Article
Publication date: 30 March 2021

Alireza Ahmadian Fard Fini, Mojtaba Maghrebi, Perry John Forsythe and Travis Steven Waller

Measuring onsite productivity has been a substance of debate in the construction industry, mainly due to concerns about accuracy, repeatability and unbiasedness. Such…

Abstract

Purpose

Measuring onsite productivity has been a substance of debate in the construction industry, mainly due to concerns about accuracy, repeatability and unbiasedness. Such characteristics are central to demonstrate construction speed that can be achieved through adopting new prefabricated systems. Existing productivity measurement methods, however, cannot cost-effectively provide solid and replicable evidence of prefabrication benefits. This research proposes a low-cost automated method for measuring onsite installation productivity of prefabricated systems.

Design/methodology/approach

Firstly, the captured ultra-wide footages are undistorted by extracting the curvature contours and performing a developed meta-heuristic algorithm to straighten these contours. Then a preprocessing algorithm is developed that could automatically detect and remove the noises caused by vibrations and movements. Because this study aims to accurately measure the productivity the noise free images are double checked in a specific time window to make sure that even a tiny error, which have not been detected in the previous steps, will not been amplified through the process. In the next step, the existing side view provided by the camera is converted to a top view by using a spatial transformation method. Finally, the processed images are compared with the site drawings in order to detect the construction process over time and report the measured productivity.

Findings

The developed algorithms perform nearly real-time productivity computations through exact matching of actual installation process and digital design layout. The accuracy and noninterpretive use of the proposed method is demonstrated in construction of a multistorey cross-laminated timber building.

Originality/value

This study uses footages of an already installed surveillance camera where the camera's features are unknown and then image processing algorithms are deployed to retrieve accurate installation quantities and cycle times. The algorithms are almost generalized and versatile to be adjusted to measure installation productivity of other prefabricated building systems.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 February 1987

Richard Catt

The oldest parts of downtown Manhattan were built by the new immigrants who settled into separate districts to retain their language and customs safely.

Abstract

The oldest parts of downtown Manhattan were built by the new immigrants who settled into separate districts to retain their language and customs safely.

Details

Structural Survey, vol. 5 no. 2
Type: Research Article
ISSN: 0263-080X

Article
Publication date: 3 April 2007

Vivian W.Y. Tam, C.M. Tam and William C.Y. Ng

The use of prefabrication has been considered as one of the most effective waste minimization methods in the construction context; however, the industry has found difficulties to…

5774

Abstract

Purpose

The use of prefabrication has been considered as one of the most effective waste minimization methods in the construction context; however, the industry has found difficulties to implement it. Contractors lack experience in using prefabrication and they do not know how to implement prefabrication to their projects effectively. The purpose of this paper is to present the findings of a study on the implementation of prefabrication in the context of different project types and procurement approaches.

Design/methodology/approach

This paper examines possible project types and procurement methods to maximally gain benefits of using prefabricated building components. A questionnaire survey and structured interviews have been conducted.

Findings

From the results, it should be noted that residential projects and design and build procurement methods are the most effective project types and procurement methods, respectively, in using prefabrication. In the interview discussion, one of the governmental employees highlighted that about 65 percent of projects are residential projects. The high supply of residential housing suits fast population growth in Hong Kong. The interviewee also explained that shortening construction period is one of the main goals in their projects. Furthermore, an interviewed main contractor highlighted that the involvement of contractors at the early design stage in a project can bring advantages in considering construction methods before project commencement on site and to improve project constructability. An interviewed subcontractor also explained that the involvement of construction organizations in the design stage can effectively improve the use of prefabrication in major activities including concreting, plastering and formworking, rather than wet‐trade construction activities. Therefore, the use of standardized designs and prefabricated building components are highly encouraged.

Originality/value

This brings early considerations and suggestions to project parties to improve prefabrication implementation. The effects of prefabrication implementation are also considered.

Details

Journal of Engineering, Design and Technology, vol. 5 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 13 April 2012

Thomas Linner and Thomas Bock

The Japanese prefabrication industry not only has automated its processes to a high extent, but it also innovates due to the fact that it delivers buildings of outstanding quality…

3895

Abstract

Purpose

The Japanese prefabrication industry not only has automated its processes to a high extent, but it also innovates due to the fact that it delivers buildings of outstanding quality accompanied by a multitude of services. In order to explore and specify the concepts and parameters that have driven this industry, Japan's prefabrication industry, its cultural, economic and technological surrounding, as well as the applied processes, technologies and economic strategies, have to be illustrated and analysed. The purpose of this paper is to identify, describe and analyse these concepts and their related parameters, as well as to recognise the most influential drivers for the future that provide an indication into which direction the industry could evolve.

