1 – 10 of over 3000
Article
Publication date: 20 December 2023

Isaac Akomea-Frimpong, Xiaohua Jin, Robert Osei Kyei, Portia Atswei Tetteh, Roksana Jahan Tumpa, Joshua Nsiah Addo Ofori and Fatemeh Pariafsai

The application of circular economy (CE) has received wide coverage in the built environment, including public-private partnership (PPP) infrastructure projects, in recent times…

Abstract

Purpose

The application of circular economy (CE) has received wide coverage in the built environment, including public-private partnership (PPP) infrastructure projects, in recent times. However, current studies and practical implementation of CE are largely associated with construction demolition, waste and recycling management. Few studies exist on circular models and success factors of public infrastructures developed within the PPP contracts. Thus, the main objective of this article is to identify the models and key success factors associated with CE implementation in PPP infrastructure projects.

Design/methodology/approach

A systematic review of the literature was undertaken in this study using forty-two (42) peer-reviewed journal articles from Scopus, Web of Science, Google Scholar and PubMed.

Findings

The results show that environmental factors, sustainable economic growth, effective stakeholder management, sufficient funding, utilization of low-carbon materials, effective supply chain and procurement strategies facilitate the implementation of CE in PPP infrastructure projects. Key CE business models are centered around the extension of project life cycle value, circular inputs and recycling and reuse of projects.

Research limitations/implications

Although the study presents relevant findings and gaps for further investigations, it has a limited sample size of 42 papers, which is expected to increase as CE gain more prominence in PPP infrastructure management in future.

Practical implications

The findings are relevant for decision-making by PPP practitioners to attain the social, economic and environmental benefits of transitioning to circular infrastructure management.

Originality/value

This study contributes to articulating the key models and measures toward sustainable CE in public infrastructure development.

Details

Built Environment Project and Asset Management, vol. 14 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 17 October 2023

Sajida and Bevaola Kusumasari

This paper aims to identify the factors affecting the implementation of Public-Private Partnerships (PPPs) in the education sector.

1538

Abstract

Purpose

This paper aims to identify the factors affecting the implementation of Public-Private Partnerships (PPPs) in the education sector.

Design/methodology/approach

Based on Scopus and adopting the protocol of Staples and Niazi (2007), this systematic literature review examined 21 articles on PPPs in the education sector. Content analysis is adopted to identify research gaps and provide information on critical issues in the cases.

Findings

The findings have identified the critical success factors of PPPs in the education sector in 12 countries, revealing varying degrees of success and implementation challenges. They reflect the importance of clear objectives, effective communication, and robust partnerships between the public and private sectors to achieve success. These insights contribute to an in-depth understanding of PPP implementation in education, which can guide future projects.

Originality/value

The critical success factors identified in PPPs implementation in education across various countries may provide a comprehensive worldwide perspective for researchers, practitioners and policymakers.

Details

Public Administration and Policy, vol. 26 no. 3
Type: Research Article
ISSN: 1727-2645

Keywords

Article
Publication date: 24 November 2023

Yongjian Ke, Zhe Cheng, Jingxiao Zhang and Yong Liu

Despite the widespread study and application of public-private partnerships (PPPs) since the 1980s, the field lacks a universally accepted definition that captures the concept's…

Abstract

Purpose

Despite the widespread study and application of public-private partnerships (PPPs) since the 1980s, the field lacks a universally accepted definition that captures the concept's complexity. This study aims to offer a definition and foster a more substantive and comprehensive discourse on PPPs to improve communication and understanding between academics and practitioners from diverse disciplines and legislative backgrounds.

Design/methodology/approach

Grounded in the family-resemblance concept proposed by German philosopher Ludwig Wittgenstein, this study conducts a comprehensive literature review to identify core and non-core elements frequently cited in PPP descriptions. The authors used these findings to develop the PPP sunflower model as a structured framework for defining PPPs.

Findings

The analysis elucidates six core elements consistently present in PPP descriptions: clarity of roles and responsibilities, appropriate risk allocation and sharing, injection of expertise and resources, cooperation and teamwork, a bundle of services, and long-term contracts. Coupled with identified non-core elements, these core components comprise the PPP sunflower model, a structured framework for defining PPPs that accommodates their multi-faceted nature.

Originality/value

The PPP sunflower model distinguishes itself as a unique contribution to the PPP literature. It offers a rigorous theoretical framework that can elucidate the complexity of PPPs for various stakeholders. The model serves as a practical tool for evaluating the authenticity and viability of PPP projects. The study's novelty lies in its adoption of the family-resemblance concept, thereby providing a comprehensive, multi-dimensional framework that enhances the understanding of PPPs across different disciplines and legislative contexts.

Details

Built Environment Project and Asset Management, vol. 14 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 25 April 2023

Lachlan McDonald-Kerr and Gordon Boyce

The purpose of this paper is to investigate public disclosures and accountability for government decision-making in the case of a major prison project delivered through a…

Abstract

Purpose

The purpose of this paper is to investigate public disclosures and accountability for government decision-making in the case of a major prison project delivered through a Public–Private Partnership (PPP) in the State of Victoria (Australia).

Design/methodology/approach

The study explores a unique case to provide insights into public disclosures for PPPs in a jurisdiction that is a recognised leader in PPP policy and practice. The analysis is theoretically framed by an understanding of neoliberalism and New Public Management, and draws on data from case-specific reporting, media reporting and public policy, to examine interconnections between accounting, public discourse and accountability.

Findings

The analysis shows how publicly available information relating to key government decisions routinely lacked supporting evidence or explanation, even though areas of subjectivity were recognised in public policy. Accounting was deployed numerically and discursively to present potentially contestable decisions as being based on common-sense “facts”. The implied “truth” status of government reporting is problematised by media disclosure of key issues absent from government disclosures.

Social implications

Under neoliberalism, accountingisation can help depoliticise the public sphere and limit discourse by constructing ostensible “facts” in an inherently contestable arena. By contrast, democratic accountability requires public disclosures that infuse a critical dialogical public sphere.

Originality/value

The paper shows how neoliberalism can be embedded in public policies and institutional practices, and buttressed by the use of accounting. The analysis illuminates the persistence and “failing forward” character of neoliberalism, whereby crises are addressed through further neoliberalisation.

Details

Accounting, Auditing & Accountability Journal, vol. 37 no. 1
Type: Research Article
ISSN: 0951-3574

Keywords

Article
Publication date: 16 June 2023

Xia Shu, Stewart Smyth and Jim Haslam

The authors explore the under-researched area of post-decision evaluation in PPPs (public–private partnerships), focusing upon how and whether Post-decision Project Evaluation…

Abstract

Purpose

The authors explore the under-researched area of post-decision evaluation in PPPs (public–private partnerships), focusing upon how and whether Post-decision Project Evaluation (PdPE) is considered and provided for in United Kingdom (UK) public infrastructure projects.

Design/methodology/approach

The authors’ research design sought insights from overviewing UK PPP planning and more focused exploration of PPP operational practice. The authors combine the extensive analysis of planning documents for operational UK PPP projects with interviews of different stakeholders in PPP projects in one city. Mobilising an open critical perspective, documents were analysed using ethnographic content analysis (ECA) and interviews were analysed using thematic analysis consistent therewith. The authors theorise the absence and ambiguities of PdPE drawing on the sociology of ignorance.

Findings

The authors find a long-standing absence and lack of PdPE in PPP projects throughout planning and operational practice, reflecting a dynamic, multi-faceted ignorance. Concerning planning practice, the authors’ documentary analysis evidences a trend in PdPE from its absence in the early years (which may indicate some natural or genuine ignorance) to different levels or forms of weak inclusion later. Regarding this inclusion, the authors find strategic ignorance played a substantive role, involving “deliberate engineering” by both public sector and private partners. Interview findings indicate lack of clarity over PdPE and its under-development in PPP practice, deficiencies again suggestive of natural and strategic ignorance.

Originality/value

The authors draw from the sociology of ignorance vis-à-vis accounting's absence and ambiguity in the context of PPP, contributing to an under-researched area.

Details

Accounting, Auditing & Accountability Journal, vol. 37 no. 1
Type: Research Article
ISSN: 0951-3574

Keywords

Article
Publication date: 19 June 2023

Jose Oliveros-Romero and Ajibade A. Aibinu

This study aims to develop an ex-post impact evaluation method for public-private partnership projects (PPP) that addresses one of its main difficulties: the multiplicity of…

Abstract

Purpose

This study aims to develop an ex-post impact evaluation method for public-private partnership projects (PPP) that addresses one of its main difficulties: the multiplicity of perspectives and stakeholders that exist in these projects.

Design/methodology/approach

This study first developed a conceptual evaluation framework called ‘Project Success Evaluation Pyramid Model’ (PSEPM) that was designed using a Design Science approach. Second, an impact evaluation method was designed based on the PSEPM. This evaluation method was tested and refined using three PPP projects. This article presents the refined conceptual model PSEPM, the evaluation method and one of the three tests: the PPP toll road.

Findings

The impact evaluation method describes how to evaluate the impact of an existing mega project from the perspective of multiple stakeholders and isolate the impact of the procurement method. Its application in practice is demonstrated with a PPP toll road project in Chile, in which 11 stakeholders were identified. Issues such as city segregation, deficient business model, the relevance of infrastructure availability, and deficient service-fee strategy were identified in the project. The evaluation method provides a judgement about the use of the PPP procurement method and about the overall impact of the project, reconciling the stakeholder perspectives.

Originality/value

The use of this approach could give greater clarity and legitimacy to the discussion over the use of PPPs by evaluating existing projects beyond the use of traditional time and cost measurements. Its originality is the systematic recognition and identification of stakeholder motives, purposes, and judgements over a project.

Details

Built Environment Project and Asset Management, vol. 13 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 28 November 2022

Jiaqi Liu and Jicai Liu

This paper aims to determine the demand category and level of government and investors in public–private partnership (PPP) projects. It emphasizes the importance of meeting the…

Abstract

Purpose

This paper aims to determine the demand category and level of government and investors in public–private partnership (PPP) projects. It emphasizes the importance of meeting the demands of stakeholders and controlling the unreasonable demands. This study aims to improve the demand management of stakeholders in the PPP project and lay a foundation for the research on behavior based on the motivation theory.

Design/methodology/approach

This paper opted for a questionnaire survey to collect data based on indicators identified through literature. The participants come from the government and private sector (investors, contractors, operators, etc.) in China PPP Lecture Hall. The reliability, validity and variance analyses are used to test the reliability of data. Factor analysis and entropy method are used to determine demand categories and weights.

Findings

The government’s 14 demands are divided into four groups: satisfy public activities, self-interest, responsibility and relief financial pressure; 6 investor's demands are divided into development ability and satisfy social activities. The self-interest of government is higher than that of the publicity in PPP projects; investor's social reputation is most important, it is a foundation for obtaining external resources and achieving enterprise development.

Research limitations/implications

Because of the chosen research approach, the demand indexes cannot be exhausted. Therefore, researchers are encouraged to enrich relevant contents further.

Practical implications

This paper includes implications for a targeted demand control mechanism and for managing the unreasonable demand.

Originality/value

This paper comprehensively identifies the demand hierarchy of the government and investors, and provides the theoretical basis for the target management of stakeholders.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 December 2022

Cong Wang, Henry Liu, Michael C.P. Sing and Jin Wu

Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction…

Abstract

Purpose

Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction. However, Private Public Partnerships (PPPs) have been subjected to a long pre-construction, thereby leading to an inefficient development process. Therefore, the purpose of this paper is to pay attention to the influencing factors elongating the pre-construction duration.

Design/methodology/approach

Based on data of 5,677 PPP projects between 2009 and 2021 in China, the authors adopt the Accelerated Failure Time (AFT) model in duration analysis to empirically analyze the following underlying dynamics determining the duration of PPP pre-construction stages: (1) policy uncertainty; (2) corruption; and (3) procurement method selection. To observe the influencing paths more specifically, the authors divided the pre-construction duration into the pre-tendering period and tendering period and regressed them separately.

Findings

The results indicate that the pre-construction duration is significantly prolonged with increased policy uncertainty and corruption degree as well as the use of tendering methods. Meanwhile, the above factors have a greater impact on the pre-tendering period than the tendering period.

Originality/value

The contribution of this study is twofold: (1) theoretically, this paper provides new evidence on the impact of PPP policy uncertainty, corruption and procurement method selection on the pre-construction duration. It complements empirical studies on the factors elongating the time efficiency of PPPs projects. (2) In practice, it provides a specific path for the government to improve the time efficiency of PPPs.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 September 2022

Ali Mohammad Mirzaee, Towhid Pourrostam, Javad Majrouhi Sardroud, M. Reza Hosseini, Payam Rahnamayiezekavat and David Edwards

Public–private partnerships (PPPs) are notoriously prone to disputes among stakeholders, some of which may unduly jeopardize contract performance. Contract disputes arising in…

Abstract

Purpose

Public–private partnerships (PPPs) are notoriously prone to disputes among stakeholders, some of which may unduly jeopardize contract performance. Contract disputes arising in Iran are often due to inefficiency of PPP concession agreements and practice. This study presents a causal-predictive model of the root causes and preventive measures for inter-organization disputes to enhance the likelihood of achieving desirable performance in PPP projects.

Design/methodology/approach

A theoretical “causal-predictive” model was developed with fourteen hypotheses based on extant literature and contractual agency theory, which resulted in the creation of a pool of 110 published items. Data were obtained from a questionnaire survey with 75 valid responses, completed by 4 stratified groups of Iranian PPP experts. Partial least square structural equation modeling (PLS-SEM) was used for validating the proposed model via a case study.

Findings

Results reveal that the main three factors of PPP desirable performance are as follows: on-time project completion, high quality of activities/products and services for public satisfaction. Further, the most influential factors of the lifecycle problems, construction stage, and preferred risk allocation included risk misallocation, improper payment mechanism and failure to facilitate a timely approval process.

Originality/value

For researchers, the findings contribute to the theory of contractual agency; specifically, how different influences among the model's elements lead to better PPP performance. In practical terms, proposed outcome-based strategies will inform PPP stakeholders to avoid dispute occurrence and thus improve the time, quality and services of projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 March 2023

Rafedzah Mohd Som, Ismi Arif Ismail, Zoharah Omar, Siti Noormi Alias and Soaib Asimiran

This study aims to test a public–private partnership (PPP) success model by examining the direct effects of two input factors (facilitative leadership and communication quality…

412

Abstract

Purpose

This study aims to test a public–private partnership (PPP) success model by examining the direct effects of two input factors (facilitative leadership and communication quality) on an outcome factor, namely, PPP success (PPP project success and PPP relational success), as well as the mediating effect of trust as a process factor on these relationships.

Design/methodology/approach

The present research uses the sociotechnical systems theory as the guiding framework. This is a quantitative study that uses a questionnaire survey and purposive sampling. The respondents comprise 266 public and private sector employees who have been involved in various PPP projects. The data gathered from the survey are analysed using SPSS and structural equation modelling (AMOS version 23.0).

Findings

The findings of this study indicate that facilitative leadership, communication quality and trust are positively correlated with PPP success, that is, PPP relational and PPP project success. Trust is found to mediate the relationship between facilitative leadership and communication quality with PPP success.

Practical implications

This paper upholds the importance of facilitative leadership, communication quality and trust in a PPP setting.

Originality/value

This study enriches the knowledge of PPP projects regarding facilitative leadership, communication quality and trust. It also discusses the vital role of these variables in ensuring PPP success.

Details

Journal of Asia Business Studies, vol. 17 no. 5
Type: Research Article
ISSN: 1558-7894

Keywords

1 – 10 of over 3000