Search results
1 – 10 of over 42000Qian Chen, Bryan T. Adey, Carl Haas and Daniel M. Hall
Building information modelling (BIM) and radio frequency identification (RFID) technologies have been extensively explored to improve supply chain visibility and coordination of…
Abstract
Purpose
Building information modelling (BIM) and radio frequency identification (RFID) technologies have been extensively explored to improve supply chain visibility and coordination of material flow processes, particularly in the pursuit of Industry 4.0. It remains challenging, however, to effectively use these technologies to enable the precise and reliable coordination of material flow processes. This paper aims to propose a new workflow designed to include the use of detailed look-ahead plans when using BIM and RFID technologies, which can accurately track and match both the dynamic site needs and supply status of materials.
Design/methodology/approach
The new workflow is designed according to lean theory and is modeled using business process modeling notation. To digitally support the workflow, an integrated BIM-RFID database system is constructed that links information on material demands with look-ahead plans. The new workflow is then used to manage material flows in the erection of an office building with prefabricated columns. The performance of the new workflow is compared with that of a traditional workflow, using discrete event simulations. The input for the simulations was derived from expert opinion in semi-structured interviews.
Findings
The new workflow enables contractors to better observe on-site status and differences between the actual and planned material requirements, as well as to alert suppliers if necessary. The simulation results indicate that the new workflow has the potential to reduce the duration of the material flow processes by 16.1% compared with the traditional workflow.
Research limitations/implications
The new workflow is illustrated using a real-world-like situation with input data based on expert opinion. Although the workflow shows potential, it should be tested on a real-world site.
Practical implications
The new workflow allows project participants to combine detailed near-term look-ahead plans with BIM and RFID technologies to better manage material flow processes. It is particularly useful for the management of engineer-to-order components considering the dynamic site progress.
Originality/value
The research improves on existing research focused on using BIM and RFID technologies to improve material flow processes by showing how the workflow can be adapted to use detailed look-ahead plans. It reinforces data-driven construction material management practices through improved visibility and reliability in planning and control of material flow processes.
Details
Keywords
Sheila Belayutham, Rabiatul Nurul Akmar Mohamad Jaafar, Herda Balqis Ismail and Che Khairil Izam Che Ibrahim
Megaprojects are typically very expensive public-centred projects that leave little space for any mismanagement or deficient planning, which could affect the project adversely…
Abstract
Purpose
Megaprojects are typically very expensive public-centred projects that leave little space for any mismanagement or deficient planning, which could affect the project adversely. The Last Planner™ System (LPS) is a lean construction planning and control tool that functions to reduce waste and increase performance. Given the benefits, the application of the LPS in megaprojects is still scarce, especially in Malaysia. Hence, this study aims to compare the current production planning, monitoring and review practices in a megaproject with the LPS in order to explore the possibilities of adapting the LPS to the current practices.
Design/methodology/approach
This longitudinal case-based study has first explored the current practices implemented in an infrastructure megaproject, which is an urban rapid transit (URT) project, which was then compared to the standard LPS practices. The case study has adopted several research methods such as observation, interview and document review.
Findings
Findings from the study highlight that the current production planning, monitoring and review practices in the URT project mostly differs from the standard LPS practices with only slight similarities found in the major planning phases. The comparative study, which based on five reference points through master, phase, look-ahead, weekly work plan and measure, and learning has resulted in several key elements, representative of the different planning phases, such as collaborative programming, reverse planning, reliability, dependability and continuous learning.
Practical implications
This study provides an alternative perspective to rail planners, as well as other types of project planners in considering the use of the LPS to enhance the quality of planning, monitoring and review in projects. The framework that highlights the core values and key elements for the related planning phases enables project teams with no lean background to partially adapt their current practices to the LPS with minimal disruption.
