Article
Publication date: 7 June 2022

Yue Teng, Zhongfu Li, Jin Cai and Min Ju

This study aims to focus on the sustainability of prefabricated medical emergency buildings (PMEBs) renovation after the epidemic, to address the problem that large numbers of…

Abstract

Purpose

This study aims to focus on the sustainability of prefabricated medical emergency buildings (PMEBs) renovation after the epidemic, to address the problem that large numbers of PMEBs may be abandoned for losing their original architectural functions. This study develops an evaluation system to identify and measure sustainable factors for PMEBs’ renovation schemes. Qualitative and quantitative analysis of PMEBs’ renovation scheme was conducted based on cloud model evaluation method and selected the renovation scheme in line with sustainable development. The study promotes evaluation methods and decision-making basis for the renovation design of global PMEBs and realizes the use-value of building functions again.

Design/methodology/approach

By referring to the existing literature, design standards and expert visiting a set of evaluation index systems which combines the renovation of the PMEBs and the sustainability concept has been established, which calculates the balanced optimal comprehensive weight of each indicator utilizing combination weighting method, and quantifies the qualitative language of different PMEBs’ renovation schemes by experts through characteristics of the cloud model. This paper takes Huoshenshan hospital a representative PMEB during the epidemic period as an example, to verify the feasibility of the cloud model evaluation method.

Findings

The research results of this paper are that in the PMEBs’ renovation scheme structural reformative (T11) and corresponding nature with the original building (T13) have the most important influence; the continuity of architectural cultural value (T22) and regional development coherence (T23) are the key factors affecting the social dimension; the profitability of renovated buildings (T34) is the key factor affecting the economic dimension; the environmental impact (T41), resource utilization (T42) and ecological technology (T43) are the key factors in the environmental dimension.

Originality/value

This study contributes to the existing body of knowledge by supplementing a set of scientific evaluation methods to make up for the sustainability measurement of PMEBs’ renovation scheme. The main objective was to make renovated PMEBs meet the needs of urban sustainable development, retain the original cultural value of the buildings, meanwhile enhance their social and economic value and realize the renovation with the least impact on the environment.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 March 2023

Tianxin Li, Zhongfu Li and Jin Cai

Insufficient intra-organizational diffusion of prefabricated construction (PC) technology hinders its implementation benefits. More research on intra-organizational diffusion of…

Abstract

Purpose

Insufficient intra-organizational diffusion of prefabricated construction (PC) technology hinders its implementation benefits. More research on intra-organizational diffusion of PC technology is required to improve organizational performance in PC implementation. This study aims to explore the antecedents and consequence of intra-organizational diffusion of PC technology.

Design/methodology/approach

This study established an antecedent and consequence model of intra-organizational diffusion of PC technology from the perspective of contingency theory. The model was empirically tested by 91 valid questionnaires using partial least squares-structural equation modeling (PLS-SEM).

Findings

The results indicate that organizational support (OSU), organizational climate (OC) and mechanistic organizational structure (OST) positively influence intra-organizational diffusion of PC technology, which further positively influences organizational performance. The relationship between OC and intra-organizational diffusion of PC technology is mediated by OSU. Technological turbulence negatively moderates the relationship between OSU and intra-organizational diffusion.

Originality/value

This is the first paper to study the antecedents and consequence of intra-organizational diffusion of PC technology and an expansion of contingency theory in the research field of PC technology. This study helps to theoretically stimulate future research on intra-organizational diffusion and practically promote intra-organizational diffusion of PC technology along with improving organizational performance in its implementation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 February 2022

Hui Lu, Hongwei Wang, Dihua Yu and Jian Ye

To meet the rapidly increasing demand for medical treatment during the outbreak of COVID-19, Huoshengshan and Leishenshan Hospital are rapidly built (9–12 days) in Wuhan. These…

Abstract

Purpose

To meet the rapidly increasing demand for medical treatment during the outbreak of COVID-19, Huoshengshan and Leishenshan Hospital are rapidly built (9–12 days) in Wuhan. These two urgent emergency projects are unprecedented. In general, substantial literature suggests that the possibility of shortening a schedule by more than a quarter of its original duration is implausible. By contrast, the two projects had successfully compressed the schedules from months and years to about ten days. This study aims to investigate how this was done and provide references for future projects.

Design/methodology/approach

The study uses qualitative case study techniques to analyze the project practices in two urgent emergency projects. Data were gathered through semi-structured interviews and archival research. During interviews, interviewees were asked to describe the project practices adopted to overcome the challenges and freely share their experiences and knowledge.

