Search results
1 – 9 of 9Cong Wang, Henry Liu, Michael C.P. Sing and Jin Wu
Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction…
Abstract
Purpose
Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction. However, Private Public Partnerships (PPPs) have been subjected to a long pre-construction, thereby leading to an inefficient development process. Therefore, the purpose of this paper is to pay attention to the influencing factors elongating the pre-construction duration.
Design/methodology/approach
Based on data of 5,677 PPP projects between 2009 and 2021 in China, the authors adopt the Accelerated Failure Time (AFT) model in duration analysis to empirically analyze the following underlying dynamics determining the duration of PPP pre-construction stages: (1) policy uncertainty; (2) corruption; and (3) procurement method selection. To observe the influencing paths more specifically, the authors divided the pre-construction duration into the pre-tendering period and tendering period and regressed them separately.
Findings
The results indicate that the pre-construction duration is significantly prolonged with increased policy uncertainty and corruption degree as well as the use of tendering methods. Meanwhile, the above factors have a greater impact on the pre-tendering period than the tendering period.
Originality/value
The contribution of this study is twofold: (1) theoretically, this paper provides new evidence on the impact of PPP policy uncertainty, corruption and procurement method selection on the pre-construction duration. It complements empirical studies on the factors elongating the time efficiency of PPPs projects. (2) In practice, it provides a specific path for the government to improve the time efficiency of PPPs.
Details
Keywords
Angeliki Kylili, Phoebe-Zoe Georgali, Petros Christou and Paris Fokaides
The built environment is taking enormous leaps towards its digitalization. Computer-aided tools such as building information modeling (BIM) are found in the forefront of this…
Abstract
Purpose
The built environment is taking enormous leaps towards its digitalization. Computer-aided tools such as building information modeling (BIM) are found in the forefront of this evolution, playing a critical role in creating the foundations for the upcoming development of smart low-carbon cities. However, the potential of BIM is still untapped – links will need to be created among the available and forthcoming methodologies under one integral operational system. The purpose of this paper is to present an integrated BIM-based life cycle-oriented framework for achieving sustainable constructions at the pre-construction phase. The developed framework represents an example of the approaches that the construction industry will need to adopt to integrate the different tools under an integrated smart city context.
Design/methodology/approach
The methodological approach follows the development of four same-volume different-configuration three-dimensional BIM designs, which are coupled with life cycle assessment (LCA) tools for establishing sustainable building design.
Findings
The results of this paper indicated that the choice of building design and shape can play a significant role in reducing the embodied energy and embodied carbon of buildings, achieving a reduction of up to 15% compared to a reference building of same volume and gross floor area.
Originality/value
The originality of this paper is found in its approach application by coupling three-dimensional BIM models with LCA data, the use of reinforcement detailing in an nD BIM study and the employment of country-specific LCA databases.
Details
Keywords
Ayman Ahmed Ezzat Othman and Yomna Abdelghany El-Saeidy
The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design…
Abstract
Purpose
The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design process.
Design/methodology/approach
A research methodology consists of literature review, case studies and survey questionnaire was designed to achieve the abovementioned aim. First, the literature review was used to investigate CW, CW generated during the design process, the design process and ESI. Second, two construction projects were analysed to investigate the role of ESI towards reducing CW generated during the design waste. Third, a survey questionnaire was carried out with a representative sample of architectural design firms (ADFs) in Egypt to examine their perception and application of ESI towards reducing CW generated during the design process. Based on the results of the above, the research developed a framework to facilitate ESI during the design process to reduce CW.
Findings
Through literature review, the research highlighted the causes of CW generated during the design process and identified the benefits and challenges that encounter ESI in ADFs. Results of data analysis showed that “last-minute changes due to client requirements” was ranked the highest challenges of ESI in ADFs in Egypt followed by “lack of design experience”. Moreover, “providing technical information about materials and equipment and their capabilities” was ranked by respondents as the highest contributions of suppliers during the design process which leads to waste reduction followed by “better estimation of materials and costs”. Finally, respondents stated that “resistance of ADFs to include suppliers in the design phase” was ranked the highest challenge of ESI in the design process followed by “no clear guidelines or policies that organise ESI”.
Research limitations/implications
Because of the conceptual nature of the proposed framework, it has to be tested and validated to ensure its capability to overcome the challenges of ESI as an approach for reducing CW generated during the design process.
Practical implications
This research presents a practical solution to the problem of CW generated during the design process through ESI.
Originality/value
The research discussed the causes of CW originated from the design process and the benefits and challenges of ESI in ADFs. It investigated the perception and application of ESI in ADFs in Egypt. The proposed framework which was designed to facilitate the integration of suppliers in the early stages of the project life cycle represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.
Details
Keywords
Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz
This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…
Abstract
Purpose
This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.
Design/methodology/approach
A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.
Findings
The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.
Originality/value
This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.
Details
Keywords
Mohammad Mayouf and Ciaran Gilligan
In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered…
Abstract
Purpose
In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered ambiguous and provides a limited reflection of the issue, which makes it complicated to trace how it originates in the first place. This study aims to examine the causes that lead to underpayments and develop a holistic synthesis of underpayments for subcontractors in the lifecycle of a construction project.