Originality/value
This study first contributes to the body of knowledge, where limited study was found comparing and contrasting current production planning practices against the LPS, particularly in rail-based megaproject. The results from the comparison are the key elements representing each of the planning phases that was rooted back to the core values (teamwork, involvement and collaboration, communication and transparency, and continuous improvement) necessary to enhance the current practices.
Details
Keywords
Yannis Georgellis, Paul Joyce and Adrian Woods
Using a sample of some 300 small independent businesses, drawn from Central London, the paper examines how entrepreneurial behaviour affects business performance. It is argued…
Abstract
Using a sample of some 300 small independent businesses, drawn from Central London, the paper examines how entrepreneurial behaviour affects business performance. It is argued that small businesses motivated by a desire to grow in terms of sales and/or employees and to survive in a dynamic and competitive environment need to be innovative. However, to what extent they will innovate successfully depends on their capacity to plan ahead, their capacity to innovate and their willingness to take risk. It is shown that entrepreneurial businesses are characterised by these competencies that allow them to innovate and thus develop and grow successfully. Not surprisingly, not all small businesses are equipped with these three competencies owing to their diverse array of strengths and weaknesses arising from the diversity in the managerial motives and aspirations of entrepreneurship. These results highlight the importance of the capacity to innovate and the capacity to plan ahead as strong predictors of small businesses’ performance.
Details
Keywords
Emmanuel Itodo Daniel, Christine Pasquire, Graham Dickens and Herman Glenn Ballard
The purpose of this paper is to identify how the newly emerging UK practice of “collaborative planning” (CP) for construction project delivery aligns with the advocated principles…
Abstract
Purpose
The purpose of this paper is to identify how the newly emerging UK practice of “collaborative planning” (CP) for construction project delivery aligns with the advocated principles of the global last planner system (LPS) of production planning and control.
Design/methodology/approach
A mixed, qualitative, exploratory approach was adopted for the study. This entailed qualitative data through three techniques, namely: semi-structured interviews, documents analysis, and structured observation. In total, 30 in-depth interviews were conducted over a 12 month period with lean construction consultants, clients, main contractors, and subcontractors drawn from the building, highways and infrastructure and rail sector. In all, 15 projects were visited where practices were observed.
Findings
The study reveals that the current practice of CP in the UK partially aligns with the LPS principles. Where practitioners have heard of the LPS they believe it to be the same practice as CP.
Research limitations/implications
This study is limited to 30 interviews, observation of 15 projects and document analysis. The aim of the study is not to generalise the findings, however, since the study examined top construction companies and practitioners in the UK and the findings were consistent across the sample, some conclusions could be made. The study is also limited to examining the construction phase only, future studies should incorporate the design phase.
Practical implications
A clear identification of the elements of current practice compared to the components of the LPS provides a contribution to the future practice of project production planning and management in the construction industry.
Social implications
The study highlights a continuing resistance to collaboration within the industry. This resistance is subtly embedded within implemented practices even though they are based on collaborative working for their success.
Originality/value
This is among the first studies in the UK that comprehensively examines and reports the application of LPS/CP practice in construction across the major construction sectors. Future studies could build on the findings from this work to develop an approach/methodology to improve the current practice.
Details
Keywords
Moslem Sheikhkhoshkar, Hind Bril El Haouzi, Alexis Aubry and Farook Hamzeh
In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control…
Abstract
Purpose
In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control metrics have been devised and put into practice, often with little emphasis on analyzing their underlying concepts. To cover this gap, this research aims to identify and analyze a holistic list of control metrics and their functionalities in the construction industry.
Design/methodology/approach
A multi-step analytical approach was conducted to achieve the study’s objectives. First, a holistic list of control metrics and their functionalities in the construction industry was identified. Second, a quantitative analysis based on social network analysis (SNA) was implemented to discover the most important functionalities.
Findings
The results revealed that the most important control metrics' functionalities (CMF) could differ depending on the type of metrics (lagging and leading) and levels of control. However, in general, the most significant functionalities include managing project progress and performance, evaluating the look-ahead level’s performance, measuring the reliability and stability of workflow, measuring the make-ready process, constraint management and measuring the quality of construction flow.
