Article
Publication date: 15 March 2024

Huimin Li, Boxin Dai, Yongchao Cao, Limin Su and Feng Li

Trust is the glue that holds cooperative relationships together and often exists in an asymmetric manner. The purpose of this study is to explore how to mitigate the issue of…

24

Abstract

Purpose

Trust is the glue that holds cooperative relationships together and often exists in an asymmetric manner. The purpose of this study is to explore how to mitigate the issue of losses or increased transaction costs caused by opportunistic behavior in a soft environment where trust asymmetry is quite common and difficult to avoid.

Design/methodology/approach

This study focuses on examining asymmetric trust between the government and the private sector in public-private partnership (PPP) projects. Drawing upon both project realities and relevant literature, the primary conditional variables influencing asymmetric trust are identified. These variables encompass power perception asymmetry, information asymmetry, interaction behavior, risk perception differences and government-side control. Subsequently, through the use of a survey questionnaire, binary-matched data from both the government and the private sector are collected. The study employs fuzzy-set qualitative comparative analysis (fsQCA) to conduct a configurational analysis, aiming to investigate the causal pathways that trigger asymmetric trust.

Findings

No single conditional variable is a necessary condition for the emergence of trust asymmetry. The pathways leading to a high degree of trust asymmetry can be categorized into two types: those dominated by power perception and those involving a combination of multiple factors. Differences in power perception play a crucial role in the occurrence of high trust asymmetry, yet the influence of other conditional variables in triggering trust asymmetry should not be overlooked.

Originality/value

The findings can contribute to advancing the study of trust relationships in the field of Chinese PPP projects. Furthermore, they hold practical value in facilitating the enhancement of trust relationships between the government and the private sector.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 20 December 2023

Isaac Akomea-Frimpong, Xiaohua Jin, Robert Osei Kyei, Portia Atswei Tetteh, Roksana Jahan Tumpa, Joshua Nsiah Addo Ofori and Fatemeh Pariafsai

The application of circular economy (CE) has received wide coverage in the built environment, including public-private partnership (PPP) infrastructure projects, in recent times…

Abstract

Purpose

The application of circular economy (CE) has received wide coverage in the built environment, including public-private partnership (PPP) infrastructure projects, in recent times. However, current studies and practical implementation of CE are largely associated with construction demolition, waste and recycling management. Few studies exist on circular models and success factors of public infrastructures developed within the PPP contracts. Thus, the main objective of this article is to identify the models and key success factors associated with CE implementation in PPP infrastructure projects.

Design/methodology/approach

A systematic review of the literature was undertaken in this study using forty-two (42) peer-reviewed journal articles from Scopus, Web of Science, Google Scholar and PubMed.

Findings

The results show that environmental factors, sustainable economic growth, effective stakeholder management, sufficient funding, utilization of low-carbon materials, effective supply chain and procurement strategies facilitate the implementation of CE in PPP infrastructure projects. Key CE business models are centered around the extension of project life cycle value, circular inputs and recycling and reuse of projects.

Research limitations/implications

Although the study presents relevant findings and gaps for further investigations, it has a limited sample size of 42 papers, which is expected to increase as CE gain more prominence in PPP infrastructure management in future.

Practical implications

The findings are relevant for decision-making by PPP practitioners to attain the social, economic and environmental benefits of transitioning to circular infrastructure management.

Originality/value

This study contributes to articulating the key models and measures toward sustainable CE in public infrastructure development.

Details

Built Environment Project and Asset Management, vol. 14 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 25 December 2023

Isaac Akomea-Frimpong, Jacinta Rejoice Ama Delali Dzagli, Kenneth Eluerkeh, Franklina Boakyewaa Bonsu, Sabastina Opoku-Brafi, Samuel Gyimah, Nana Ama Sika Asuming, David Wireko Atibila and Augustine Senanu Kukah

Recent United Nations Climate Change Conferences recognise extreme climate change of heatwaves, floods and droughts as threatening risks to the resilience and success of…

Abstract

Purpose

Recent United Nations Climate Change Conferences recognise extreme climate change of heatwaves, floods and droughts as threatening risks to the resilience and success of public–private partnership (PPP) infrastructure projects. Such conferences together with available project reports and empirical studies recommend project managers and practitioners to adopt smart technologies and develop robust measures to tackle climate risk exposure. Comparatively, artificial intelligence (AI) risk management tools are better to mitigate climate risk, but it has been inadequately explored in the PPP sector. Thus, this study aims to explore the tools and roles of AI in climate risk management of PPP infrastructure projects.