Findings

The results illustrate that a high degree of schedule compression is achievable through tactful crashing, substitution and overlapping applications. The successful practices heavily rely on the high capacity of participants and necessary organization, management and technology innovations, such as three-level matrix organizational structure, reverse design method, site partition, mock-up room first strategies and prefabricated construction technology. For instance, the reverse design method is one of the most significant innovations to project simplification and accelerate and worthy of promotion for future emergency projects.

Practical implications

The empirical findings are significant as they evoke new thinking and direction for addressing the main challenges of sharp schedule compression and provide valuable references for future emergency projects, including selecting high-capacity contractors and replacing the conventional design methods with reverse design.

Originality/value

Substantial studies indicate that the maximum degree of schedule compression is highly unlikely to exceed 25%, but this study suggests that sharp compression is possible. Although with flaws in its beauty (i.e. compressing schedule at the expense of construction cost and quality), it is also a breakthrough. It provides the building block for future research in this fertile and unexplored area.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 December 2022

Ying Zhou, Yu Wang, Chenshuang Li, Lieyun Ding and Cong Wang

This study aimed to propose a performance-oriented approach of automatically generative design and optimization of hospital building layouts in consideration of public health…

580

Abstract

Purpose

This study aimed to propose a performance-oriented approach of automatically generative design and optimization of hospital building layouts in consideration of public health emergency, which intended to conduct reasonable layout design of hospital building to meet different performance requirements for both high efficiency during normal periods and low risk in the pandemic.

Design/methodology/approach

The research design follows a sequential mixed methodology. First, key points and parameters of hospital building layout design (HBLD) are analyzed. Then, to meet the requirements of high efficiency and low risk, adjacent preference score and infection risk coefficient are constructed as constraints. On this basis, automatic generative design is conducted to generate building layout schemes. Finally, multi-objective deviation analysis is carried out to obtain the optimal scheme of hospital building layouts.

Findings

Automatic generative design of building layouts that integrates adjacent preferences and infection risks enables hospitals to achieve rapid transitions between normal (high efficiency) and pandemic (low risk) periods, which can effectively respond to public health emergencies. The proposed approach has been verified in an actual project, which can help systematically explore the solution for better decision-making.

Research limitations/implications

The form of building layouts is limited to rectangles, and future work can explore conducting irregular layouts into optimization for the framework of generative design.

Originality/value

The contribution of this paper is the developed approach that can quickly and effectively generate more hospital layout alternatives satisfying high operational efficiency and low infection risk by formulating space design rules, which is of great significance in response to public health emergency.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 June 2022

Zhen Li, Yutong Jin, Wenjing Li, Qingfeng Meng and Xin Hu

The impacts of COVID-19 on construction projects have attracted much attention in the construction management research community. Nevertheless, a systematic review of these…

1982

Abstract

Purpose

The impacts of COVID-19 on construction projects have attracted much attention in the construction management research community. Nevertheless, a systematic review of these studies is still lacking. The purpose of this paper is to systematically analyze the impacts of COVID-19 on the different stages of a project life-cycle, and comprehensively sort out the epidemic response measures adopted by project participants. In addition, the study also attempts to explore the challenges and opportunities faced by project management practitioners under the context of COVID-19.

Design/methodology/approach

This study comprehensively demonstrates the systematic review process of COVID-19 related research in the construction industry, systematically summarizes the research status of the impact of COVID-19 on construction projects, and defines the strategies to deal with COVID-19 in project management; and through the visualization research, determines the current key research topics and future research trends.

Findings

This study identifies 11 construction activities in the project management life cycle that are affected by COVID-19 and finds that the COVID-19 epidemic has the greatest impact on construction workers, construction standards, construction contracts and construction performance. The study further summarizes the six main epidemic countermeasures and mitigation measures taken within the construction industry following the arrival of the epidemic. In addition, the results of this study identify opportunities and future trends in intelligent construction technology, rapid manufacturing engineering and project management in the construction industry in the post-epidemic era through literature results, which also provide ideas for related research.

Practical implications

COVID-19 has brought severe challenges to society. It is of great significance for the future sustainable development of the construction industry to identify the impact of COVID-19 on all phases of the project and to promote the development of coping strategies by project stakeholders.