Design/methodology/approach

Being aware that literature does not provide relevant information and data, which would allow the authors to explore concepts and parameters explaining the success of the Japanese prefabrication industry, the authors performed field surveys, visited factories, R&D centres and sales points of all major Japanese prefabrication companies. In some cases the authors also interviewed general managers, researchers and developers, and academicians at Japanese universities. Based on an extensive literature review in the area of product development, production technology, modularisation, mass customisation, and innovation, the authors qualitatively and quantitatively analysed all major prefabrication companies according to a fixed scheme.

Findings

The concepts and parameters identified and analysed in this paper demonstrate that the Japanese prefabrication industry, which is leading in large‐scale industrialization, nowadays focuses towards services that are related to the building's utilisation phase, rather than delivering products. By involving customers it enhances the companies' customer relations, thus creating competitive advantages.

Originality/value

Overall the paper identifies that Japanese prefabrication industry acts rather like a “production industry” than a “construction industry”. Similar to many other high‐tech industries, Japan's prefabrication industry incorporates the latest product and process technologies and combines automation, products and services into complex value‐capturing systems.

Open Access
Article
Publication date: 17 May 2022

Chongyi Chang, Yuanwu Cai, Bo Chen, Qiuze Li and Pengfei Lin

In service, the periodic clashes of wheel flat against the rail result in large wheel/rail impact force and high-frequency vibration, leading to severe damage on the wheelset…

Abstract

Purpose

In service, the periodic clashes of wheel flat against the rail result in large wheel/rail impact force and high-frequency vibration, leading to severe damage on the wheelset, rail and track structure. This study aims to analyze characteristics and dynamic impact law of wheel and rail caused by wheel flat of high-speed trains.

Design/methodology/approach

A full-scale high-speed wheel/rail interface test rig was used for the test of the dynamic impact of wheel/rail caused by wheel flat of high-speed train. With wheel flats of different lengths, widths and depths manually set around the rolling circle of the wheel tread, and wheel/rail dynamic impact tests to the flats in the speed range of 0–400 km/h on the rig were conducted.

Findings

As the speed goes up, the flat induced the maximum of the wheel/rail dynamic impact force increases rapidly before it reaches its limit at the speed of around 35 km/h. It then goes down gradually as the speed continues to grow. The impact of flat wheel on rail leads to 100–500 Hz middle-frequency vibration, and around 2,000 Hz and 6,000 Hz high-frequency vibration. In case of any wheel flat found during operation, the train speed shall be controlled according to the status of the flat and avoid the running speed of 20 km/h–80 km/h as much as possible.

Originality/value

The research can provide a new method to obtain the dynamic impact of wheel/rail caused by wheel flat by a full-scale high-speed wheel/rail interface test rig. The relations among the flat size, the running speed and the dynamic impact are hopefully of reference to the building of speed limits for HSR wheel flat of different degrees.

Details

Railway Sciences, vol. 1 no. 1
Type: Research Article
ISSN: 2755-0907

Keywords

Article
Publication date: 5 May 2023

Rakesh Sai Kumar Mandala and R. Ramesh Nayaka

This paper aims to identify modern construction techniques for affordable housing, such as prefabrication and interlocking systems, that can save time and cost while also…

Abstract

Purpose

This paper aims to identify modern construction techniques for affordable housing, such as prefabrication and interlocking systems, that can save time and cost while also providing long-term sustainable benefits that are desperately needed in today's construction industry.

Design/methodology/approach

The need for housing is growing worldwide, but traditional construction cannot cater to the demand due to insufficient time. There should be some paradigm shift in the construction industry to supply housing to society. This paper presented a state-of-the-art review of modern construction techniques practiced worldwide and their advantages in affordable housing construction by conducting a systematic literature review and applying the backward snowball technique. The paper reviews modern prefabrication techniques and interlocking systems such as modular construction, formwork systems, light gauge steel/cold form steel construction and sandwich panel construction, which have been globally well practiced. It was understood from the overview that modular construction, including modular steel construction and precast concrete construction, could reduce time and costs efficiently. Further enhancement in the quality was also noticed. Besides, it was observed that light gauge steel construction is a modern phase of steel that eases construction execution efficiently. Modern formwork systems such as Mivan (Aluminium Formwork) have been reported for their minimum construction time, which leads to faster construction than traditional formwork. However, the cost is subjected to the repetitions of the formwork. An interlocking system is an innovative approach to construction that uses bricks made of sustainable materials such as earth that conserve time and cost.