Design/methodology/approach

Systematically, this study compiles and analyses 36 peer-reviewed journal articles sourced from Scopus, Web of Science, Google Scholar and PubMed.

Findings

The results demonstrate deep learning, building information modelling, robotic automations, remote sensors and fuzzy logic as major key AI-based risk models (tools) for PPP infrastructures. The roles of AI in climate risk management of PPPs include risk detection, analysis, controls and prediction.

Research limitations/implications

For researchers, the findings provide relevant guide for further investigations into AI and climate risks within the PPP research domain.

Practical implications

This article highlights the AI tools in mitigating climate crisis in PPP infrastructure management.

Originality/value

This article provides strong arguments for the utilisation of AI in understanding and managing numerous challenges related to climate change in PPP infrastructure projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 January 2024

Yanhui Du, Jingfeng Yuan, ShouQing Wang, Yan Liu and Ningshuang Zeng

The information used for supervision by regulatory departments in public-private partnership (PPP) projects is primarily transmitted and processed by the PPP implementation…

110

Abstract

Purpose

The information used for supervision by regulatory departments in public-private partnership (PPP) projects is primarily transmitted and processed by the PPP implementation department, which negatively impacts the information quality, leading to information asymmetry and undermining the overall effectiveness of supervision. This study aims to explore how to use blockchain to anchor the information used for supervision in PPP projects to the original information, to strengthen the oversight.

Design/methodology/approach

This paper adopts the principles of design science research (DSR) to design a conceptual framework that systematically organizes information along the information dissemination chain, ensuring the reliable anchoring of original information. Two-stage interviews involving experts from academia and industry are conducted, serving as formative and summative evaluations to guide the design.

Findings

The framework establishes a weak-centralized information organizing mode, including the design of governance community and on-chain and off-chain governance mechanisms. Feedback from experts is collected via interviews and the designed framework is thought to improve information used for supervision. Constructive suggestions are also collected and analyzed for further development.

Originality/value

This paper provides a novel example exploring the inspirations blockchain can bring to project governance, like exercising caution regarding the disorderly expansion of public sector authority in addressing information disadvantages and how to leverage blockchain to achieve this. Technical details conveyed by the framework deepen understanding of how blockchain benefits and the challenges faced in successful implementation for practitioners and policymakers. The targeted evaluation serves as rigorous validation, guiding experts to provide reliable feedback and richer insights by offering them a more cognitively convenient scenario.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 August 2022

Bo Tian, Jiaxin Fu, Yongshun Xu and Longshan Sun

The risks and uncertainties of public–private partnership (PPP) projects threaten their sustainability. Contract flexibility, which is based on the theory of incomplete contract…

Abstract

Purpose

The risks and uncertainties of public–private partnership (PPP) projects threaten their sustainability. Contract flexibility, which is based on the theory of incomplete contract and transaction cost, may be a viable solution to this issue. The purpose of this study is to investigate the relationship between contract flexibility and the sustainability performance of PPP projects. The multiple mediating roles of justice perception and cooperation efficiency are assessed, thereby allowing the pathways and conditions to be understood more comprehensively for improving the sustainability performance of PPP projects.

Design/methodology/approach

Nine hypotheses in the proposed research model are tested via structural equation modeling using data acquired from 218 Chinese PPP professionals.

Findings

Results show that contract flexibility positively affects PPP project sustainability performance. Justice perception and cooperation efficiency play direct and sequential mediating roles in this effect.

Originality/value

This study validates that contract flexibility positively impacts the sustainability performance of PPP projects, where justice perception and cooperation efficiency serve direct and sequential mediating roles. The findings of this study contribute to an improved understanding of the effect of contract flexibility on the sustainability performance of PPP projects. Furthermore, they provide important theoretical and practical insights into contract management as well as beneficial information and valuable initiatives for improving the sustainability of PPP projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 June 2022

Robert Osei-Kyei, Timur Narbaev, Michael Atafo-Adabre, Nicholas Chileshe and Joseph Kwame Ofori-Kuragu

The demand for retirement villages globally has been increasing due to the rapid growth in the ageing population in recent years. To address the rising challenges in the…

Abstract

Purpose

The demand for retirement villages globally has been increasing due to the rapid growth in the ageing population in recent years. To address the rising challenges in the retirement market, the public–private partnership (PPP) has become a feasible method to develop retirement villages. This paper aims to survey and examine the key success criteria (SC) for using the PPP approach in the retirement village sector.