Originality/value
This research will assist the project team in getting a comprehensive sensemaking of planning and control systems and their functionalities to plan and control different dynamic aspects of the project.
Details
Keywords
Bassam A. Tayeh, Khalid Al Hallaq, Hafiz Zahoor and Abdulla H. Al Faqawi
The purpose of this paper is to prioritize the vital tools/techniques for the effective implementation of the last planner system (LPS) in the cross-cultural setting of a…
Abstract
Purpose
The purpose of this paper is to prioritize the vital tools/techniques for the effective implementation of the last planner system (LPS) in the cross-cultural setting of a developing country, i.e. Gaza Strip. Besides, the potential benefits of implementing LPS are prioritized.
Design/methodology/approach
The significant techniques and likely benefits of LPS implementations were identified through comprehensive literature, followed by their verification through a pilot study. The quantitative data were collected using a questionnaire survey from 89 companies, operating in the Gaza Strip construction industry. The relative important index was calculated for prioritizing the significant tools/techniques (16) which support the effective LPS implementation, and highlighting the potential benefits (10) achieved through LPS implementation.
Findings
The results showed that the “use of visual devices to spread information in the construction site,” “attendance of key actors” and “look ahead plan” are the most important tools/techniques supporting LPS implementation. The top three potential benefits of implementing LPS include: “allows a better understanding of the program control,” “maximizes the co-operation and confidence among team members” and “allows the manager to better visualize the work program.” To prevent any waste in project time and to ensure the material supply and continuity of works, the study recommends advance supply and storage of demand materials, and early availability of the shop-drawings for acceptance by the superintendent.
Practical implications
The study’s findings are expected to guide the key construction stakeholders to prioritize their energies toward effective LPS implementation in the Gaza Strip.
Originality/value
Though this study pertains to Palestine, its methodology can be generalized in other countries and regions, having a similar work environment, after making necessary cultural adjustments.
Details
Keywords
– The purpose of this paper is to make the case for strategic workforce planning and to outline the key steps involved.
Abstract
Purpose
The purpose of this paper is to make the case for strategic workforce planning and to outline the key steps involved.
Design/methodology/approach
The paper begins with a discussion of the cost of redundancies to the economy and argues that much of this could have been reduced with better planning. It goes on to describe the key steps in workforce planning. It looks at practical ways to assess demand and replacement needs and utilise productivity ratios to convert delivery units into human resource requirements. It concludes with a discussion on the supply of resource and examples of actions that can be taken proactively to close foreseen gaps.
Originality/value
This paper is based on methodologies developed by the author and applied in practice.
Details
Keywords
– The purpose of this paper is to examine the system of development controls in the Offinso South municipality. It investigates the challenges to the development control regime.
Abstract
Purpose
The purpose of this paper is to examine the system of development controls in the Offinso South municipality. It investigates the challenges to the development control regime.
Design/methodology/approach
The paper reviews the land use regulation system in the municipality. The municipality was clustered into four for data collection. Eight neighbourhoods (two from each cluster) were selected from the municipality for the study. In all, 15 properties were sampled via purposive sampling techniques from each of the selected neighbourhoods for data gathering. Self-administered questionnaires were relied on to gather data from the 120 respondents. The property owners were the unit of enquiry.
Findings
The paper finds that socio-cultural factors, delays in the planning approval process, negative public perceptions about the planning process and planning officials, lack of official support to developers in curing identified defects in their proposed developments, and unrealistic building regulations are partly responsible for the large-scale violations of development controls in the municipality.
Practical implications
It is noted that the planning authority should focus more on strategies that will facilitate voluntary compliance and less on enforcement. It also notes the need for a review of the building regulations and the purging of the planning system from negative public perceptions and processing delays.
Originality/value
The paper identifies the constraints on the Ghanaian development controls regime.
Details