Design/methodology/approach
An open-ended and closed-ended questionnaire was used to collect the data using purposeful sampling with 28 construction stakeholders who ranged from main contractors, subcontractors and others (Small medium enterprises SMEs, Consultancies, Clients etc.). Data collected was analysed to trace drivers and the impact of underpayment and suggested mitigation strategies to be identified whilst viewing the perspectives of a main contractor and subcontractor.
Findings
The findings show that the most prominent driver for underpayments is variation disputes followed by cash flow. The research also suggests mitigation strategies such as collaborative working, more robust budget control and early identification of risks as potential remedies to overcome the underpayment issue. The research concludes with a framework that elicits the complexity underlying underpayments for subcontractors in construction projects.
Originality/value
The research evolves the understanding that underpayment is a complex phenomenon, relying heavily on the data/information exchange mechanism between the main contractor and subcontractors. This research provokes the need to understand underpayment further so it can be mitigated.
Details
Keywords
Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa
This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…
Abstract
Purpose
This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.
Design/methodology/approach
A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.
Findings
An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.
Research limitations/implications
The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.
Originality/value
This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.
Oluseyi Julius Adebowale and Justus Ngala Agumba
Despite the significance of the construction industry to the nation's economic growth, there is empirical evidence that the sector is lagging behind other industries in terms of…
Abstract
Purpose
Despite the significance of the construction industry to the nation's economic growth, there is empirical evidence that the sector is lagging behind other industries in terms of productivity growth. The need for improvements inspired the industry's stakeholders to consider using emerging technologies that support the enhancement. This research aims to report augmented reality applications essential for contractors' productivity improvement.
Design/methodology/approach
This study systematically reviewed academic journals. The selection of journal articles entailed searching Scopus and Web of Science databases. Relevant articles for reviews were identified and screened. Content analysis was used to classify key applications into six categories. The research results were limited to journal articles published between 2010 and 2021.
Findings
Augmented reality can improve construction productivity through its applications in assembly, training and education, monitoring and controlling, interdisciplinary function, health and safety and design information.
Originality/value
The research provides a direction for contractors on key augmented reality applications they can leverage to improve their organisations' productivity.
Details
Keywords
This paper aims to explore the relationship between market pricing and design quality within the development industry. Currently, there is a lack of research that examines real…
Abstract
Purpose
This paper aims to explore the relationship between market pricing and design quality within the development industry. Currently, there is a lack of research that examines real estate at the property level. Development quality is widely believed to have diminished over the past decades, while many investors seem uninterested in the design process. The study aims to address these issues through a pricing model that integrates design attributes. It is hoped that empirical findings will invite broader stakeholder interest in the design process.
Design/methodology/approach
The research establishes a framework for assessing spatial compliance across residential developments within London. Compliance is assessed across ten boroughs, with technical space guidelines used as a proxy for design quality. Transaction prices and spatial assessments are aligned within a hedonic pricing model. Empirical findings are used to establish whether undermining spatial standards presents a significant development risk.
Findings
Findings suggest a relationship between sale time and unit size, with “compliant” units typically transacting earlier than “non-compliant” units. Almost half of the 1,600 apartments surveyed appear to undermine technical guidelines.
Research limitations/implications
It is suggested that an array of design attributes be explored that extend beyond unit size. Additionally, future studies may consider the long-term implications of design quality via secondary transaction prices.
Practical implications
Practical implications include the development of a more scientific approach to design valuation. This may enhance the position of product design management within the development industry and architectural services.
Social implications
Social implications may include improvement in residential design.
Originality/value
An innovative approach combines a thorough understanding of both design and economic principles.
Details
Keywords
Ephraim Zulu, Sambo Lyson Zulu, Mwansa Chabala, Neema Kavishe, Charles Chifunda and Innocent Musonda
While previous studies have highlighted the importance of incorporating environmental sustainability in building designs, there is a paucity of studies that assess the extent to…
Abstract
Purpose
While previous studies have highlighted the importance of incorporating environmental sustainability in building designs, there is a paucity of studies that assess the extent to which design teams in developing countries consider environmental sustainability at the building design stage. Therefore, using Zambia as a case study, this study examined the extent to which infrastructure design teams in a developing country consider environmental sustainability at the design stage.
Design/methodology/approach
The study used a qualitative research approach using structured interviews because there are hardly any studies which have explored the extent to which designers incorporate environmental sustainability in infrastructure designs in developing countries. The data is analysed thematically using the ATLAS.ti software.
Findings
The results show that environmental sustainability is not an important design consideration because it is secondary to functional, technical and aesthetic considerations. Environmental considerations are also made in an ad hoc manner and when it is cost-effective for the project. Regulatory requirements pertaining to environmental protection are adhered to without any cost considerations. It was, therefore, theorised that building design teams in developing countries make technical, functional and aesthetic consideration during the infrastructure design stage ahead of environmental considerations.
Originality/value
There is a paucity of studies that have investigated whether building infrastructure designers consider issues of environmental sustainability at the design stage in developing countries. The findings have practical implications on how developing countries can foster environmental sustainability at the design stage and avoid generating a building infrastructure stock that will require environmental resilience adaptation in the future.
Details