1 – 10 of 17
Article
Publication date: 26 March 2024

Keyu Chen, Beiyu You, Yanbo Zhang and Zhengyi Chen

Prefabricated building has been widely applied in the construction industry all over the world, which can significantly reduce labor consumption and improve construction…

Abstract

Purpose

Prefabricated building has been widely applied in the construction industry all over the world, which can significantly reduce labor consumption and improve construction efficiency compared with conventional approaches. During the construction of prefabricated buildings, the overall efficiency largely depends on the lifting sequence and path of each prefabricated component. To improve the efficiency and safety of the lifting process, this study proposes a framework for automatically optimizing the lifting path of prefabricated building components using building information modeling (BIM), improved 3D-A* and a physic-informed genetic algorithm (GA).

Design/methodology/approach

Firstly, the industry foundation class (IFC) schema for prefabricated buildings is established to enrich the semantic information of BIM. After extracting corresponding component attributes from BIM, the models of typical prefabricated components and their slings are simplified. Further, the slings and elements’ rotations are considered to build a safety bounding box. Secondly, an efficient 3D-A* is proposed for element path planning by integrating both safety factors and variable step size. Finally, an efficient GA is designed to obtain the optimal lifting sequence that satisfies physical constraints.

Findings

The proposed optimization framework is validated in a physics engine with a pilot project, which enables better understanding. The results show that the framework can intuitively and automatically generate the optimal lifting path for each type of prefabricated building component. Compared with traditional algorithms, the improved path planning algorithm significantly reduces the number of nodes computed by 91.48%, resulting in a notable decrease in search time by 75.68%.

Originality/value

In this study, a prefabricated component path planning framework based on the improved A* algorithm and GA is proposed for the first time. In addition, this study proposes a safety-bounding box that considers the effects of torsion and slinging of components during lifting. The semantic information of IFC for component lifting is enriched by taking into account lifting data such as binding positions, lifting methods, lifting angles and lifting offsets.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 19 February 2024

Anita Ollár

There is a renowned interest in adaptability as an important principle for achieving circularity in the built environment. Circular building adaptability (CBA) could enable…

Abstract

Purpose

There is a renowned interest in adaptability as an important principle for achieving circularity in the built environment. Circular building adaptability (CBA) could enable long-term building utilisation and flexible use of space with limited material flows. This paper identifies and analyses design strategies facilitating CBA to propose a framework for enhancing the implementation of the concept.

Design/methodology/approach

Interviews were conducted with professionals experienced in circular building design to explore the questions “How do currently applied design strategies enable CBA?” and “How can CBA be implemented through a conceptual design framework?”. The interviews encircled multi-residential building examples to identify currently applied circular design strategies. The interviews were analysed through qualitative content analysis using CBA determinants as a coding framework.

Findings

The results show that all ten CBA determinants are supported by design strategies applied in current circular building design. However, some determinants are more supported than others, and design strategies are often employed without explicitly considering adaptability. The design strategies that enable adaptability offer long-term solutions requiring large-scale modifications rather than facilitating low-impact adaptation by dwelling occupants. The proposed conceptual design framework could aid architects in resolving these issues and implementing CBA in their circular building design.

Originality/value

This paper’s contribution to CBA is threefold. It demonstrates design strategies facilitating CBA, proposes a conceptual design framework to apply the concept and identifies the need for a more comprehensive application of available adaptability strategies.

Details

International Journal of Building Pathology and Adaptation, vol. 42 no. 7
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 27 February 2023

Guanxiong Wang, Xiaojian Hu and Ting Wang

By introducing the mass customization service mode into the cloud logistics environment, this paper studies the joint optimization of service provider selection and customer order…

192

Abstract

Purpose

By introducing the mass customization service mode into the cloud logistics environment, this paper studies the joint optimization of service provider selection and customer order decoupling point (CODP) positioning based on the mass customization service mode to provide customers with more diversified and personalized service content with lower total logistics service cost.

Design/methodology/approach

This paper addresses the general process of service composition optimization based on the mass customization mode in a cloud logistics service environment and constructs a joint decision model for service provider selection and CODP positioning. In the model, the two objective functions of minimum service cost and most satisfactory delivery time are considered, and the Pareto optimal solution of the model is obtained via the NSGA-II algorithm. Then, a numerical case is used to verify the superiority of the service composition scheme based on the mass customization mode over the general scheme and to verify the significant impact of the scale effect coefficient on the optimal CODP location.

Findings

(1) Under the cloud logistics mode, the implementation of the logistics service mode based on mass customization can not only reduce the total cost of logistics services by means of the scale effect of massive orders on the cloud platform but also make more efficient use of a large number of logistics service providers gathered on the cloud platform to provide customers with more customized and diversified service content. (2) The scale effect coefficient directly affects the total cost of logistics services and significantly affects the location of the CODP. Therefore, before implementing the mass customization logistics service mode, the most reasonable clustering of orders on the cloud logistics platform is very important for the follow-up service combination.

