Search results

1 – 10 of over 4000
Open Access
Article
Publication date: 14 December 2018

Jeroen van Strien, Cees Johannes Gelderman and Janjaap Semeijn

Performance-based contracting (PBC) plays an increasingly important role in the defense industry. This paper aims to investigate factors that influence service provider’s…

4656

Abstract

Purpose

Performance-based contracting (PBC) plays an increasingly important role in the defense industry. This paper aims to investigate factors that influence service provider’s willingness to accept PBC-induced risks. It also shows how these risks could be managed in a military service supply chain.

Design/methodology/approach

The case study focused on the relationship between a service provider and a customer that acted on behalf of other users in the defense sector. The contract involved the sustainment of a military engine in a complex supply chain.

Findings

The service provider’s performance attributability appeared to have a strong impact on its willingness to take PBC-induced risks. For the parts where the service provider did not have full control over the service performance, exclusions and Service Level Agreements (SLAs) were used to manage and mitigate the risks associated with uncontrolled performance. The service provider’s willingness to accept PBC-induced risks was also affected by its ability to make accurate forecasts, the applied growth path and the length of the contract.

Research limitations/implications

This case has specific characteristics, unique by time (maturity of the technical system and supply chain) and place (market). It is recommended that results are tested in other research settings.

Practical implications

Organizations should be aware of the factors that influence a service provider’s willingness to bear PBC-induced risks. Customers should limit PBC to those parts of a contract where risks are of an acceptable level. Also, it is recommended to follow a phased growth path when it is not possible to make accurate forecasts in a PBC context.

Originality/value

This study is the first to address critical issues concerning the identification and management of risks under PBC in the defense industry.

Details

Journal of Defense Analytics and Logistics, vol. 3 no. 1
Type: Research Article
ISSN: 2399-6439

Keywords

Open Access
Article
Publication date: 27 April 2020

Murat Gunduz and Hesham Ahmed Elsherbeny

This paper covers the development of a multidimensional contract administration performance model (CAPM) for construction projects. The proposed CAPM is intended to be used by the…

14226

Abstract

Purpose

This paper covers the development of a multidimensional contract administration performance model (CAPM) for construction projects. The proposed CAPM is intended to be used by the industry stakeholders to measure the construction contract administration (CCA) performance and identify the strengths and weaknesses of the CCA system for running or completed projects.

Design/methodology/approach

The research design follows a sequential mixed methodology of qualitative and quantitative data collection and analysis. In the first phase, contract administration indicators were collected from relevant literature. In the second phase, an online questionnaire was prepared, and data were collected and analyzed using the crisp value of fuzzy membership function, and structural equation modeling (SEM). The fuzzy set was chosen for this study due to the presence of uncertainty and fuzziness associated with the importance of several key indicators affecting the CCA performance. Finally, SEM was used to test and analyze interrelationships among constructs of CCA performance.

Findings

The data collected from 336 construction professionals worldwide through an online survey was utilized to develop the fuzzy structural equation model. The goodness-of-fit and reliability tests validated the model. The study concluded a significant correlation between CCA performance, CCA operational indicators, and the process groups.

Originality/value

The contribution of this paper to the existing knowledge is the development of a fuzzy structural equation model that serves as a measurement tool for the contract administration performance. This is the first quantitative structural equation model to capture contract administration performance. The model consists of 93 Construction Contract Administration(CCA) performance indicators categorized into 11 project management process groups namely: project governance and start-up; team management; communication and relationship management; quality and acceptance management; performance monitoring and reporting management; document and record management; financial management; changes and control management; claims and dispute resolution management; contract risk management and contract closeout management.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 28 March 2019

Wenting Zou, Saara A. Brax, Mervi Vuori and Risto Rajala

To build a more comprehensive understanding of factors affecting the success of service contracting, the purpose of this paper is to investigate the influences of service…

6943

Abstract

Purpose

To build a more comprehensive understanding of factors affecting the success of service contracting, the purpose of this paper is to investigate the influences of service complexity, contract structure and contracting process on the buyer-perceived supplier performance in business-to-business (B2B) services.

Design/methodology/approach

A research model is developed based on transaction cost economics and the research on service contracting. The model is tested by the survey data collected. Professional focus groups on LinkedIn are used to generate the list of potential respondents. The sample consists of 177 purchasing professionals from 25 countries.

Findings

The results indicate that three major contract dimensions and follow-up management practices positively influence buyer-perceived supplier performance. Furthermore, service complexity amplifies the effects of incentives designed in the contract and the buyer’s follow-up contract management on perceived supplier performance.

