Search results

1 – 10 of over 2000
Open Access
Article
Publication date: 13 June 2022

Julie Krogh Agergaard, Kristoffer Vandrup Sigsgaard, Niels Henrik Mortensen, Jingrui Ge and Kasper Barslund Hansen

The purpose of this paper is to investigate the impact of early-stage maintenance clustering. Few researchers have previously studied early-stage maintenance clustering…

Abstract

Purpose

The purpose of this paper is to investigate the impact of early-stage maintenance clustering. Few researchers have previously studied early-stage maintenance clustering. Experience from product and service development has shown that early stages are critical to the development process, as most decisions are made during these stages. Similarly, most maintenance decisions are made during the early stages of maintenance development. Developing maintenance for clustering is expected to increase the potential of clustering.

Design/methodology/approach

A literature study and three case studies using the same data set were performed. The case studies simulate three stages of maintenance development by clustering based on the changes available at each given stage.

Findings

The study indicates an increased impact of maintenance clustering when clustering already in the first maintenance development stage. By performing clustering during the identification phase, 4.6% of the planned work hours can be saved. When clustering is done in the planning phase, 2.7% of the planned work hours can be saved. When planning is done in the scheduling phase, 2.4% of the planned work hours can be saved. The major difference in potential from the identification to the scheduling phase came from avoiding duplicate, unnecessary and erroneous work.

Originality/value

The findings from this study indicate a need for more studies on early-stage maintenance clustering, as few others have studied this.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 26 May 2023

Mpho Trinity Manenzhe, Arnesh Telukdarie and Megashnee Munsamy

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

1705

Abstract

Purpose

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

Design/methodology/approach

The extant literature in physical assets maintenance depicts that poor maintenance management is predominantly because of a lack of a clearly defined maintenance work management process model, resulting in poor management of maintenance work. This paper solves this complex phenomenon using a combination of conceptual process modeling and system dynamics simulation incorporating 4IR technologies. A process for maintenance work management and its control actions on scheduled maintenance tasks versus unscheduled maintenance tasks is modeled, replicating real-world scenarios with a digital lens (4IR technologies) for predictive maintenance strategy.

Findings

A process for maintenance work management is thus modeled and simulated as a dynamic system. Post-model validation, this study reveals that the real-world maintenance work management process can be replicated using system dynamics modeling. The impact analysis of 4IR technologies on maintenance work management systems reveals that the implementation of 4IR technologies intensifies asset performance with an overall gain of 27.46%, yielding the best maintenance index. This study further reveals that the benefits of 4IR technologies positively impact equipment defect predictability before failure, thereby yielding a predictive maintenance strategy.

Research limitations/implications

The study focused on maintenance work management system without the consideration of other subsystems such as cost of maintenance, production dynamics, and supply chain management.

Practical implications

The maintenance real-world quantitative data is retrieved from two maintenance departments from company A, for a period of 24 months, representing years 2017 and 2018. The maintenance quantitative data retrieved represent six various types of equipment used at underground Mines. The maintenance management qualitative data (Organizational documents) in maintenance management are retrieved from company A and company B. Company A is a global mining industry, and company B is a global manufacturing industry. The reliability of the data used in the model validation have practical implications on how maintenance work management system behaves with the benefit of 4IR technologies' implementation.

Social implications

This research study yields an overall benefit in asset management, thereby intensifying asset performance. The expected learnings are intended to benefit future research in the physical asset management field of study and most important to the industry practitioners in physical asset management.

