Article
Publication date: 15 December 2022

Cong Wang, Henry Liu, Michael C.P. Sing and Jin Wu

Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction…

Abstract

Purpose

Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction. However, Private Public Partnerships (PPPs) have been subjected to a long pre-construction, thereby leading to an inefficient development process. Therefore, the purpose of this paper is to pay attention to the influencing factors elongating the pre-construction duration.

Design/methodology/approach

Based on data of 5,677 PPP projects between 2009 and 2021 in China, the authors adopt the Accelerated Failure Time (AFT) model in duration analysis to empirically analyze the following underlying dynamics determining the duration of PPP pre-construction stages: (1) policy uncertainty; (2) corruption; and (3) procurement method selection. To observe the influencing paths more specifically, the authors divided the pre-construction duration into the pre-tendering period and tendering period and regressed them separately.

Findings

The results indicate that the pre-construction duration is significantly prolonged with increased policy uncertainty and corruption degree as well as the use of tendering methods. Meanwhile, the above factors have a greater impact on the pre-tendering period than the tendering period.

Originality/value

The contribution of this study is twofold: (1) theoretically, this paper provides new evidence on the impact of PPP policy uncertainty, corruption and procurement method selection on the pre-construction duration. It complements empirical studies on the factors elongating the time efficiency of PPPs projects. (2) In practice, it provides a specific path for the government to improve the time efficiency of PPPs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 July 2023

Ankitha Vijayakumar, Muhammad Nateque Mahmood, Argaw Gurmu, Imriyas Kamardeen and Shafiq Alam

Freeways in Australia play a significant role in connecting distant communities, shifting freight and strengthening the country’s economy. To meet the growing needs of present and…

Abstract

Purpose

Freeways in Australia play a significant role in connecting distant communities, shifting freight and strengthening the country’s economy. To meet the growing needs of present and future generations, delivering a socially sustainable road infrastructure that creates generational benefits is essential. However, the existing literature reveals the lack of comprehensive indicators to assess the social sustainability performance of freeway projects. Therefore, this paper aims to identify a critical set of system-specific indicators to evaluate the life cycle social footprint of Australian freeways.

Design/methodology/approach

This study conducted 31 interview questionnaire surveys with actively engaged stakeholders involved in various freeway projects around Australia. The data collected was analysed using fuzzy set theory and other statistical approaches.

Findings

The study identified 42 critical indicators for assessing the social sustainability performance throughout the life cycle of freeways in the Australian context. For example, stakeholder involvement, reduction of casualty rate due to road accidents, fair remuneration to project workforce and improved accessibility to required services.

Practical implications

The context-specific opinions extracted from the industry experts and the comprehensive set of critical indicators identified would ensure that all the vital aspects of social sustainability are considered throughout the life cycle of Australian freeways in the future, assisting the decision-makers in enhancing the project’s social sustainability performance.

Originality/value

The linguistic explanations associated with the ratings given by the industry experts provide greater insight into the context of the life cycle social sustainability assessment of Australian freeways exclusively.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 19 July 2023

Hasith Chathuranga Victar, B.A.K.S. Perera, Asha Dulanjalie Palihakkara and Kaveesha Gihani Dewagod

The construction industry is shifting towards becoming more circular by reducing waste, reusing building materials and embracing regenerative solutions for energy generation and…

Abstract

Purpose

The construction industry is shifting towards becoming more circular by reducing waste, reusing building materials and embracing regenerative solutions for energy generation and biodiversity conservation. Thus, construction professionals must perform diversified services to achieve a circular built environment (CBE). Implementing resource planning and waste management in CBE has already posed challenges to the quantity surveying profession; thus, quantity surveyors (QSs) should be equipped with new roles and competencies to tackle challenges in achieving a CBE. Hence, this study aimed to investigate the functions and competencies of QSs at the design and building material sourcing stages in achieving a CBE according to 3R principles.

Design/methodology/approach

The research apprehended a qualitative approach, including two expert interview rounds adhering to the Delphi technique with 14 and 11 experts per each round. Manual content analysis was incorporated to analyse the collected data.

Findings

The research findings revealed the important roles and competencies of QSs in achieving a CBE. In addition, essential functions and competencies were categorised according to the 3R principles (reduce, reuse, recycle) to successfully implement CBE during the Design and Building Material Sourcing stages. According to the 3R principles of CBE, cost control, cost planning, feasibility studies, measurement and quantification, risk management, value engineering and innovations and technologies were well-received by most interviewees as essential roles of QSs during the Design and Building Material Sourcing stages. Further, basic/mandatory competencies (personal, interpersonal, professional practice and business skills), economic analysis, BIM management, cost management and risk management are highly regarded by experts for QS as important competencies to achieve CBE.