Research limitations/implications

The sample consists of respondents from 25 countries and provides good geographic coverage. However, the results should be generalized with caution because not all countries were represented equally.

Practical implications

The study suggests a framework and guidelines for purchasing managers to improve the design and management of service contracts to secure good performance from their supplier.

Originality/value

This paper contributes to understanding the performance-enhancing aspects of designing and monitoring service contracts in B2B contexts. It also adds to the knowledge of the role of service complexity in successful B2B service purchasing.

Details

International Journal of Operations & Production Management, vol. 39 no. 4
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 6 January 2023

Ismail Abdi Changalima, Alban Dismas Mchopa and Ismail Juma Ismail

This study aims to examine the effect of supplier monitoring on procurement performance in the Tanzanian public sector, as well as how contract management difficulty moderates the…

2062

Abstract

Purpose

This study aims to examine the effect of supplier monitoring on procurement performance in the Tanzanian public sector, as well as how contract management difficulty moderates the effect of supplier monitoring on procurement performance.

Design/methodology/approach

In this paper cross-sectional data were collected from 179 Tanzanian public procuring organizations using a structured survey questionnaire. Confirmatory factor analysis (CFA) and the PROCESS macro were used to analyse the collected data.

Findings

Supplier monitoring has a positive and significant relationship with procurement performance in terms of cost reduction, lead times and buyer satisfaction. Furthermore, contract management difficulty has a negative moderating effect on the relationships between supplier monitoring and procurement performance dimensions.

Research limitations/implications

Because public procurement is governed by laws and procedures, generalization of results should be done with caution. This is because the study is currently limited to Tanzanian public procurement. Apart from contract management difficulty, future research can look at other factors that may be needed to moderate the link between supplier monitoring and procurement performance.

Practical implications

Procurement practitioners must monitor major suppliers’ timeliness, product quality and order accuracy in order to improve procurement performance. Furthermore, proper contract management is required, which necessitates effectively reinforcing procurement contract managers’ responsibilities and providing contract management training for practitioners in order to control anomalies when suppliers and contracts are involved.

Originality/value

By adding a moderating variable, the study adds to the literature on supplier monitoring in public procurement and the on-going debate on supplier monitoring and performance.

Details

IIM Ranchi Journal of Management Studies, vol. 2 no. 1
Type: Research Article
ISSN: 2754-0138

Keywords

Content available
Article
Publication date: 3 April 2018

Karen A.F. Landale, Aruna Apte, Rene G. Rendon and Javier Salmerón

The purpose of this paper is to show how data analytics can be used to identify areas of potential cost savings for category managers of installation-level services. Using…

4503

Abstract

Purpose

The purpose of this paper is to show how data analytics can be used to identify areas of potential cost savings for category managers of installation-level services. Using integrated solid waste management (ISWM) as a test case, the authors also examine the impact of small business set-asides on price and contractor performance.

Design/methodology/approach

The authors use data analytics, specifically sequential regression, the Wilcoxon rank-sum test and ordered logistic regression to investigate the influence of service- and contracting-related variables on price and contractor performance.

Findings

The authors find that service- and contracting-related variables influence price. Specifically, they identify that a service-related variable, number of containers, significantly affects price, and that two contracting-related variables, one type of small business set-aside and the number of offers received, also significantly affect price. The authors quantify the price premiums paid for using various types of small business set-asides.

Research limitations/implications

Although the findings were significant, the authors believe that the robustness of the conclusions could be enhanced if the Air Force captured more data. Additional observations would increase the generalizability of the results.

Practical implications

This empirical experiment demonstrates that detailed analyses are required to gain insights into services’ price drivers to craft more appropriate category management strategies for installation-level services.

Originality/value

This empirical study shows how historical data can be used to assess price drivers of installation-level services. It is also one of the first to quantify the impact that small business set-asides have on price.

Details

Journal of Defense Analytics and Logistics, vol. 1 no. 2
Type: Research Article
ISSN: 2399-6439

Keywords

Content available
Article
Publication date: 4 October 2018

Denis S. Clayson, Alfred E. Thal, Jr and Edward D. White III

The purpose of this study was to investigate the stability of the cost performance index (CPI) for environmental remediation projects as the topic is not addressed in the…

1003

Abstract

Purpose

The purpose of this study was to investigate the stability of the cost performance index (CPI) for environmental remediation projects as the topic is not addressed in the literature. CPI is defined as the earned value of work performed divided by the actual cost of the work, and CPI stability represents the point in time in a project after which the CPI varies by less than 20 percent (measured in different ways).