Originality/value

The originality of this paper includes two aspects. One is to introduce the mass customization mode in the cloud logistics service environment for the first time and summarize the operation process of implementing the mass customization mode in the cloud logistics environment. Second, in order to solve the joint decision optimization model of provider selection and CODP positioning, this paper designs a method for solving a mixed-integer nonlinear programming model using a multi-layer coding genetic algorithm.

Details

Kybernetes, vol. 53 no. 4
Type: Research Article
ISSN: 0368-492X

Keywords

Open Access
Article
Publication date: 3 May 2023

Lars Stehn and Alexander Jimenez

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…

Abstract

Purpose

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.

Design/methodology/approach

Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.

Findings

According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.

Originality/value

Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 11 August 2022

Krishna Chauhan, Antti Peltokorpi, Rita Lavikka and Olli Seppänen

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on…

1957

Abstract

Purpose

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on personal preferences and the evaluation of direct costs. Researchers and practitioners have debated appropriate measurement systems for evaluating the impacts of prefabricated products and for comparing them with conventional on-site construction practices. The more advanced, cost–benefit approach to evaluating prefabricated products often inspires controversy because it may generate inaccurate results when converting non-monetary effects into costs. As prefabrication may affect multiple organisations and product subsystems, the method used to decide on production methods should consider multiple direct and indirect impacts, including nonmonetary ones. Thus, this study aims to develop a multi-criteria method to evaluate both the monetary and non-monetary impacts of prefabrication solutions to facilitate decision-making on whether to use prefabricated products.

Design/methodology/approach

Drawing upon a literature review, this research suggests a multi-criteria method that combines the choosing-by-advantage approach with a cost–benefit analysis. The method was presented for validation in focus group discussions and tested in a case involving a prefabricated bathroom.

Findings

The analysis indicates that the method helps a project’s stakeholders communicate about the relative merits of prefabrication and conventional construction while facilitating the final decision of whether to use prefabrication.

Originality/value

This research contributes a method of evaluating the monetary and non-monetary impacts of prefabricated products. The research underlines the need to evaluate the diverse benefits and sacrifices that stakeholder face when considering production methods in construction.

Article
Publication date: 22 March 2024

Qianmai Luo, Chengshuang Sun, Ying Li, Zhenqiang Qi and Guozong Zhang

With increasing complexity of construction projects and new construction processes and methods are adopted, more safety hazards are emerging at construction sites, requiring the…

Abstract

Purpose

With increasing complexity of construction projects and new construction processes and methods are adopted, more safety hazards are emerging at construction sites, requiring the application of the modern risk management methods. As an emerging technology, digital twin has already made valuable contributions to safety risk management in many fields. Therefore, exploring the application of digital twin technology in construction safety risk management is of great significance. The purpose of this study is to explore the current research status and application potential of digital twin technology in construction safety risk management.

Design/methodology/approach

This study followed a four-stage literature processing approach as outlined in the systematic literature review procedure guidelines. It then combined the quantitative analysis tools and qualitative analysis methods to organize and summarize the current research status of digital twin technology in the field of construction safety risk management, analyze the application of digital twin technology in construction safety risk management and identify future research trends.

Findings

The research findings indicate that the application of digital twin technology in the field of construction safety risk management is still in its early stages. Based on the results of the literature analysis, this paper summarizes five aspects of digital twin technology's application in construction safety risk management: real-time monitoring and early warning, safety risk prediction and assessment, accident simulation and emergency response, safety risk management decision support and safety training and education. It also proposes future research trends based on the current research challenges.

Originality/value

This study provides valuable references for the extended application of digital twin technology and offers a new perspective and approach for modern construction safety risk management. It contributes to the enhancement of the theoretical framework for construction safety risk management and the improvement of on-site construction safety.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 February 2024

Alexander Chulok, Maxim Kotsemir, Yadviga Radomirova and Sergey Shashnov

The purpose of this study is to create a methodological approach for identifying priority areas for science and technology (S&T) development and its empirical application within…

Abstract

Purpose

The purpose of this study is to create a methodological approach for identifying priority areas for science and technology (S&T) development and its empirical application within the city of Moscow. This research uncovers a wide range of multicultural and multidisciplinary global trends that will affect the development of major cities in an era of complexity and uncertainty, including the inherent complexity of urban contexts, demographic and socioeconomic trends, as well as scientific and ecological factors.

Design/methodology/approach

The methodological approach is based on classic foresight instruments. Its novelty lays in the blending of qualitative and quantitative methods specially selected as the most appropriate for the identification of S&T areas in an era of complexity and uncertainty, including horizon scanning, bibliometric analysis, expert surveys and the construction of composite indexes with respect to the scope and resources of the research and the selected object for empirical application – Moscow, which is one of the world’s largest megacities. The analysis was performed for the period of 2009–2018 and expert procedures took place in 2019.

Findings

As a result, 25 global trends were identified, evaluated and discussed over the course of an expert survey and subsequent expert events. Ten priority areas of S&T development were determined, including 62 technological sub-areas within them and the most important market niches for all identified technological sub-areas, which could be useful for the world’s megacities. The results of this study are illustrated using the construction sector. Based on the conducted research and results, a list of recommendations on S&T policy measures and instruments were suggested, including the creation of the Moscow Innovation Cluster, which by the end of 2023 contained more than 6,000 projects and initiatives, selected using the findings of this investigation.

Originality/value

This research contributes to the existing literature and research agenda of setting priorities for S&T development and shows how it can be done for a megacity. The blended foresight methodology that was created within the study satisfies the criteria of scientific originality, is repeatable for any interested researcher, is applicable to any other city in the world and demonstrates its high efficiency in empirical application. It could be used for creating new agenda items in S&T policy, setting S&T priorities for a megacity and integrating the results into decision-making processes. This study provides recommendations on the further implementation of the designed methodology and results into a policymaking system. Moreover, the example of the Moscow Innovation Cluster, which was created based on the results of our research, demonstrates these recommendations’ practical significance in real life, which is quite valuable. The limitation of this study is that it is not devoted to urban planning issues directly or the promotion of R&D areas; it is about setting promising S&T priorities in an era of complexity and uncertainty for megacities.

Open Access
Article
Publication date: 25 March 2024

Hossein Shakibaei, Seyyed Amirmohammad Moosavi, Amir Aghsami and Masoud Rabbani

Throughout human history, the occurrence of disasters has been inevitable, leading to significant human, financial and emotional consequences. Therefore, it is crucial to…

Abstract

Purpose

Throughout human history, the occurrence of disasters has been inevitable, leading to significant human, financial and emotional consequences. Therefore, it is crucial to establish a well-designed plan to efficiently manage such situations when disaster strikes. The purpose of this study is to develop a comprehensive program that encompasses multiple aspects of postdisaster relief.

Design/methodology/approach

A multiobjective model has been developed for postdisaster relief, with the aim of minimizing social dissatisfaction, economic costs and environmental damage. The model has been solved using exact methods for different scenarios. The objective is to achieve the most optimal outcomes in the context of postdisaster relief operations.

Findings

A real case study of an earthquake in Haiti has been conducted. The acquired results and subsequent management analysis have effectively assessed the logic of the model. As a result, the model’s performance has been validated and deemed reliable based on the findings and insights obtained.

Originality/value

Ultimately, the model provides the optimal quantities of each product to be shipped and determines the appropriate mode of transportation. Additionally, the application of the epsilon constraint method results in a set of Pareto optimal solutions. Through a comprehensive examination of the presented solutions, valuable insights and analyses can be obtained, contributing to a better understanding of the model’s effectiveness.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2042-6747

Keywords

Open Access
Article
Publication date: 1 December 2023

Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…

Abstract

Purpose

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.

Design/methodology/approach

A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.

Findings

The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.

Originality/value

This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 4 December 2023

Ali M. Saad, Mohammed Dulaimi, Suhaib Arogundade, Sambo Lyson Zulu and Chris Gorse

The recent failures and insolvencies of organisations related to the modern methods of construction (MMC) have gained increased attention and controversy across the UK…

Abstract

Purpose

The recent failures and insolvencies of organisations related to the modern methods of construction (MMC) have gained increased attention and controversy across the UK construction sector. Such failures are linked to their inability to achieve an economy of scale and drive key clients to accept the MMC as an alternative to traditional methods. This paper aims to unravel whether a phenomenon of “innovation negativism” has manifested and is contributing to public clients' indecision towards broader MMC, whether this is only linked to past negative experiences formed after the Second World War or whether additional contributing reasons exist to influence adoption.

Design/methodology/approach

This study focusses on exploring the decision-making of the UK public construction sector; therefore, this paper adopts a qualitative approach, utilising interviews with 14 carefully selected MMC experts, government advisors and public clients. The phenomenological stance adopted herewith enables the authors to make better sense of the perceptions of the interviewees, leading to the conceptualisation of the innovation negativism phenomenon.

Findings

The paper identifies nine themes that may be argued to promote a profound understanding of the MMC negativism influencing public clients' decision-making. The study has found that more than just the previous negative perceptions formulated post Second World War are driving innovation negativism in the UK public sector. Notably, the emerging themes are incomprehension, lacking evidence, communication, relationship history, bad experiences, uncertainty, inadequate experimentation, the business case and localism.

Originality/value

This study is the first construction management research that acts as a fair departure point to conceptualise the reasoning behind innovation negativism in the construction setting. Through mirroring demand's unipolarity for traditional methods, policy and decision-makers can now rely on the conceptualised reasoning to determine practical solutions to overcome clients' indecisions towards MMC.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

1 – 10 of 17