Originality/value

This paper provides for a model in which maintenance work and its dynamics is systematically managed. Uncontrollable corrective maintenance work increases the complexity of the overall maintenance work management. The use of a system dynamic model and simulation incorporating 4IR technologies adds value on the maintenance work management effectiveness.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 14 December 2023

Maren Hinrichs, Loina Prifti and Stefan Schneegass

With production systems become more digitized, data-driven maintenance decisions can improve the performance of production systems. While manufacturers are introducing predictive…

Abstract

Purpose

With production systems become more digitized, data-driven maintenance decisions can improve the performance of production systems. While manufacturers are introducing predictive maintenance and maintenance reporting to increase maintenance operation efficiency, operational data may also be used to improve maintenance management. Research on the value of data-driven decision support to foster increased internal integration of maintenance with related functions is less explored. This paper explores the potential for further development of solutions for cross-functional responsibilities that maintenance shares with production and logistics through data-driven approaches.

Design/methodology/approach

Fifteen maintenance experts were interviewed in semi-structured interviews. The interview questions were derived based on topics identified through a structured literature analysis of 126 papers.

Findings

The main findings show that data-driven decision-making can support maintenance, asset, production and material planning to coordinate and collaborate on cross-functional responsibilities. While solutions for maintenance planning and scheduling have been explored for various operational conditions, collaborative solutions for maintenance, production and logistics offer the potential for further development. Enablers for data-driven collaboration are the internal synchronization and central definition of goals, harmonization of information systems and information visualization for decision-making.

Originality/value

This paper outlines future research directions for data-driven decision-making in maintenance management as well as the practical requirements for implementation.

Details

Journal of Quality in Maintenance Engineering, vol. 30 no. 1
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 21 September 2023

Renan Favarão da Silva and Gilberto Francisco Martha de Souza

The Maintenance Management Framework for Asset Management (MMFAM) is a recently modeled framework to ensure the alignment of maintenance management with physical asset management…

Abstract

Purpose

The Maintenance Management Framework for Asset Management (MMFAM) is a recently modeled framework to ensure the alignment of maintenance management with physical asset management based on the ISO 55000 series for asset management. In this context, the purpose of this paper is to discuss the applicability of the MMFAM considering the operational context of a hydroelectric power plant.

Design/methodology/approach

The paper adopted the case study method for the discussion of the applicability of the MMFAM to a real operational context. A hydroelectric power plant was chosen as the scope of the case study due to its relevance since the electricity sector is an example of an asset-intensive industry in which asset management performance is fundamental. To gain a detailed understanding of the organization, data were collected through direct requests to the plant, informal meetings with technical collaborators, a technical visit to the hydroelectric plant and on-site data collection. Then, the MMFAM processes were demonstrated based on this information and the results supported the discussion of the MMFAM applicability.

Findings

The case study provided a deeper understanding of the processes included in the MMFAM. In addition, the results suggested the applicability of the framework to other organizations besides the hydroelectric sector due to its generic approach and the possibility of choosing appropriate tools to support and implement the MMFAM processes.

Practical implications

The case study is expected to contribute to the practical understanding of the MMFAM processes within an operational context and assist maintenance professionals and researchers in their implementation in other organizations.

Originality/value

Although the literature provides different maintenance management frameworks, their practical discussion based on a real operational context is still a gap. Accordingly, this paper discusses the MMFAM under a case study method to expand its understanding beyond theory and contribute to practical comprehension in depth.

Details

Journal of Quality in Maintenance Engineering, vol. 30 no. 1
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 25 December 2023

Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…

Abstract

Purpose

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.

Design/methodology/approach

Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.

Findings

Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.

Practical implications

The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.

Originality/value

To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 13 February 2024

José Nogueira da Mata Filho, Antonio Celio Pereira de Mesquita, Fernando Teixeira Mendes Abrahão and Guilherme C. Rocha

This paper aims to explore the optimization process involved in the aircraft maintenance allocation and packing problem. The aircraft industry misses a part of the optimization…

Abstract

Purpose

This paper aims to explore the optimization process involved in the aircraft maintenance allocation and packing problem. The aircraft industry misses a part of the optimization potential while developing maintenance plans. This research provides the modeling foundation for the missing part considering the failure behavior of components, costs involved with all maintenance tasks and opportunity costs.

Design/methodology/approach

The study models the cost-effectiveness of support against the availability to come up with an optimization problem. The mathematical problem was solved with an exact algorithm. Experiments were performed with real field and synthetically generated data, to validate the correctness of the model and its potential to provide more accurate and better engineered maintenance plans.

Findings

The solution procedure provided excellent results by enhancing the overall arrangement of the tasks, resulting in higher availability rates and a substantial decrease in total maintenance costs. In terms of situational awareness, it provides the user with the flexibility to better manage resource constraints while still achieving optimal results.

Originality/value

This is an innovative research providing a state-of-the-art mathematical model and an algorithm for efficiently solving a task allocation and packing problem by incorporating components’ due flight time, failure probability, task relationships, smart allocation of common preparation tasks, operational profile and resource limitations.

Details

Journal of Quality in Maintenance Engineering, vol. 30 no. 1
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 20 July 2023

Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Mohd Isa Rohayati and Nor Malina Malek

Inadequate strategic planning and maintenance budget may undermine the maintenance of the Higher Education Institution Building (HEIB). Studies have shown that a customised…

Abstract

Purpose

Inadequate strategic planning and maintenance budget may undermine the maintenance of the Higher Education Institution Building (HEIB). Studies have shown that a customised maintenance concept such as Soft System Methodology (SSM) can improve public building maintenance operations. There is a paucity of studies regarding public HEIB maintenance in Nigeria via an SSM approach. Therefore, the research investigated the state of public HEIB and developed a framework to improve public HEIB maintenance practices in Nigeria.

Design/methodology/approach

The research adopted SSM to understand Nigeria’s public HEIB maintenance practices. The SSM permitted a substitute approach to improve public HEIB maintenance practices via a developed framework. Data were collated via virtual interviews with experts, and findings were presented in line with the SSM seven steps.

Findings

Findings show that besides the shoddy state of public HEIB maintenance, there is no public digitalised HEIB framework to improve maintenance practices across Nigeria’s higher education institutions. The study developed a digitalised framework with the support of Computerised Maintenance Management System from the findings. It would reposition the public HEIB and stir up various agencies/departments/units managing maintenance for better service delivery via integrated delivery, practical, methodological and managerial aspects.

Originality/value

The research investigated Nigeria’s public HEIB maintenance practices via SSM to identify the required document and propose a feasible framework to improve Nigeria’s HEIB maintenance practices. Besides the developed conceptual framework, Nigeria’s HEIB maintenance practitioners and higher institution chief executives can use the recommended framework as guidelines to improve HEIB maintenance practices.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 13 February 2023

Kirstin Scholten, Dirk Pieter van Donk, Damien Power and Stephanie Braeuer

To be able to continuously provide affordable services to consumers, managers of critical infrastructure (CI) maintenance supply networks have to balance investments in resilience…

2692

Abstract

Purpose

To be able to continuously provide affordable services to consumers, managers of critical infrastructure (CI) maintenance supply networks have to balance investments in resilience with costs. At the same time, CI providers need to consider factors that influence resilience such as the geographical spread or the location of the network. This study aims to contextualize supply chain resilience knowledge by exploring how maintenance resource configurations impact resilience and costs in CI supply networks.

Design/methodology/approach

An in-depth longitudinal single case study of a representative CI provider that has centralized its maintenance supply network is used. Data were collected before and after the change to evaluate the effect of the changes on the maintenance supply network.

Findings

This study shows that in this specific CI maintenance context, structural resource choices such as the quantity or location of spare parts and tools, the creation and exploitation of tacit knowledge and staff motivation impact both resilience and costs due to geographical spread, network location and other network properties.

Originality/value

This study extends general supply chain resilience knowledge to a new setting (i.e. CI) and shows how existing insights apply in this context. More specifically, it is shown that even in engineered supply networks there is a need to consider the effect of human agency on resilience as the creation and exploitation of tacit knowledge are of immense importance in managing the network. In addition, the relationship between normal accidents theory and high reliability theory (HRT) is revisited as findings indicate that HRT is also important after a disruption has taken place.