Design/methodology/approach

An empirical questionnaire survey was conducted with experts experienced in international PPP and retirement village. The analysis was conducted using one-way analysis of variance, mean score analysis, Kendall’s coefficient of concordance and factor analysis.

Findings

Results indicate that out of the 16 recognized SC, the most significant ones are SC1: “Affordability”, SC11: “Reduced social isolation of residents” and SC14: “Improvement of emotional wellbeing of residents”. Furthermore, results from the factor analysis technique indicate that the 16 SC can be classified into five major factor groupings, and these include SCG1 – “Financial performance of project”; SCG2 – “Adherence to design and technical specifications”; SCG3 – “Adherence to local council/authority’s environmental health and socio-economic requirements”; SCG4 – “Social inclusion and risk management”; and SCG5 – “Advancement in emotional wellbeing and physical health of residents”.

Originality/value

The study will sufficiently assist retirement village stakeholders, retirement village project participants and related government authorities of the best measures to put in place to maintain the sustainable development of the global retirement village market.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 8 March 2022

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and David John Edwards

In comparison to other countries, power generation in Sub-Saharan Africa is poor. The demand for power has surged in recent times and continues to increase at a fast rate. The…

Abstract

Purpose

In comparison to other countries, power generation in Sub-Saharan Africa is poor. The demand for power has surged in recent times and continues to increase at a fast rate. The public–private partnership (PPP) model has been identified as an option to address the challenges in the power sector. The purpose of this research paper is to critically explore the reasons for entering into PPP power projects in Ghana by the public and private parties.

Design/methodology/approach

Questionnaires were used to elicit responses from respondents using a two-round Delphi survey. From 60 respondents contacted in round one, 48 responses were obtained, and these 48 respondents further took part in round two. Mean score ranking was used to rank the reasons for entering into PPP power projects, while analysis of variance (ANOVA) was run to test significant difference in perceptions among the respondents.

Findings

From round 2 of the Delphi survey, the significant reasons for public sector entering into PPP power projects were as follows: achieving improved value for money, access to additional capital, increased certainty of projects and greater efficiency of project delivery services. For private sector, most significant reasons were as follows: obtaining of investment support, improvement in private sector’s international image and synergy with public sector. From ANOVA analysis, there were significant different perceptions among some of factors on the respondent profile variables and the reasons for entering into PPP power projects, while other factors did not have significant different perception.

Originality/value

Significant reasons for both public and private sectors identified would be incorporated by the government when PPP policy guidelines and laws are reviewed. This will aid in the effective implementation of PPP for power projects.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 15 December 2023

Zehui Bu, Jicai Liu and Jiaqi Liu

Emotions, understood as evolving mental states, are pivotal in shaping individuals“' decision-making, especially in ambiguous information evaluation, probability estimation of…

Abstract

Purpose

Emotions, understood as evolving mental states, are pivotal in shaping individuals“' decision-making, especially in ambiguous information evaluation, probability estimation of events, and causality analysis. Public–private partnership (PPP) projects represent a confluence of “economic–environmental–social” dimensions, wherein stakeholder behavior follows the sequential progression of “cognition–emotion–action.” Consequently, comprehending the effects of emotional shifts on stakeholder's decision-making processes is vital to fostering the sustainability of PPP projects.

Design/methodology/approach

The paper utilizes rank-dependent expected utility and evolutionary game theory to systematically examine the influence of emotional factors on stakeholders' behavior and decision-making processes within PPP projects. The paper integrates three emotional state functions—optimism, pessimism and rationality—into the PPP framework, highlighting the intricate interactions among the government, private sector, surrounding public and the media. Furthermore, the paper amalgamates the evolutionary pathways of environmental rights incidents with the media's role. Through equilibrium analysis and numerical simulation, the paper delves into the diverse interplay of emotions across different phases of the environmental rights incident, assessing the impact of these emotions on the evolutionary game's equilibrium results.