Design/methodology/approach

After collecting monthly earned value management (EVM) data for 136 environmental remediation projects from a United States federal agency in fiscal years 2012 and 2013, the authors used the nonparametric Wilcoxon signed-rank test to analyze CPI stability. The authors also used nonparametric statistical comparisons to identify any significant relationships between CPI stability and independent variables representing project and contract characteristics.

Findings

The CPI for environmental projects did not stabilize until the projects were 41 percent complete with respect to project duration. The most significant factors contributing to CPI stability were categorized into the following managerial insights: contractor qualifications, communication, stakeholder engagement, contracting strategy, competition, EVM factors, and macro project factors.

Originality/value

As CPI stability for environmental remediation projects has not been reported in the literature, this research provides new insights to help project managers understand when the CPIs of environmental remediation projects stabilize and which factors have the most impact on CPI stability.

Details

Journal of Defense Analytics and Logistics, vol. 2 no. 2
Type: Research Article
ISSN: 2399-6439

Keywords

Open Access
Article
Publication date: 4 July 2022

Shiyu Wan, Yisheng Liu, Grace Ding, Goran Runeson and Michael Er

This article aims to establish a dynamic Energy Performance Contract (EPC) risk allocation model for commercial buildings based on the theory of Incomplete Contract. The purpose…

1530

Abstract

Purpose

This article aims to establish a dynamic Energy Performance Contract (EPC) risk allocation model for commercial buildings based on the theory of Incomplete Contract. The purpose is to fill the policy vacuum and allow stakeholders to manage risks in energy conservation management by EPCs to better adapt to climate change in the building sector.

Design/methodology/approach

The article chooses a qualitative research approach to depict the whole risk allocation picture of EPC projects and establish a dynamic EPC risk allocation model for commercial buildings in China. It starts with a comprehensive literature review on risks of EPCs. By modifying the theory of Incomplete Contract and adopting the so-called bow-tie model, a theoretical EPC risk allocation model is developed and verified by interview results. By discussing its application in the commercial building sector in China, an operational EPC three-stage risk allocation model is developed.

Findings

This study points out the contract incompleteness of the risk allocation for EPC projects and offered an operational method to guide practice. The reasonable risk allocation between building owners and Energy Service Companies can realize their bilateral targets on commercial building energy-saving benefits, which makes EPC more attractive for energy conservation.

Originality/value

Existing research focused mainly on static risk allocation. Less research was directed to the phased and dynamic risk allocation. This study developed a theoretical three-stage EPC risk allocation model, which provided the theoretical support for dynamic EPC risk allocation of EPC projects. By addressing the contract incompleteness of the risk allocation, an operational method is developed. This is a new approach to allocate risks for EPC projects in a dynamic and staged way.

Details

International Journal of Climate Change Strategies and Management, vol. 15 no. 4
Type: Research Article
ISSN: 1756-8692

Keywords

Open Access
Article
Publication date: 5 December 2019

Timo Gossler, Ioanna Falagara Sigala, Tina Wakolbinger and Renate Buber

The purpose of this paper is to determine best practices of aid agencies for outsourcing logistics to commercial logistics service providers (LSPs) in disaster relief. Moreover…

6239

Abstract

Purpose

The purpose of this paper is to determine best practices of aid agencies for outsourcing logistics to commercial logistics service providers (LSPs) in disaster relief. Moreover, it evaluates the application of the Delphi method for research in humanitarian logistics.

Design/methodology/approach

The paper is based on a two-round Delphi study with 31 experts from aid agencies and a complementary full-day focus group with 12 experts from aid agencies and LSPs.

Findings

The study revealed 12 best practices for outsourcing logistics in disaster relief and a compilation of more than 100 activities for putting these practices into action. Experts consider a proper balance between efficiency and compliance, a detailed contract and a detailed service request most important. Additionally, the Delphi method was found to be a promising technique for research on humanitarian logistics.

Research limitations/implications

By critically examining the Delphi method, this study establishes the basis for a wider application of the technique in the field of humanitarian logistics. Furthermore, it can help to prioritize future research as the ranking of practices reflects the priorities of practitioners.

Practical implications

The paper provides guidance to practitioners at aid agencies in charge of outsourcing logistics.