Originality/value

With new construction trends, QSs must enhance their conventional roles and competencies and search for new skills and competencies. Those skills and competencies could be linked to the CE concept, either directly or indirectly. Since QS holds a prominent place in sustainable construction in CBE, adapting to changes in the construction industry such as CBE is timely for QSs. Further, there is a shortage of literature regarding QSs' roles and competencies in achieving a CBE; thus, this study will contribute by identifying new avenues for QSs in achieving a CBE in the practice and the research.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 16 February 2024

Nandini Sharma and Boeing Laishram

Construction industry faces challenges in making objective decisions due to monetary value attached to quality. Among various quality management techniques available, cost of…

Abstract

Purpose

Construction industry faces challenges in making objective decisions due to monetary value attached to quality. Among various quality management techniques available, cost of quality (COQ) is one such method used to address the concern. However, the absence of measurable COQ factors to monitor quality costs hampers the implementation of COQ framework in the construction industry. Therefore, this study aims to identify COQ factors focused on visible factors (VF) and hidden factors (HF) and the current requirements to achieve it.

Design/methodology/approach

This study is based on Preferred Reporting Items for Systematic Review and Meta-Analyses protocol guidelines. The present study identified 57 articles published between 1992 and 2023 in peer-reviewed journals.

Findings

The findings reveal 22 factors, which are grouped into four categories based on COQ. Through systematic review, the authors observed limited methodological and theoretical diversity. In fact, there are no quantitative frameworks to calculate COQ. The study, therefore, developed a framework comprising four major routes/paths of COQ factors within the framework.

Practical implications

The COQ routes developed through this study will enable the practitioners to meticulously categorise VF and HF, facilitating quantifying of quality throughout the lifecycle of project, which is currently absent from the existing quality assurance/quality control (QA/QC) approach. In addition, these COQ routes stand as essential construction strategies, significantly enhancing outcomes related to time, cost, quality, sustainability and fostering closer relationships within project frameworks.

Originality/value

The current study contributes significantly to the existing body of knowledge by developing various COQ routes and proposing future research directions to address gaps in the literature.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 16 January 2024

Nasim Babazadeh, Jochen Teizer, Hans-Joachim Bargstädt and Jürgen Melzner

Construction activities conducted in urban areas are often a source of significant noise disturbances, which cause psychological and health issues for residents as well as…

94

Abstract

Purpose

Construction activities conducted in urban areas are often a source of significant noise disturbances, which cause psychological and health issues for residents as well as long-term auditory impairments for construction workers. The limited effectiveness of passive noise control measures due to the close proximity of the construction site to surrounding neighborhoods often results in complaints and eventually lawsuits. These can then lead to delays and cost overruns for the construction projects.

Design/methodology/approach

The paper proposes a novel approach to integrating construction noise as an additional dimension into scheduling construction works. To achieve this, a building information model, including the three-dimensional construction site layout object geometry, resource allocation and schedule information, is utilized. The developed method explores further project data that are typically available, such as the assigned equipment to a task, its precise location, and the estimated duration of noisy tasks. This results in a noise prediction model by using noise mapping techniques and suggesting less noisy alternative ways of construction. Finally, noise data obtained from sensors in a case study contribute real values for validating the proposed approach, which can be used later to suggest solutions for noise mitigation.

Findings

The results of this study indicate that the proposed approach can accurately predict construction noise given a few available parameters from digital project planning and sensors installed on a construction site. Proactively integrating construction noise control measures into the planning process has benefits for both residents and construction managers, as it reduces construction noise-related disturbances, prevents unexpected legal issues and ensures the health and well-being of the workforce.

Originality/value

While previous research has concentrated on real-time data collection using sensors, a more effective solution would also involve addressing and mitigating construction noise during the pre-construction work planning phase.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 19 December 2022

Emmanuel Chidiebere Eze, Douglas Omoregie Aghimien, Clinton Ohis Aigbavboa and Onyinye Sofolahan

This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a…

Abstract

Purpose

This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a developing country's perspective. This was done with a view to reducing the waste generated in construction projects particularly at the design and pre-contract stages.