Originality/value

First of all, there is little study comprehensively reviewing the impacts of COVID-19 on the different stages of construction projects and the strategies to deal with the negative impacts. In addition, from a life cycle perspective, the used articles in this study were grouped into different categories based on project stages. This promotes an integrated and comprehensive understanding of historical studies. Moreover, on the basis of a comprehensive review, this paper puts forward future research directions to promote the sustainable development of the construction sector.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 November 2021

Nicoletta Setola, Eletta Naldi, Maria Vittoria Arnetoli, Luca Marzi and Roberto Bologna

The Covid-19 pandemic has placed health-care systems and their facilities throughout the world under immense pressure. The pandemic has highlighted the crucial role of health-care…

Abstract

Purpose

The Covid-19 pandemic has placed health-care systems and their facilities throughout the world under immense pressure. The pandemic has highlighted the crucial role of health-care facilities design in looking beyond the ongoing crisis and considering how hospitals can better prepare for unexpected future health situations. This study aims to investigate how hospitals reacted to the crisis in terms of their physical spaces, which architectural features permitted the necessary transformations, and how this data can inform hospital design research in the future.

Design/methodology/approach

The research adopted a qualitative and multi-method approach to case studies. Data was collected directly (field survey and interviews) and indirectly (literature, periodicals, specialised websites, webinars, conferences and forums), and a strengths, weaknesses, opportunities, threats analysis supported the data evaluation.

Findings

Hospitals’ responses to the crisis were guided by a host of variables depending on the specific intervention context and risk scenario. Some key issues emerged as particularly meaningful to drive future research in hospital design, namely, architectural typology, layout and spatial proximities, technological systems, the quality of care spaces, the role of public spaces, facility management tools to drive the transformation, territorial health care networks and new technologies.

Originality/value

The paper suggests that the current crisis can be transformed into an opportunity, in terms of research and innovation, to rethink and improve the quality and efficiency of health-care spaces, restoring their crucial role of promoting health by design.

Details

Facilities , vol. 40 no. 1/2
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 13 April 2012

Thomas Linner and Thomas Bock

The Japanese prefabrication industry not only has automated its processes to a high extent, but it also innovates due to the fact that it delivers buildings of outstanding quality…

3895

Abstract

Purpose

The Japanese prefabrication industry not only has automated its processes to a high extent, but it also innovates due to the fact that it delivers buildings of outstanding quality accompanied by a multitude of services. In order to explore and specify the concepts and parameters that have driven this industry, Japan's prefabrication industry, its cultural, economic and technological surrounding, as well as the applied processes, technologies and economic strategies, have to be illustrated and analysed. The purpose of this paper is to identify, describe and analyse these concepts and their related parameters, as well as to recognise the most influential drivers for the future that provide an indication into which direction the industry could evolve.

Design/methodology/approach

Being aware that literature does not provide relevant information and data, which would allow the authors to explore concepts and parameters explaining the success of the Japanese prefabrication industry, the authors performed field surveys, visited factories, R&D centres and sales points of all major Japanese prefabrication companies. In some cases the authors also interviewed general managers, researchers and developers, and academicians at Japanese universities. Based on an extensive literature review in the area of product development, production technology, modularisation, mass customisation, and innovation, the authors qualitatively and quantitatively analysed all major prefabrication companies according to a fixed scheme.

Findings

The concepts and parameters identified and analysed in this paper demonstrate that the Japanese prefabrication industry, which is leading in large‐scale industrialization, nowadays focuses towards services that are related to the building's utilisation phase, rather than delivering products. By involving customers it enhances the companies' customer relations, thus creating competitive advantages.

Originality/value

Overall the paper identifies that Japanese prefabrication industry acts rather like a “production industry” than a “construction industry”. Similar to many other high‐tech industries, Japan's prefabrication industry incorporates the latest product and process technologies and combines automation, products and services into complex value‐capturing systems.

Article
Publication date: 25 July 2019

Ali Asgary and Nooreddin Azimi

The purpose of this study is to examine people’s preferences for some of the key attributes of emergency shelters, including type, privacy level, location, spatial arrangement and…

Abstract

Purpose

The purpose of this study is to examine people’s preferences for some of the key attributes of emergency shelters, including type, privacy level, location, spatial arrangement and pet-friendliness.

Design/methodology/approach

Choice experiment (CE) method was used in this study. A standard CE questionnaire was designed and completed by a sample of 293 residents of the Greater Toronto Area, Ontario (Canada), during the winter of 2015.

Findings

When using publicly provided shelters, people prefer to stay in hotels, places of worship and then community shelters, in that order. These findings correspond to the values that they place for various attributes through the CE survey. Findings show that responders place the highest values for emergency shelters that provide more privacy, located close to their home, and are pet friendly. Type of shelter and the “arrangement” attributes were not found to be as important and valuable.

Research limitations/implications

This study uses a convenient sampling method as such may not fully represent the study population.

Practical implications

Emergency shelter provision by local, regional and national governments cost significant amount of money and thus it is important that the society get the maximum benefit from it. This will be possible when users’ preferences are considered in planning, design, and operation of emergency shelters. The findings enable emergency managers to perform cost-benefit analysis an increase the efficiency of emergency shelters.