Originality/value

This research is one of the first in the field of humanitarian logistics to apply the Delphi method. Moreover, it addresses the lack of literature dealing with approaches for building successful cross-sectoral partnerships.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 9 no. 3
Type: Research Article
ISSN: 2042-6747

Keywords

Open Access
Article
Publication date: 21 February 2018

Manda Broekhuis and Kirstin Scholten

The purpose of this paper is to investigate purchasing practices in service triads by exploring the link between ex ante contracting and ex post contract management and how these…

5480

Abstract

Purpose

The purpose of this paper is to investigate purchasing practices in service triads by exploring the link between ex ante contracting and ex post contract management and how these practices influence the satisfaction of buyers and suppliers (in concessionary arrangements) with their relationship in terms of meeting the needs of the buyer’s customers.

Design/methodology/approach

An in-depth exploratory multiple case study was carried out in a shop-in-shop context. Multi-method and multi-source data collection included interviews, documents and the contracts between buyer and supplier, providing evidence of the formal and relational structures in both the contracting and contract management stages.

Findings

The case findings provide evidence that behavioural standards established in a social contract are important prerequisites for the establishment and subsequent management of a formal contract. Second, this study shows that, when outsourcing core services in a service triad, a combination of performance-oriented and behavioural-oriented contract terms, covering a mix of topics related to both the customer-experience and to buyer-supplier-oriented aspects, contribute to aligning the buyer’s, suppliers’ and customers’ interests. The main findings are presented in a causal model and formulated as propositions.

Originality/value

This paper is one of the first studies to explore how core services are outsourced in a service triad. It provides evidence that the social contract between buyer and supplier influences the establishment of the formal contract as well as contract management, and a mix of contract topics, some related to the customers’ experience and others purely buyer-supplier oriented, contribute to the alignment of buyer’s, suppliers’ and customers’ interests.

Details

International Journal of Operations & Production Management, vol. 38 no. 5
Type: Research Article
ISSN: 0144-3577

Keywords

Content available
Article
Publication date: 10 June 2021

Muhammad Sami Ur Rehman, Muhammad Tariq Shafiq and Muneeb Afzal

The coronavirus disease 2019 (COVID-19) pandemic has affected the global economy and, thus, the global construction industry. This paper aims to study the impact of COVID-19 on…

4045

Abstract

Purpose

The coronavirus disease 2019 (COVID-19) pandemic has affected the global economy and, thus, the global construction industry. This paper aims to study the impact of COVID-19 on construction project performance in the United Arab Emirates (UAE).

Design/methodology/approach

This study adopted a qualitative and exploratory approach to investigate the impact of COVID-19 and its policies on project performance in the UAE construction industry in critical areas of the project management body of knowledge (e.g. schedule, cost, resources and contracts). Semi-structured interview questions were asked from ten construction professional to obtain valuable insights into the pandemic’s effects on the UAE construction industry and the effectiveness of policies implemented to rectify the damage and identify the industry’s new normal.

Findings

The findings indicate that the construction industry faced several challenges such as schedule delays, disrupted cashflows, delayed permits, approvals and inspections, travel restrictions, serious health and safety concerns, material and equipment shortages, among others which hindered the timely delivery of construction projects. It also indicates that efforts made by the government institutions and the construction industry of the UAE such as economic support programs, digitization of processes, fee and fine waivers, health facilities, among other statutory relaxations proved effective in supporting the construction industry against the adverse effects of the pandemic.

Research limitations/implications

The research findings are limited to the literature review and ten semi-structured interviews seeking an expert’s opinion from industry professionals working in the UAE construction industry. The research team did not get access to project documents, contracts and project progress reports which may be required to validate the interview findings, and to perform an in-depth analysis quantifying the impact of COVID 19 on construction projects performance, which is a limitation of this research.

Practical implications

The implication is that, owing to the imposed lockdowns and strict precautionary measures to curb the rapid spread of the pandemic, smooth execution of the construction project across the country was affected. The government institutions and stakeholders of the construction projects introduced and implemented various techniques and solutions which effectively handled the implications of the COVID-19 pandemic on the construction industry of the UAE.

Originality/value

This study has identified the challenges faced by the construction industry of the UAE in the context of the management of project schedule, project cost, construction contracts, health and safety of construction employees and other related aspects of the construction projects. This study also identified the techniques and solutions adopted by various public and private institutions of the country and their implications on construction projects. Therefore, this study provides guidelines for policymakers and future research studies alike.

Details

Journal of Engineering, Design and Technology , vol. 20 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 10 of over 4000