Findings

The study finds that the prefabrication techniques and interlocking system have a lot of unique attributes that can enable the modern construction sector to flourish. The study summarizes modern construction techniques that can save time and cost, enhancing the sustainability of construction practices, which is the need of the Indian construction industry in particular.

Research limitations/implications

This study is limited to identifying specific modern construction techniques for time and cost savings, lean concepts and sustainability which are being practiced worldwide.

Practical implications

Modern formwork systems such as Mivan (Aluminium Formwork) have been reported for their minimum construction time which leads to faster construction than traditional formwork.

Social implications

The need for housing is growing rapidly all over the world, but traditional construction cannot cater to the need due to insufficient time. There should be some paradigm shift in the construction industry to supply housing to society.

Originality/value

This study is unique in identifying specific modern construction techniques for time and cost savings, lean concepts and sustainability which are being practiced worldwide.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 12 February 2021

Tong Lin, Sainan Lyu, Rebecca Jing Yang and Linda Tivendale

Prefabricated housing has become a boom industry across the world; however, the uptake of offsite construction (OSC) approaches in Australian low-rise buildings is rather low…

1367

Abstract

Purpose

Prefabricated housing has become a boom industry across the world; however, the uptake of offsite construction (OSC) approaches in Australian low-rise buildings is rather low compared with high-rise buildings in other countries. This study aims to investigate and analyse the adoption of different levels of OSC approaches and the selection of different procurement options in Australian low-rise residential buildings.

Design/methodology/approach

The research objectives were pursued through a mixed research method. An empirical questionnaire survey was carried out with 35 professionals in the Australian building and construction industry. Semi-structured interviews were conducted with 20 interviewees and analysed using thematic analysis method in NVivo software.

Findings

The research results found that the most suitable OSC level for Australian low-rise buildings is components-based prefabrication and identified the barriers to OSC uptake for each OSC level. The study also showed that the best option of procuring prefabricated products is from Australian manufacturers, followed by Australian suppliers/dealers and overseas manufacturers. Panelised prefabrication and components-based prefabrication are ranked as the most suitable OSC approaches for Australian manufacturers. Modular prefabrication is regarded as the most suitable for overseas manufacturer, while components-based prefabrication is the most suitable for Australian suppliers/dealers.

Originality/value

The selection of various OSC approaches and different procurement options in the low-rise residential buildings are scarcely explored topic, and thus, this study provides knowledge of interest for both researchers and practitioners.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 December 1997

Brian Rooks

Examines the challenges facing the shipbuilding industry today and details the solution offered by a consortium of three German companies. It is based on the prefabrication of…

3043

Abstract

Examines the challenges facing the shipbuilding industry today and details the solution offered by a consortium of three German companies. It is based on the prefabrication of sub‐assemblies on production lines in which automation is critical to the economics. Describes welding robots playing a key role in this approach and the robot systems supplied to one German shipbuilder. Also important to cost effectiveness is a new high speed welding process that uses two wires in the weld torch, enabling productivity to be at least doubled. Another necessity is an off‐line programming and simulation system, specifically developed for the shipbuilding industry, that is typified by one‐off and low volume manufacture.

Details

Industrial Robot: An International Journal, vol. 24 no. 6
Type: Research Article
ISSN: 0143-991X

Keywords

Open Access
Article
Publication date: 12 March 2019

Mounir Bensalah, Abdelmajid Elouadi and Hassan Mharzi

The authors will give an overview of the railway market, with a focus on Morocco, before seeing the challenges to face, before listing some benefits of rail links in terms of…

9080

Abstract

Purpose

The authors will give an overview of the railway market, with a focus on Morocco, before seeing the challenges to face, before listing some benefits of rail links in terms of development, ecology, security, space management, etc. The authors will then give an overview of the development of BIM, its benefits, risks and issues. The purpose of this paper is to verify that the BIM can provide the railway with the tools to face some of its challenges and improve its productivity.

Design/methodology/approach

This paper is part of our research project on the integration of BIM in railway, which is the result of a partnership between Colas Rail Maroc and the ENSAK of the Ibn Tofail University of Kenitra. The objective of this paper is mainly to confirm that the integration of BIM with the railway, through a theoretical and practical study, can have positive impacts. To do this, our methodology consists in studying briefly the development of the railway, the need to improve the budgets and schedules of the projects, to increase the productivity, before showing the advantages of the BIM in the sector of the Architecture, Engineering and Construction (AEC). The study of feedback from railway projects (chosen for their date of completion – beyond 2014, their size, their geographical situation in several countries and for the availability of literature in a new field) will confirm the initial hypotheses. Among the projects studied will be a project that has been the subject of an article written by the authors of this paper. In the discussion of the results, the authors will focus on the benefits, risks and limitations of integrating BIM into the railway. In conclusion, the authors are laying the groundwork for future research in the field.

