1 – 10 of 57Cong Wang, Henry Liu, Michael C.P. Sing and Jin Wu
Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction…
Abstract
Purpose
Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction. However, Private Public Partnerships (PPPs) have been subjected to a long pre-construction, thereby leading to an inefficient development process. Therefore, the purpose of this paper is to pay attention to the influencing factors elongating the pre-construction duration.
Design/methodology/approach
Based on data of 5,677 PPP projects between 2009 and 2021 in China, the authors adopt the Accelerated Failure Time (AFT) model in duration analysis to empirically analyze the following underlying dynamics determining the duration of PPP pre-construction stages: (1) policy uncertainty; (2) corruption; and (3) procurement method selection. To observe the influencing paths more specifically, the authors divided the pre-construction duration into the pre-tendering period and tendering period and regressed them separately.
Findings
The results indicate that the pre-construction duration is significantly prolonged with increased policy uncertainty and corruption degree as well as the use of tendering methods. Meanwhile, the above factors have a greater impact on the pre-tendering period than the tendering period.
Originality/value
The contribution of this study is twofold: (1) theoretically, this paper provides new evidence on the impact of PPP policy uncertainty, corruption and procurement method selection on the pre-construction duration. It complements empirical studies on the factors elongating the time efficiency of PPPs projects. (2) In practice, it provides a specific path for the government to improve the time efficiency of PPPs.
Details
Keywords
Ankitha Vijayakumar, Muhammad Nateque Mahmood, Argaw Gurmu, Imriyas Kamardeen and Shafiq Alam
Freeways in Australia play a significant role in connecting distant communities, shifting freight and strengthening the country’s economy. To meet the growing needs of present and…
Abstract
Purpose
Freeways in Australia play a significant role in connecting distant communities, shifting freight and strengthening the country’s economy. To meet the growing needs of present and future generations, delivering a socially sustainable road infrastructure that creates generational benefits is essential. However, the existing literature reveals the lack of comprehensive indicators to assess the social sustainability performance of freeway projects. Therefore, this paper aims to identify a critical set of system-specific indicators to evaluate the life cycle social footprint of Australian freeways.
Design/methodology/approach
This study conducted 31 interview questionnaire surveys with actively engaged stakeholders involved in various freeway projects around Australia. The data collected was analysed using fuzzy set theory and other statistical approaches.
Findings
The study identified 42 critical indicators for assessing the social sustainability performance throughout the life cycle of freeways in the Australian context. For example, stakeholder involvement, reduction of casualty rate due to road accidents, fair remuneration to project workforce and improved accessibility to required services.
Practical implications
The context-specific opinions extracted from the industry experts and the comprehensive set of critical indicators identified would ensure that all the vital aspects of social sustainability are considered throughout the life cycle of Australian freeways in the future, assisting the decision-makers in enhancing the project’s social sustainability performance.
Originality/value
The linguistic explanations associated with the ratings given by the industry experts provide greater insight into the context of the life cycle social sustainability assessment of Australian freeways exclusively.
Details
Keywords
Hasith Chathuranga Victar, B.A.K.S. Perera, Asha Dulanjalie Palihakkara and Kaveesha Gihani Dewagod
The construction industry is shifting towards becoming more circular by reducing waste, reusing building materials and embracing regenerative solutions for energy generation and…
Abstract
Purpose
The construction industry is shifting towards becoming more circular by reducing waste, reusing building materials and embracing regenerative solutions for energy generation and biodiversity conservation. Thus, construction professionals must perform diversified services to achieve a circular built environment (CBE). Implementing resource planning and waste management in CBE has already posed challenges to the quantity surveying profession; thus, quantity surveyors (QSs) should be equipped with new roles and competencies to tackle challenges in achieving a CBE. Hence, this study aimed to investigate the functions and competencies of QSs at the design and building material sourcing stages in achieving a CBE according to 3R principles.
Design/methodology/approach
The research apprehended a qualitative approach, including two expert interview rounds adhering to the Delphi technique with 14 and 11 experts per each round. Manual content analysis was incorporated to analyse the collected data.
Findings
The research findings revealed the important roles and competencies of QSs in achieving a CBE. In addition, essential functions and competencies were categorised according to the 3R principles (reduce, reuse, recycle) to successfully implement CBE during the Design and Building Material Sourcing stages. According to the 3R principles of CBE, cost control, cost planning, feasibility studies, measurement and quantification, risk management, value engineering and innovations and technologies were well-received by most interviewees as essential roles of QSs during the Design and Building Material Sourcing stages. Further, basic/mandatory competencies (personal, interpersonal, professional practice and business skills), economic analysis, BIM management, cost management and risk management are highly regarded by experts for QS as important competencies to achieve CBE.