Design/methodology/approach

The study adopted a post-positivism philosophical approach, which informed the use of a quantitative research design and a questionnaire as instrument for data collection. The data gathered from construction professionals in the Nigeria construction industry were analysed using an array of statistical tools such as frequency, percentage, Kruskal–Wallis H-test, Kendall's coefficient of concordance, chi-square and exploratory factors analysis.

Findings

The study revealed five major groups of factors causing CW at the design and pre-contract stages that can be avoided or minimised through BIM implementation. These are; (1) errors in design and documentation, (2) specification and quality factors, (3) estimating and site condition factors, (4) planning of work factors and (5) procurement related factors.

Practical implications

The findings of the study offer practical insight for industry participants on the need for BIM implementation to reduce CW by identifying the diverse areas responsible for these waste generation.

Originality/value

While there has been significant literature on BIM implementation, contributions on the effect of this technology in reducing waste generation particular at the design and pre-contract stages in developing countries has been almost non-existent. This study strives to fill in this gap by showcasing the major waste generating activities that can be avoided through the use of BIM.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 September 2023

Stephanie Sheamar, Gayan Wedawatta, Maheshi Tennakoon, Roshani Palliyaguru and Maxwell Fordjour Antwi-Afari

Cost overrun is a significant issue in construction, an undesirable feature the industry has long been associated with. Poor procurement practices are often blamed for subsequent…

Abstract

Purpose

Cost overrun is a significant issue in construction, an undesirable feature the industry has long been associated with. Poor procurement practices are often blamed for subsequent cost overruns in construction, especially with conventional procurement methods leading to outrageous cost overruns. The purpose of this study is to review the features of the new models of construction procurement (NMCP) and assess their potential to reduce cost overruns in construction projects.

Design/methodology/approach

A literature review was conducted to identify the issues of procurement leading to cost escalations. Primary data were obtained through exploratory, semi-structured interviews using a case study approach.

Findings

Clients’ lack of knowledge was highlighted as a key issue in procurement that interlinks with many factors causing cost escalation. The findings suggest that the features contained within the NMCP, such as early contractor involvement and collaboration throughout the project team, have the potential to make a positive contribution to addressing cost escalation in construction.

Research limitations/implications

The primary research was undertaken as an exploratory study and presents the contractor's perspective. Further research is therefore suggested, with multiple organisations representing all key stakeholders in a construction project, including clients, consultants, sub-contractors and suppliers.

Practical implications

The study recommends awareness of the NMCP be raised throughout the industry, and simplified information must be made available to help widen uptake of these contemporary procurement methods.

Originality/value

Addressing the dearth of research concerning the use of NMCP within the industry, this study makes a niche contribution to the body of knowledge on construction cost management by illustrating the potential offered by these new procurement methods for addressing cost escalation. For an industry where collaboration is accepted with reservations, this case study demonstrates how novel collaborative strategies such as open book costing, project bank accounts and shared pain and gain mechanisms can be implemented as part of the procurement strategy and how such strategies can contribute towards minimising the cost escalation inherent in construction projects.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 18 March 2022

Mohammed Sharar, Kofi Agyekum, Patrick Manu, Che Khairil Izam Che Ibrahim, Abdul-Majeed Mahamadu, Maxwell Fordjour Antwi-Afari and Frederick Owusu Danso

Design for safety (DfS), also known as prevention through design (PtD), is a concept that mitigates accidents and hazards through considerations during the design stage of…

Abstract

Purpose

Design for safety (DfS), also known as prevention through design (PtD), is a concept that mitigates accidents and hazards through considerations during the design stage of building projects. The literature provides much information on this concept, but such information is only limited to a few developed countries such as the UK, the USA and Australia. There is limited insight into DfS implementation in the construction industry of several countries, including countries in the Gulf Cooperation Council (GCC) such as Kuwait. Therefore, this study investigates DfS implementation among design professionals in the Kuwait construction industry.

Design/methodology/approach

The study used a questionnaire survey to obtain data from design professionals. The data were analysed using descriptive and inferential statistics (i.e. analysis of variance and t-test).

Findings

The results revealed that DfS awareness among design professionals is very high; there is a very high willingness among design professionals to apply the concept, and design professionals generally view DfS implementation as important. Despite these, the frequency of implementation of DfS practices is generally moderate. In addition, the results revealed that though there is a high interest in DfS training among the design professionals, their actual engagement in training is low. The results also suggest some association between the frequency of engagement in the DfS practices and designers' DfS awareness, training and education. DfS related regulations, industry guidance, formal education and training are considered by design professionals to have the greatest influence on DfS implementation in Kuwait.

Originality/Value

These emerging findings both mirror and contradict aspects of the outcomes of previous DfS studies in other countries. Furthermore, the findings from this study provide insights into a less investigated area regarding work-related health and safety in the GCC region. It offers new and additional information and insights into the current state-of-the-art DfS implementation in the construction industry in Kuwait. In view of the findings, joined-up efforts by government, industry and academia are needed to enhance DfS implementation by design professionals in Kuwait.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 19 February 2024

Ozan Okudan, Gökhan Demirdöğen and Zeynep Işık

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also…

Abstract

Purpose

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also investigates how to select the most convenient infrastructure project for suspension.

Design/methodology/approach

The proposed framework includes an extensive set of factors and a novel comparison mechanism that can reveal the most convenient infrastructure project to be suspended. A comprehensible literature review and focus group discussion (FGD) sessions were conducted to identify factors that should be considered for suspension. Then, the neutrosophic analytic hierarchy process (N-AHP) method was used to determine the relative importance of the factors. Finally, the proposed comparison mechanism was demonstrated through a hypothetical case study and Technique for order of preference by similarity to ideal solution (TOPSIS) analysis.

Findings

Results showed that suspension decisions cannot be made merely based on “financial” factors. Instead, the other aspects, namely “Technical and managerial” and “Social and Environmental”, should also be taken into consideration. Second, factors related to the initial investment, cost of refinancing, cash flow, permits and approvals, insufficiency of bidders, degradation of the components, reputation, impact on stakeholders and criticality of the infrastructure were particularly elaborated as the most significant, needing the utmost attention of the decision-makers. Lastly, the results demonstrated that the proposed comparison mechanism has considerable potential to identify the most convenient infrastructure project for suspension.

Originality/value

Public infrastructure projects are often under pressure due to the inflationary state and economic stagnation of countries after major crises. The suspension decision for infrastructure projects necessitates comprehensible assessments to consider all consequences. Studies have widely investigated the contractual and legal aspects of project suspension in light of existing literature. However, little effort has been devoted to identifying the factors that decision-makers should consider before suspending a particular infrastructure project. Furthermore, existing literature does not investigate how to select the most convenient infrastructure project for suspension either. Thus, by developing a specific suspension framework for infrastructure projects by considering various factors, this study is the earliest attempt to examine the contract suspension mechanism of public infrastructure projects. In this respect, the study significantly contributes to the theory of contract management domain and has important managerial implications.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 January 2024

Srividhya Raju Sridharan, Sagar Malsane and Govinda Shashikant Bhutada

The purpose of the paper is to analyse the sequence of forces acting as barriers in the usage of drones in the construction industry using interpretive structural modelling (ISM)…

Abstract

Purpose

The purpose of the paper is to analyse the sequence of forces acting as barriers in the usage of drones in the construction industry using interpretive structural modelling (ISM). The usage of drones in the construction industry is brought out phase-wise with the help of literature and live cases. Barriers to the usage of drones in construction and steps to derive the interaction between them are described in detail.

Design/methodology/approach

The extraction of barriers to the usage of drones in construction is done through cases and supported by the literature. The identification of the interaction between the barriers is done through multi-criteria decision models, namely, ISM and Matriced Impacts Croises Multiplication Appliquee a un Classement (MICMAC) and the results are presented in the form of a hierarchical structure. The paper highlights the potential for the usage of drones in every phase of construction across three stages of construction and eight different applications.

Findings

The findings on the interaction between barriers show that technical and research and development-related barriers have a higher driving power, ultimately influencing negativity among stakeholders in drone usage for construction. By analysing interrelationships between barriers, management can frame suitable strategies to adopt drone usage in projects. Awareness about the strength of certain barriers can help management take steps to mitigate the same.

Research limitations/implications

By analysing interrelationships between barriers, management can frame suitable strategies to adopt drone usage in projects. A major limitation is a restriction of the study area to the Indian subcontinent. However, the authors believe that the results can be applied across countries where drone technology is at the nascent stage.

Practical implications

Awareness about the strength of certain barriers can help stakeholders take steps to mitigate the same.

Social implications

The results of this research also give some inputs to the government’s drone policy for wider usage of drones in the construction industry.

Originality/value

To the best of the authors’ knowledge, most studies on drones in construction industry bring out a list various challenges to their adoption. In this study, the authors have gone further to perform a hierarchical sequencing of barriers to drone adoption based on challenges faced in an emerging economy like India.