Findings

The cases study discussed in this paper and previous research confirms the hypotheses of the literature. The integration of BIM into railway projects can have several advantages: collaboration, time saving, cost optimization, prevention of conflicts between networks, construction before construction, optimization of facility management, improvement of the quality of works, prefabrication. They also allowed us to illustrate the risks (status and appropriation of the BIM model, lack of standardization of versions or software and lack of understanding of the basics of schedules and specifications) and limitations (lack of feedback, lack of adaptability and convergence of tools). These experiences have also shown that the use of BIM is not just a technological transition, but a revolution in the project management process, which requires several key success factors (participation of all, commitment, change management and adoption of the collaborative approach). Visualization, collaboration and conflict elimination are the three main chapters where the benefits of BIM can be organized. In fact, there is a lot of intersection between these chapters, but they have been chosen as the main ideas around which all the benefits can be better understood. Visualization primarily addresses the benefits to an individual and improving one’s personal understanding as a result of using BIM. The collaboration refers to the cooperative action of several team members, which is encouraged and facilitated by BIM. Conflict elimination mainly concerns project-related benefits, such as conflict reduction, waste, risks, costs and time. For railway infrastructure projects, the main purpose of using BIM is to improve the design integration process, internal project team communication and collision detection to eliminate risk of rehabilitation.

Research limitations/implications

The application of the BIM process in railway infrastructure requires constant improvement. This concerns the development of libraries and the models available to all users in order to encourage the development of this methodology and, consequently, its use of information throughout the life cycle of an infrastructure work.

Practical implications

The case study of real projects incorporating BIM confirms the results of the literature review. The benefits of integrating BIM into rail projects are multiple and proven: cost control, decision support, avoids extra work due to design errors, improves detection of interface problems, improves planning of vision, help with prefabrication and facility management, etc. Finally, the BIM process is able to overcome delays in procedures slowing the development of the construction industry in many countries, especially in Morocco, because of the slowness of design (or downright bad design).

Social implications

The integration of BIM into rail is becoming a global trend. This integration requires government decisions and a maturation of technology and tools. The authorities of some developed countries studied (Sweden, UK, France, Germany) in the railways, at different stages of implementation, are adopting BIM in the process of setting up new railway projects. This political impulse is still behind in southern countries, such as Morocco. The trend and the data collected indicate an adoption between 2020 and 2030 of BIM in all/some AEC projects in developed countries. This will have an impact on other countries that will soon be doing the same, especially in the railway sector to adopt the BIM.

Originality/value

As part of the realization of this paper, we proceeded to the implementation of an electrical substation as part of the project to build 40 electric traction substations built by Colas Rail on behalf of ONCF.

Details

Smart and Sustainable Built Environment, vol. 8 no. 2
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 14 February 2023

Rehan Masood, Krishanu Roy, Vicente A. González, James B.P. Lim and Abdur Rehman Nasir

Globally, prefabrication in housebuilding has evolved as an innovative approach to attain sustainability and affordability. However, the SC, including non-producers and producers…

Abstract

Purpose

Globally, prefabrication in housebuilding has evolved as an innovative approach to attain sustainability and affordability. However, the SC, including non-producers and producers, of prefabricated housebuilding projects is still not perceptually aligned, hindering innovation diffusion. This paper investigates the contemporary industry perspective on PHB for conceptualisation, market share and growth, innovation diffusion and the producer's role in the context of New Zealand.

Design/methodology/approach

An exploratory qualitative research design was chosen to learn the perceptual stance of the industry. A semi-structured survey was conducted, followed by interviews with selected supply chain participants, who were producers and non-producers and had relevant experience in the PHB industry.

Findings

This study reports the common terminologies used by supply chain members, with justification and explanation. Further, the perceived market share and growth of the PHB industry are obtained and compared with subsequent studies to determine the capability and capacity. The perception of the diffusion of PHB by type is reported to portray the overall trend of the industry. In the last, the role of producers as the suppliers of PHB projects is investigated to establish the stakeholder positional criticality.

Practical implications

This study can help researchers and practitioners gain insight into the PHB industry from a multi-dimensional perspective. This study is a potential first step to formalise the policy, programme, strategies and action plan for the uptake of the PHB in the New Zealand.

Originality/value

PHB diffusion in the supply chain perspective, considering multi-dimensional aspects, has not been considered in previous studies as government agencies produce most of the literature. This academic research establishes the theoretical linkage towards PHB diffusion and reports the current status.