Originality/value
With new construction trends, QSs must enhance their conventional roles and competencies and search for new skills and competencies. Those skills and competencies could be linked to the CE concept, either directly or indirectly. Since QS holds a prominent place in sustainable construction in CBE, adapting to changes in the construction industry such as CBE is timely for QSs. Further, there is a shortage of literature regarding QSs' roles and competencies in achieving a CBE; thus, this study will contribute by identifying new avenues for QSs in achieving a CBE in the practice and the research.
Details
Keywords
Nandini Sharma and Boeing Laishram
Construction industry faces challenges in making objective decisions due to monetary value attached to quality. Among various quality management techniques available, cost of…
Abstract
Purpose
Construction industry faces challenges in making objective decisions due to monetary value attached to quality. Among various quality management techniques available, cost of quality (COQ) is one such method used to address the concern. However, the absence of measurable COQ factors to monitor quality costs hampers the implementation of COQ framework in the construction industry. Therefore, this study aims to identify COQ factors focused on visible factors (VF) and hidden factors (HF) and the current requirements to achieve it.
Design/methodology/approach
This study is based on Preferred Reporting Items for Systematic Review and Meta-Analyses protocol guidelines. The present study identified 57 articles published between 1992 and 2023 in peer-reviewed journals.
Findings
The findings reveal 22 factors, which are grouped into four categories based on COQ. Through systematic review, the authors observed limited methodological and theoretical diversity. In fact, there are no quantitative frameworks to calculate COQ. The study, therefore, developed a framework comprising four major routes/paths of COQ factors within the framework.
Practical implications
The COQ routes developed through this study will enable the practitioners to meticulously categorise VF and HF, facilitating quantifying of quality throughout the lifecycle of project, which is currently absent from the existing quality assurance/quality control (QA/QC) approach. In addition, these COQ routes stand as essential construction strategies, significantly enhancing outcomes related to time, cost, quality, sustainability and fostering closer relationships within project frameworks.
Originality/value
The current study contributes significantly to the existing body of knowledge by developing various COQ routes and proposing future research directions to address gaps in the literature.
Details
Keywords
Nasim Babazadeh, Jochen Teizer, Hans-Joachim Bargstädt and Jürgen Melzner
Construction activities conducted in urban areas are often a source of significant noise disturbances, which cause psychological and health issues for residents as well as…
Abstract
Purpose
Construction activities conducted in urban areas are often a source of significant noise disturbances, which cause psychological and health issues for residents as well as long-term auditory impairments for construction workers. The limited effectiveness of passive noise control measures due to the close proximity of the construction site to surrounding neighborhoods often results in complaints and eventually lawsuits. These can then lead to delays and cost overruns for the construction projects.
Design/methodology/approach
The paper proposes a novel approach to integrating construction noise as an additional dimension into scheduling construction works. To achieve this, a building information model, including the three-dimensional construction site layout object geometry, resource allocation and schedule information, is utilized. The developed method explores further project data that are typically available, such as the assigned equipment to a task, its precise location, and the estimated duration of noisy tasks. This results in a noise prediction model by using noise mapping techniques and suggesting less noisy alternative ways of construction. Finally, noise data obtained from sensors in a case study contribute real values for validating the proposed approach, which can be used later to suggest solutions for noise mitigation.
Findings
The results of this study indicate that the proposed approach can accurately predict construction noise given a few available parameters from digital project planning and sensors installed on a construction site. Proactively integrating construction noise control measures into the planning process has benefits for both residents and construction managers, as it reduces construction noise-related disturbances, prevents unexpected legal issues and ensures the health and well-being of the workforce.
Originality/value
While previous research has concentrated on real-time data collection using sensors, a more effective solution would also involve addressing and mitigating construction noise during the pre-construction work planning phase.
Details
Keywords
Emmanuel Chidiebere Eze, Douglas Omoregie Aghimien, Clinton Ohis Aigbavboa and Onyinye Sofolahan
This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a…
Abstract
Purpose
This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a developing country's perspective. This was done with a view to reducing the waste generated in construction projects particularly at the design and pre-contract stages.
