Article
Publication date: 27 July 2023

Ning Huang, Qiang Du, Libiao Bai and Qian Chen

In recent decades, infrastructure has continued to develop as an important basis for social development and people's lives. Resource management of these large-scale projects has…

Abstract

Purpose

In recent decades, infrastructure has continued to develop as an important basis for social development and people's lives. Resource management of these large-scale projects has been immensely concerned because dozens of construction enterprises (CEs) often work together. In this situation, resource collaboration among enterprises has become a key measure to ensure project implementation. Thus, this study aims to propose a systematic multi-agent resource collaborative decision-making optimization model for large projects from a matching perspective.

Design/methodology/approach

The main contribution of this work was an advancement of the current research by: (1) generalizing the resource matching decision-making problem and quantifying the relationship between CEs. (2) Based on the matching domain, the resource input costs and benefits of each enterprise in the associated group were comprehensively analyzed to build the mathematical model, which also incorporated prospect theory to map more realistic decisions. (3) According to the influencing factors of resource decision-making, such as cost, benefit and attitude of decision-makers, determined the optimal resource input in different situations.

Findings

Numerical experiments were used to verify the effectiveness of the multi-agent resource matching decision (MARMD) method in this study. The results indicated that this model could provide guidance for optimal decision-making for each participating enterprise in the resource association group under different situations. And the results showed the psychological preference of decision-makers has an important influence on decision performance.

Research limitations/implications

While the MARMD method has been proposed in this research, MARMD still has many limitations. A more detailed matching relationship between different resource types in CEs is still not fully analyzed, and relevant studies about more accurate parameters of decision-makers’ psychological preferences should be conducted in this area in the future.

Practical implications

Compared with traditional projects, large-scale engineering construction has the characteristics of huge resource consumption and more participants. While decision-makers can determine the matching relationship between related enterprises, this is ambiguous and the wider range will vary with more participants or complex environment. The MARMD method provided in this paper is an effective methodological tool with clearer decision-making positioning and stronger actual operability, which could provide references for large-scale project resource management.

Social implications

Large-scale engineering is complex infrastructure projects that ensure national security, increase economic development, improve people's lives and promote social progress. During the implementation of large-scale projects, CEs realize value-added through resource exchange and integration. Studying the optimal collaborative decision of multi-agent resources from a matching perspective can realize the improvement of resource transformation efficiency and promote the development of large-scale engineering projects.

Originality/value

The current research on engineering resources decision-making lacks a matching relationship, which leads to unclear decision objectives, ambiguous decision processes and poor operability decision methods. To solve these issues, a novel approach was proposed to reveal the decision mechanism of multi-agent resource optimization in large-scale projects. This paper could bring inspiration to the research of large-scale project resource management.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 June 2022

María Jesús Rosado García and Daniel Crespo Delgado

This work aims to demonstrate the feasibility of fully preserving the historical heritage at the same time reordering the cities and their traffic.

Abstract

Purpose

This work aims to demonstrate the feasibility of fully preserving the historical heritage at the same time reordering the cities and their traffic.

Design/methodology/approach

This paper describes the sustainable solution designed for the landscape change required and to maintain the bridge integrity by excavating under the pier with the maintenance of traffic during its execution.

Findings

It is concluded that the elimination of urban motorways on the surface often leads to the excavation of tunnels under the existing buildings, with little coverage in most of them. This complicates the implementation of burials in cities with an important historical heritage, which must be given conservation priority in the choice of technical solutions.

Originality/value

The Segovia Bridge over the Manzanares River, the oldest bridge in Madrid, was built in the 16th century. With the burial of the M-30 motorway, it has been necessary to build a tunnel immediately under one of the bridge piers, practically without lining between the foundations and the upper slab of the tunnel.

Details

Journal of Cultural Heritage Management and Sustainable Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-1266

Keywords

Article
Publication date: 16 April 2024

Chaofan Wang, Yanmin Jia and Xue Zhao

Prefabricated columns connected by grouted sleeves are increasingly used in practical projects. However, seismic fragility analyses of such structures are rarely conducted…

Abstract

Purpose

Prefabricated columns connected by grouted sleeves are increasingly used in practical projects. However, seismic fragility analyses of such structures are rarely conducted. Seismic fragility analysis has an important role in seismic hazard evaluation. In this paper, the seismic fragility of sleeve connected prefabricated column is analyzed.

Design/methodology/approach

A model for predicting the seismic demand on sleeve connected prefabricated columns has been created by incorporating engineering demand parameters (EDP) and probabilities of seismic failure. The incremental dynamics analysis (IDA) curve clusters of this type of column were obtained using finite element analysis. The seismic fragility curve is obtained by regression of Exponential and Logical Function Model.

Findings

The IDA curve cluster gradually increased the dispersion after a peak ground acceleration (PGA) of 0.3 g was reached. For both columns, the relative displacement of the top of the column significantly changed after reaching 50 mm. The seismic fragility of the prefabricated column with the sleeve placed in the cap (SPCA) was inadequate.

Originality/value

The sleeve was placed in the column to overcome the seismic fragility of prefabricated columns effectively. In practical engineering, it is advisable to utilize these columns in regions susceptible to earthquakes and characterized by high seismic intensity levels in order to mitigate the risk of structural damage resulting from ground motion.