Originality/value

While previous studies have examined emergency-shelter types, characteristics and user-satisfaction levels, this is a novel study because it uses a choice experiment method to extract monetary values for key emergency-shelter attributes.

Details

International Journal of Disaster Resilience in the Built Environment, vol. 10 no. 2/3
Type: Research Article
ISSN: 1759-5908

Keywords

Article
Publication date: 4 February 2022

Lin Yang, Jiaming Lou, Junuo Zhou, Xianbo Zhao and Zhou Jiang

With multiple-related organizations, worldwide infections, deep economic recession and public disorder, and large consumption amount of anti-epidemic resources, the coronavirus…

Abstract

Purpose

With multiple-related organizations, worldwide infections, deep economic recession and public disorder, and large consumption amount of anti-epidemic resources, the coronavirus disease 2019 (COVID-19) has been defined as a public health emergency of international concern (PHEIC). Nowadays, Wuhan has recovered from the pandemic disaster and reentered normalization. The purposes of this study are to (1) summarize organization collaboration patterns, successful experience and latent defects under across-stage evolution of Wuhan's cooperation governance mode against the pandemic, and on the basis, (2) reveal how the COVID-19 development trends and organizations' collaborative behaviors affected each other.

Design/methodology/approach

Detailed content analysis of online news reports covering COVID-19 prevention and control measures on the website of Wuhan Municipal Government was adopted to identify organizations and their mutual collaborative interrelationships. Four complex network (CN) models of organization collaboration representing the outbreak, preliminary control, recession and normalization stages, respectively, were established then. Time-span-based dynamic parameter analyses of the proposed networks, comprising network cohesiveness analysis and node centrality analysis, were undertaken to indicate changes of global and local characteristics in networks.

Findings

First, the definite collaborative status of Wuhan Headquarters for Pandemic Prevention and Control (WHPPC) has persisted throughout the period. Medical institutions and some other administrations were the most crucial participants collaborating with the WHPPC. Construction-industry organizations altered pandemic development trends twice to make the situation controllable. Media, large-scale enterprises, etc. set about underscoring themselves contributions since the third stage. Grassroots cadres and healthcare force, small and medium-sized enterprises (SMEs), financial institutions, etc. were essential collaborated objects. Second, four evolution mechanisms of organization collaboration responding to the COVID-19 in Wuhan has been proposed.

Research limitations/implications

First, universality of Wuhan-style governance experience may be affected. Second, the stage-dividing process may not be the most appropriate. Then, data source was single and link characteristics were not considered when modeling.

Practical implications

This study may offer beneficial action guidelines to governmental agencies, the society force, media, construction-industry organizations and the market in other countries or regions suffering from COVID-19. Other organizations involved could also learn from the concluded organizations' contributions and four evolution mechanisms to find improvement directions.

Originality/value

This study adds to the current theoretical knowledge body by verifying the feasibility and effectiveness of investigating cooperation governance in public emergencies from the perspectives of analyzing the across-stage organization collaboration CNs.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 March 1999

M. Ghafory‐Ashtiany

From February to May 1997, three devastating earthquakes occurred in rural areas of north and east of Iran. Considering the three consequent earthquakes in bad weather conditions…

1043

Abstract

From February to May 1997, three devastating earthquakes occurred in rural areas of north and east of Iran. Considering the three consequent earthquakes in bad weather conditions and remoteness of the affected areas, the overall performance of the rescue and relief operations was excellent. In all these earthquakes 95 per cent of people were rescued within first 24 hours and by 48 hours all the affected people were settled in 70,000 tents as temporary shelters. Because of severe winter in north of Iran, reconstruction started one month after the earthquakes and 21,000 new dwellings (out of 29,000 planned) were built before the cold season started. The new seismically designed units are one storey with area of 40 to 60m2. The units were built by the owner with free interest loans, subsidized construction material and under government supervision. By July 1997, 1,500 units and by January 1998, 20,000 units were finished and people were moved in. The overall evaluation of the rescue operation to reconstruction process is satisfactory and the lessons learned during the Manjil earthquake were useful and played a key role in this success. This reconstruction method now so far proved to be successful in rural areas and can be used in future in order to save time, money and reduce social consequences. Gives a brief description of these earthquakes from seismological and structural point of view, evaluation of the rescue and relief operation and reconstruction programme.

Details

Disaster Prevention and Management: An International Journal, vol. 8 no. 1
Type: Research Article
ISSN: 0965-3562

Keywords

1 – 10 of 83