Design/methodology/approach
The study adopted a post-positivism philosophical approach, which informed the use of a quantitative research design and a questionnaire as instrument for data collection. The data gathered from construction professionals in the Nigeria construction industry were analysed using an array of statistical tools such as frequency, percentage, Kruskal–Wallis H-test, Kendall's coefficient of concordance, chi-square and exploratory factors analysis.
Findings
The study revealed five major groups of factors causing CW at the design and pre-contract stages that can be avoided or minimised through BIM implementation. These are; (1) errors in design and documentation, (2) specification and quality factors, (3) estimating and site condition factors, (4) planning of work factors and (5) procurement related factors.
Practical implications
The findings of the study offer practical insight for industry participants on the need for BIM implementation to reduce CW by identifying the diverse areas responsible for these waste generation.
Originality/value
While there has been significant literature on BIM implementation, contributions on the effect of this technology in reducing waste generation particular at the design and pre-contract stages in developing countries has been almost non-existent. This study strives to fill in this gap by showcasing the major waste generating activities that can be avoided through the use of BIM.
Details
Keywords
Stephanie Sheamar, Gayan Wedawatta, Maheshi Tennakoon, Roshani Palliyaguru and Maxwell Fordjour Antwi-Afari
Cost overrun is a significant issue in construction, an undesirable feature the industry has long been associated with. Poor procurement practices are often blamed for subsequent…
Abstract
Purpose
Cost overrun is a significant issue in construction, an undesirable feature the industry has long been associated with. Poor procurement practices are often blamed for subsequent cost overruns in construction, especially with conventional procurement methods leading to outrageous cost overruns. The purpose of this study is to review the features of the new models of construction procurement (NMCP) and assess their potential to reduce cost overruns in construction projects.
Design/methodology/approach
A literature review was conducted to identify the issues of procurement leading to cost escalations. Primary data were obtained through exploratory, semi-structured interviews using a case study approach.
Findings
Clients’ lack of knowledge was highlighted as a key issue in procurement that interlinks with many factors causing cost escalation. The findings suggest that the features contained within the NMCP, such as early contractor involvement and collaboration throughout the project team, have the potential to make a positive contribution to addressing cost escalation in construction.
Research limitations/implications
The primary research was undertaken as an exploratory study and presents the contractor's perspective. Further research is therefore suggested, with multiple organisations representing all key stakeholders in a construction project, including clients, consultants, sub-contractors and suppliers.
Practical implications
The study recommends awareness of the NMCP be raised throughout the industry, and simplified information must be made available to help widen uptake of these contemporary procurement methods.
Originality/value
Addressing the dearth of research concerning the use of NMCP within the industry, this study makes a niche contribution to the body of knowledge on construction cost management by illustrating the potential offered by these new procurement methods for addressing cost escalation. For an industry where collaboration is accepted with reservations, this case study demonstrates how novel collaborative strategies such as open book costing, project bank accounts and shared pain and gain mechanisms can be implemented as part of the procurement strategy and how such strategies can contribute towards minimising the cost escalation inherent in construction projects.
Details
Keywords
Mohammed Sharar, Kofi Agyekum, Patrick Manu, Che Khairil Izam Che Ibrahim, Abdul-Majeed Mahamadu, Maxwell Fordjour Antwi-Afari and Frederick Owusu Danso
Design for safety (DfS), also known as prevention through design (PtD), is a concept that mitigates accidents and hazards through considerations during the design stage of…
Abstract
Purpose
Design for safety (DfS), also known as prevention through design (PtD), is a concept that mitigates accidents and hazards through considerations during the design stage of building projects. The literature provides much information on this concept, but such information is only limited to a few developed countries such as the UK, the USA and Australia. There is limited insight into DfS implementation in the construction industry of several countries, including countries in the Gulf Cooperation Council (GCC) such as Kuwait. Therefore, this study investigates DfS implementation among design professionals in the Kuwait construction industry.
Design/methodology/approach
The study used a questionnaire survey to obtain data from design professionals. The data were analysed using descriptive and inferential statistics (i.e. analysis of variance and t-test).
Findings
The results revealed that DfS awareness among design professionals is very high; there is a very high willingness among design professionals to apply the concept, and design professionals generally view DfS implementation as important. Despite these, the frequency of implementation of DfS practices is generally moderate. In addition, the results revealed that though there is a high interest in DfS training among the design professionals, their actual engagement in training is low. The results also suggest some association between the frequency of engagement in the DfS practices and designers' DfS awareness, training and education. DfS related regulations, industry guidance, formal education and training are considered by design professionals to have the greatest influence on DfS implementation in Kuwait.