Findings

Emotions significantly influence the microlevel decisions of PPP stakeholders, adapting continually based on event dynamics and media influences. When the private sector demonstrates optimism and the surrounding public leans toward rationality or pessimism, the likelihood of the private sector engaging in speculative behavior escalates, while the surrounding public refrains from adopting a supervisory strategy. Conversely, when the private sector is pessimistic and the public is optimistic, the system fails to evolve a stable strategy. However, when government regulation intensifies, the private sector opts for a nonspeculative strategy, and the surrounding public adopts a supervisory strategy. Under these conditions, the system attains a relatively optimal state of equilibrium.

Originality/value

The paper develops a game model to examine the evolutionary dynamics between the surrounding public and private sectors concerning environmental rights protection in waste incineration PPP projects. It illuminates the nature of the conflicting interests among project participants, delves into the impact of emotional factors on their decision-making processes and offers crucial perspectives for the governance of such partnerships. Furthermore, this paper provides substantive recommendations for emotional oversight to enhance governance efficacy.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 December 2023

Hui Zhao, Xian Cheng, Jing Gao and Guikun Yu

Building a smart city is a necessary path to achieve sustainable urban development. Smart city public–private partnership (PPP) project is a necessary measure to build a smart…

Abstract

Purpose

Building a smart city is a necessary path to achieve sustainable urban development. Smart city public–private partnership (PPP) project is a necessary measure to build a smart city. Since there are many participants in smart city PPP projects, there are problems such as uneven distribution of risks; therefore, in order to ensure the normal construction and operation of the project, the reasonable sharing of risks among the participants becomes an urgent problem to be solved. In order to make each participant clearly understand the risk sharing of smart city PPP projects, this paper aims to establish a scientific and practical risk sharing model.

Design/methodology/approach

This paper uses the literature review method and the Delphi method to construct a risk index system for smart city PPP projects and then calculates the objective and subjective weights of each risk index through the Entropy Weight (EW) and G1 methods, respectively, and uses the combined assignment method to find the comprehensive weights. Considering the nature of the risk sharing problem, this paper constructs a risk sharing model for smart city PPP projects by initially sharing the risks of smart city PPP projects through Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) to determine the independently borne risks and the jointly borne risks and then determines the sharing ratio of the jointly borne risks based on utility theory.

Findings

Finally, this paper verifies the applicability and feasibility of the risk-sharing model through empirical analysis, using the smart city of Suzhou Industrial Park as a research case. It is hoped that this study can provide a useful reference for the risk sharing of PPP projects in smart cities.

Originality/value

In this paper, the authors calculate the portfolio assignment by EW-G1 and construct a risk-sharing model by TOPSIS-Utility Theory (UT), which is applied for the first time in the study of risk sharing in smart cities.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 10 November 2023

Bamidele Temitope Arijeloye

This paper aims to help understand how adopting risk allocation criteria impacts the delivery of public–private partnership (PPP) mass housing in Nigeria with the view of…

Abstract

Purpose

This paper aims to help understand how adopting risk allocation criteria impacts the delivery of public–private partnership (PPP) mass housing in Nigeria with the view of promoting the adoption of PPP housing scheme in Nigeria.

Design/methodology/approach

The research design adopts the census sampling approach by using well-structured questionnaires distributed to stakeholders involved in PPP-procured mass housing projects, i.e. consultants, in-house professionals, contractors and the organized private sector, registered with PPP departments in the Federal Capital Territory Development Authority, Abuja, Nigeria. Sixty-three risk factors, nine risk allocation criteria and nine project delivery indices were submitted for the respondents to rank on a Likert scale of 7. Two hypotheses were formulated to test whether the risk allocation criteria impacted PPP mass housing delivery or otherwise. The study adopts partial least square-structural equation modeling to model the effect of risk on risk allocation criteria on project delivery indices and risk severity.

Findings

The finding shows that project risk allocation criteria have less effect on project delivery indices than on risk severity. The study concludes that risk allocation principles do not directly affect the delivery of PPP-procured mass housing projects. This is evident by the path coefficient of 0.724 values, which is not statistically significant at a 5% alpha protection value. The study concludes that allocating critical risk factors influences the performance of PPP-procured mass housing projects, as the path coefficient of 0.360 is also not significantly far from 0 and at a 5% alpha protection value.

Originality/value

The study is one of the recent studies conducted in PPP-procured mass housing projects in Nigeria owing to the novelty of procurement option in the sector. It highlights the risk factors that can jeopardize the PPP-procured mass housing project objectives. The study is of immense value to PPP actors in the sector by providing the necessary information required to formulate risk response methods to minimize the impact of the risk factors in PPP mass housing projects.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords