will aid in the effective implementation of PPP for power projects.
Details
Keywords
Limin Su, YongChao Cao, Huimin Li and Chengyi Zhang
The optimal payment in the whole operation and maintenance period of water environment treatment PPP projects has become the main approach to realize sustainable development of…
Abstract
Purpose
The optimal payment in the whole operation and maintenance period of water environment treatment PPP projects has become the main approach to realize sustainable development of projects. This study is aimed at constructing an effective payment model for the whole life period of projects to achieve win-win among all stakeholders, so as to provide a theoretical reference and managerial implications for the public sector in the whole operation and maintenance period.
Design/methodology/approach
In the whole operation and maintenance period of water environment treatment PPP projects, this article investigates how the public sector optimizes the payment in the whole operation and maintenance period of projects. Firstly, the projects' whole operation and maintenance period is divided into several stages according to the performance appraisal period. And then, the multi-stage dynamic programming model is constructed to design the payment construct model for the public sector in each performance appraisal stage. The payment from the public sector is the decision variable, and the deduction from the private sector is a random variable.
Findings
The optimal payment model showed that the relatively less objective weight of public sector leaded to its relatively more total payment and vice versa. Therefore, the sustainable development of the projects can only be ensured when the objective weights both of them should be balanced. Additionally, the deduction from the performance appraisal of private sector plays an important role in the model construction. The larger deduction the private sector undertakes, the smaller profits private sector has. Since the deduction at each stage is a random variable, the deduction varies with the different probability distributions obeyed by the practical deduction in each stage.
Research limitations/implications
The findings from this study have provided theoretical and application references, and some managerial implications are also given. First, the improvement of the pricing system of public sector should be accelerated. Second, the reasonable profit of the private sector must be guaranteed. While pursuing the maximization of social benefits, the public sector should make full use of the price sharing mechanism in the market and supervise the real income situation of the private sector. Third is increasing the public to participate in pricing. Additionally, it is a limitation that the deduction is assumed to conform to a uniform distribution in this study. Other probability distributions on deduction can be essentially further sought, so as to be more line with the actual situation of the projects.
Originality/value
The optimal payment in whole operation and maintenance period of the projects has become an important issue, which is a key to project success. This study constructs a multi-stage dynamic programming model to optimize payment in the whole period of projects. Additionally, this study adds its value through deeply developing the new theories of optimal payment to more suitable for the practical problems, so that to optimize the design of payment mechanism. Meanwhile, a valuable reference for public and private sectors is provided to ensure the sustainable development of the projects.
Details
Keywords
Huimin Li, Chenchen Xu, Yongchao Cao and Chengyi Zhang
The purpose of this paper is twofold: first, it explores the influencing factors of the government’s trust decision-making in the private sector; second, it explores how these…
Abstract
Purpose
The purpose of this paper is twofold: first, it explores the influencing factors of the government’s trust decision-making in the private sector; second, it explores how these influencing factors affect the government’s trust decisions.
Design/methodology/approach
A theoretical model was established, and a questionnaire survey was conducted among 152 professionals. The collected datas were analyzed by the structural equation modeling (SEM) method.
Findings
The study identified four critical factors that influence the government’s decision to trust the private sector in public-private-partnership (PPP) projects. All the four factors have a positively correlated impact on the government’s trust decision-making. The structural equation path analysis shows that the most important factor affecting the government’s trust decision-making is the trustee’s (private sector) trustworthy characteristics, and the path coefficient is 0.92. The path coefficients of risk perception and the trustor’s trust tendency are 0.83 and 0.74, respectively. The influence of the legal system environment on government trust decision-making is moderate, with a path coefficient of 0.68.
Originality/value
This paper contributes to the literature in two aspects. First, the factors influencing decision-making to government trust in the private sector in PPP projects have been identified. Second, a comprehensive view of the mechanism of government trust in the private sector in PPP projects has been theorized by the SEM method.
Details
Keywords
Huimin Li, Boxin Dai, Yongchao Cao, Limin Su and Feng Li
Trust is the glue that holds cooperative relationships together and often exists in an asymmetric manner. The purpose of this study is to explore how to mitigate the issue of…
Abstract
Purpose
Trust is the glue that holds cooperative relationships together and often exists in an asymmetric manner. The purpose of this study is to explore how to mitigate the issue of losses or increased transaction costs caused by opportunistic behavior in a soft environment where trust asymmetry is quite common and difficult to avoid.
Design/methodology/approach
This study focuses on examining asymmetric trust between the government and the private sector in public-private partnership (PPP) projects. Drawing upon both project realities and relevant literature, the primary conditional variables influencing asymmetric trust are identified. These variables encompass power perception asymmetry, information asymmetry, interaction behavior, risk perception differences and government-side control. Subsequently, through the use of a survey questionnaire, binary-matched data from both the government and the private sector are collected. The study employs fuzzy-set qualitative comparative analysis (fsQCA) to conduct a configurational analysis, aiming to investigate the causal pathways that trigger asymmetric trust.
Findings
No single conditional variable is a necessary condition for the emergence of trust asymmetry. The pathways leading to a high degree of trust asymmetry can be categorized into two types: those dominated by power perception and those involving a combination of multiple factors. Differences in power perception play a crucial role in the occurrence of high trust asymmetry, yet the influence of other conditional variables in triggering trust asymmetry should not be overlooked.
Originality/value
The findings can contribute to advancing the study of trust relationships in the field of Chinese PPP projects. Furthermore, they hold practical value in facilitating the enhancement of trust relationships between the government and the private sector.
Details
Keywords
Municipalities have the potential to become models of the circular economy (CE). This paper aims to examine the impact of the municipal council’s characteristics on municipal CE…
Abstract
Purpose
Municipalities have the potential to become models of the circular economy (CE). This paper aims to examine the impact of the municipal council’s characteristics on municipal CE disclosure and promotion.
Design/methodology/approach
This paper is based on the resource dependence and upper echelons theories. For a sample of the 100 largest cities in Canada, a mixed methodology is used to code and analyze data and test the hypotheses.
Findings
Municipal councillors’ education and experience related to the environment or sustainability are both likely to affect CE disclosure, and their sector membership (public or private) moderates the relationship between CE disclosure and councillors’ experience. This experience may be reinforced by membership in the private sector, which has applied CE principles more extensively than the public sector has. Municipal councils with a greater number of councillors from the private sector appear to perform better in matters of transparency and to disclose more CE information on their public websites.
Practical implications
Municipalities could use the findings to foster their transition to CE by implementing a CE-related training plan for their councillors. A CE-dedicated section on their websites could improve transparency and inform and educate residents about CE.
Social implications
The public sector could learn from the private sector’s best practices regarding CE.
Originality/value
This paper contributes to the literature by providing empirical evidence of the transparency and engagement of municipalities toward CE. The authors extend the resource dependence and upper echelons theories to a new context, that of public organizations.
Details
Keywords
Kavita Kanyan and Shveta Singh
This study aims to examine the impact and contribution of priority and non-priority sectors, as well as their sub-sectors, on the gross non-performing assets of public, private…
Abstract
Purpose
This study aims to examine the impact and contribution of priority and non-priority sectors, as well as their sub-sectors, on the gross non-performing assets of public, private and foreign sector banks.
Design/methodology/approach
The Reserve Bank of India's database on the Indian economy is used to retrieve data over 13 years (2008–2021). Public sector (12), private sector (22) and foreign sector (44) banks are represented in the sample. Two-way ANOVA, multiple regression and panel regression statistical techniques are used in SPSS and EViews to examine the data. Further, the results are also validated by using robustness testing by applying the fully modified ordinary least square (FMOLS) and dynamic least square (DOLS) regression.
Findings
The results showed that, for private and foreign banks, the non-priority sector makes up the majority of the total gross non-performing assets, although both the priority and non-priority sectors are substantial for public sector banks. The largest contributors to the total gross non-performing assets in public, private and foreign banks are industries, agriculture and micro and small businesses. The FMOLS displays robustness results that are qualitatively similar to the baseline result.
Practical implications
Based on the study's findings about the patterns of non-performing assets originating from these specific industries, banks might improve the way in which these advanced loans are managed.
Originality/value
There has not been much research done on the subject of sub-sector-specific non-performing assets and how they affect total gross non-performing assets across the three sector banks. The study's primary focus will be on the issue of non-performing assets in the priority’s and non-priority’s sub-sectors, namely, agricultural, micro and small businesses, food credit, industries, services, retail loans and other priority and non-priority sectors.
Details
Keywords
Rajwinder Kaur, Sameer Pingle and Anand Kumar Jaiswal
This research aims to investigate the relationship between employer branding and its antecedent organisational culture within the context of the private banking sector. The study…
Abstract
Purpose
This research aims to investigate the relationship between employer branding and its antecedent organisational culture within the context of the private banking sector. The study also investigates the relationship between employer branding and employee brand equity as a consequential construct. Additionally, the mediating role of trust and the moderating role of gender in the relationship between employer branding and employee brand equity has been examined.
Design/methodology/approach
The present study’s findings result from data analysis collected from a sample of 454 employees working in private banks in India. The data analysis was conducted utilising the structural equation modelling technique with the assistance of analysis of moment structures (AMOS) software.
Findings
The study’s findings indicate that supportive and bureaucratic (formal) culture in private banks exhibit a significant relationship with employer branding. However, the relationship between innovative culture and employer branding was found to be insignificant. The research also reveals a significant positive association between employer branding and employee brand equity variables: brand consistent behaviour, brand endorsement and brand allegiance. Further, the study highlights the mediating role of employee trust in management in the relationship between employer branding and employee brand equity. Examining demographic variables suggests that gender moderates the relationship between employer branding and employee brand equity.
Originality/value
The originality of this study lies in its exploration of the critical role of organisational culture variables in shaping employer branding within the context of private banks. The findings highlight that cultivating supportive and bureaucratic cultures can effectively enhance the employer branding of private banks. The study emphasises the outcomes of employer branding initiatives, signifying that they contribute to developing brand equity among employees. This leads to long-term employee commitment and advocacy towards the organisation, as employees become brand advocates for the bank with which they are affiliated. The study contributes to a better understanding of the relationship between organisational culture, employer branding and employee brand equity, providing valuable implications for the private banking sector aiming to reinforce their employer brand and increase employee engagement.
Details
Keywords
The study aims to evaluate the financial distress position of selected sample banks in India. The top 10 banks with the highest levels of gross non-performing assets (NPA) under…
Abstract
The study aims to evaluate the financial distress position of selected sample banks in India. The top 10 banks with the highest levels of gross non-performing assets (NPA) under both public and private sector ownerships have been chosen for the study. Application of the Altman Z-score model has been used to compare both ownership banks’ financial distress for five years from 2017 to 2021. Based on the study’s findings, it was found that private sector banks demonstrated better financial stability than their public sector counterparts. Specifically, the average Z-score of the selected sample banks was higher than the safe zone threshold of 2.9 during the study period.
Details
Keywords
Jianbo Zhu, Qianqian Shi, Ce Zhang, Jingfeng Yuan, Qiming Li and Xiangyu Wang
Promoting low-carbon in the construction industry is important for achieving the overall low-carbon goals. Public–private partnership is very popular in public infrastructure…
Abstract
Purpose
Promoting low-carbon in the construction industry is important for achieving the overall low-carbon goals. Public–private partnership is very popular in public infrastructure projects. However, different perceptions of low-carbon and behaviors of public and private sectors can hinder the realization of low-carbon in these projects. In order to analyze the willingness of each stakeholder to cooperate towards low-carbon goals, an evolutionary game model is constructed.
Design/methodology/approach
An evolutionary game model that considers the opportunistic behavior of the participants is developed. The evolutionary stable strategies (ESSs) under different scenarios are examined, and the factors that influence the willingness to cooperate between the government and private investors are investigated.
Findings
The results illustrate that a well-designed system of profit distribution and subsidies can enhance collaboration. Excessive subsidies have negative impact on cooperation between the two sides, because these two sides can weaken income distribution and lead to the free-riding behavior of the government. Under the situation of two ESSs, there is also an optimal revenue distribution coefficient that maximizes the probability of cooperation. With the introduction of supervision and punishment mechanism, the opportunistic behavior of private investors is effectively constrained.
Originality/value
An evolutionary game model is developed to explore the cooperation between the public sector and the private sector in the field of low-carbon construction. Based on the analysis of the model, this paper summarizes the conditions and strategies that can enable the two sectors to cooperate.
Details