Originality/Value
These emerging findings both mirror and contradict aspects of the outcomes of previous DfS studies in other countries. Furthermore, the findings from this study provide insights into a less investigated area regarding work-related health and safety in the GCC region. It offers new and additional information and insights into the current state-of-the-art DfS implementation in the construction industry in Kuwait. In view of the findings, joined-up efforts by government, industry and academia are needed to enhance DfS implementation by design professionals in Kuwait.
Details
Keywords
Ozan Okudan, Gökhan Demirdöğen and Zeynep Işık
The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also…
Abstract
Purpose
The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also investigates how to select the most convenient infrastructure project for suspension.
Design/methodology/approach
The proposed framework includes an extensive set of factors and a novel comparison mechanism that can reveal the most convenient infrastructure project to be suspended. A comprehensible literature review and focus group discussion (FGD) sessions were conducted to identify factors that should be considered for suspension. Then, the neutrosophic analytic hierarchy process (N-AHP) method was used to determine the relative importance of the factors. Finally, the proposed comparison mechanism was demonstrated through a hypothetical case study and Technique for order of preference by similarity to ideal solution (TOPSIS) analysis.
Findings
Results showed that suspension decisions cannot be made merely based on “financial” factors. Instead, the other aspects, namely “Technical and managerial” and “Social and Environmental”, should also be taken into consideration. Second, factors related to the initial investment, cost of refinancing, cash flow, permits and approvals, insufficiency of bidders, degradation of the components, reputation, impact on stakeholders and criticality of the infrastructure were particularly elaborated as the most significant, needing the utmost attention of the decision-makers. Lastly, the results demonstrated that the proposed comparison mechanism has considerable potential to identify the most convenient infrastructure project for suspension.
Originality/value
Public infrastructure projects are often under pressure due to the inflationary state and economic stagnation of countries after major crises. The suspension decision for infrastructure projects necessitates comprehensible assessments to consider all consequences. Studies have widely investigated the contractual and legal aspects of project suspension in light of existing literature. However, little effort has been devoted to identifying the factors that decision-makers should consider before suspending a particular infrastructure project. Furthermore, existing literature does not investigate how to select the most convenient infrastructure project for suspension either. Thus, by developing a specific suspension framework for infrastructure projects by considering various factors, this study is the earliest attempt to examine the contract suspension mechanism of public infrastructure projects. In this respect, the study significantly contributes to the theory of contract management domain and has important managerial implications.
Details
Keywords
Srividhya Raju Sridharan, Sagar Malsane and Govinda Shashikant Bhutada
The purpose of the paper is to analyse the sequence of forces acting as barriers in the usage of drones in the construction industry using interpretive structural modelling (ISM)…
Abstract
Purpose
The purpose of the paper is to analyse the sequence of forces acting as barriers in the usage of drones in the construction industry using interpretive structural modelling (ISM). The usage of drones in the construction industry is brought out phase-wise with the help of literature and live cases. Barriers to the usage of drones in construction and steps to derive the interaction between them are described in detail.
Design/methodology/approach
The extraction of barriers to the usage of drones in construction is done through cases and supported by the literature. The identification of the interaction between the barriers is done through multi-criteria decision models, namely, ISM and Matriced Impacts Croises Multiplication Appliquee a un Classement (MICMAC) and the results are presented in the form of a hierarchical structure. The paper highlights the potential for the usage of drones in every phase of construction across three stages of construction and eight different applications.
Findings
The findings on the interaction between barriers show that technical and research and development-related barriers have a higher driving power, ultimately influencing negativity among stakeholders in drone usage for construction. By analysing interrelationships between barriers, management can frame suitable strategies to adopt drone usage in projects. Awareness about the strength of certain barriers can help management take steps to mitigate the same.
Research limitations/implications
By analysing interrelationships between barriers, management can frame suitable strategies to adopt drone usage in projects. A major limitation is a restriction of the study area to the Indian subcontinent. However, the authors believe that the results can be applied across countries where drone technology is at the nascent stage.
Practical implications
Awareness about the strength of certain barriers can help stakeholders take steps to mitigate the same.
Social implications
The results of this research also give some inputs to the government’s drone policy for wider usage of drones in the construction industry.
Originality/value
To the best of the authors’ knowledge, most studies on drones in construction industry bring out a list various challenges to their adoption. In this study, the authors have gone further to perform a hierarchical sequencing of barriers to drone adoption based on challenges faced in an emerging economy like India.