Details

Supply Chain Management: An International Journal, vol. 28 no. 7
Type: Research Article
ISSN: 1359-8546

Keywords

Article
Publication date: 14 December 2022

Bryan Pieterse, Kofi Agyekum, Patrick Manu, Saeed Reza Mohandes, Clara Cheung and Akilu Yunusa-Kaltungo

Major maintenance projects are often regarded as maintenance activities regardless of the projects' complexity and scale. Consequently, very scarce research attention has hitherto…

Abstract

Purpose

Major maintenance projects are often regarded as maintenance activities regardless of the projects' complexity and scale. Consequently, very scarce research attention has hitherto been paid to the critical skills required when undertaking these projects. More specifically, the body of relevant knowledge is deprived of a study focusing on maintenance projects within the energy sector. In view of this shortcoming, this research aims to examine the critical project management (PM) skills required to deliver major maintenance projects within the energy sector.

Design/methodology/approach

Based on a quantitative research strategy, this study addressed the knowledge gap through a cross-sectional survey of professionals involved in the delivery of major maintenance projects in the United Kingdom's (UK) energy sector. Data obtained were analyzed via descriptive (e.g. frequencies, mean and standard deviation [SD]) and inferential statistical analyses (One sample t-test and exploratory factor analysis (EFA)).

Findings

Out of the 45 PM skills identified in the literature and examined by the respondents, the results obtained from the One sample t-test (based on p (1-tailed) = 0.05) showed that 37 were considered to be at least “important,” accounting for 80.4% of all the skills identified. EFA revealed a clustering of the PM skills items into seven components: “skills related to work scheduling and coordination”; “communication, risk, safety and stakeholder management skills”; “quality assurance skills”; “people management skills”; “skills related to forecasting scope and duration of outage”; “implementation of processes and time management skills” and “technical/engineering skills and experience pertaining to the outage and local site knowledge.”

Originality/value

This study has identified and contributed to the limited state-of-the-art skills project managers must possess to manage major maintenance projects in the energy sector successfully. The findings would be useful to organizations within the energy sector in ensuring that the organizations have suitable personnel in place to deliver major maintenance projects on the organizations' assets.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 December 2023

Zul-Atfi Ismail

Operation and maintenance (O&M) processes projects such as identification, assessment, planning and execution, embody a variety of standards such as technical (method of…

Abstract

Purpose

Operation and maintenance (O&M) processes projects such as identification, assessment, planning and execution, embody a variety of standards such as technical (method of statement), environmental, economic (campus development) and social (health and wellbeing). Because these standards have proven to be challenging to integrate, local governments are increasingly experimenting with social innovation (SI) as a bottom-up form of standard integration. This study aims to apply the concept of SI to the O&M processes of facilities management at polytechnics in Malaysia to identify problems with conventional working practices in this area and to recommend potential solutions.

Design/methodology/approach

The paper reviews evidence that conventional working methods generate significant problems related to paper-based forms, improper database management and flawed decision-making processes. Because of the lack knowledge about different ways of how standard integration is achieved, the comparison of three polytechnic institutions which are Rensselaer Polytechnic Institute (RPI) and Southern Polytechnic College of Engineering and Engineering Technology (SPCEET) in USA as well as Seberang Perai Polytechnic, Pulau Pinang (PSP) in Malaysia shares the ambition to realise standard integration of O&M through SI.

Findings

The findings reveal that SI leads to four ways of standard integration: computerised maintenance management system, online customer complaint, electronic form and relational database. Application of the concept of SI reveals the need for more sophisticated management solutions in the O&M processes of facilities management.

Originality/value

These standard integration arrangements unfortunately seem to mainly contribute to greater alignment between standard rather than true standard integration. The concept of SI will guide future improvements and developments in maintenance management systems to fulfil requirements in this area.

Details

Journal of Global Responsibility, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2041-2568

Keywords

1 – 10 of over 2000