Search results

1 – 10 of 260
Article
Publication date: 12 January 2022

Qianwen Zhou, Xiaopeng Deng, Bon-Gang Hwang and Miao Yu

Although knowledge transfer in the context of projects and project-based organizations (PBOs) has gained increasing attention from academia and industry, it is not clear how…

Abstract

Purpose

Although knowledge transfer in the context of projects and project-based organizations (PBOs) has gained increasing attention from academia and industry, it is not clear how knowledge transfers from projects to their parent PBOs. This research aims to explore the main factors influencing knowledge transfer from projects to their parent PBOs, and analyze how these factors integrate the transfer process as system components using the system dynamics (SD) method.

Design/methodology/approach

Based on the literature review, investigation and interview, this paper adopts the event analysis to obtain the influencing factors from historical cases and establishes a conceptual model of knowledge transfer from five dimensions, which simultaneously considers the knowledge sender, knowledge receiver and the relationship between the knowledge sender and receiver, knowledge features and transfer context. Then, the relationships between variables in the qualitative model were clarified, and a quantitative model including seven feedback loops was established using the SD model. Lastly, the system simulation and sensitivity analysis of the main parameters were realized in Vensim PLE software.

Findings

The simulation analysis results show that the model can simulate the knowledge transfer process from projects to the PBO to a certain extent. This research fully demonstrates the impact of variables from five dimensions on knowledge transfer and incorporates the knowledge gap and transfer threshold in the research category. Moreover, the rationality of seven feedback loops proposed in the model was verified. And the effects of various factors on the amount of knowledge transferred and the PBO's knowledge stock were examined through sensitivity analysis. Furthermore, recommendations for developing an integrated knowledge transfer mechanism of PBOs and projects to enhance transfer effect are offered.

Research limitations/implications

This research provides other researchers with a systematic understanding of transfer process from projects to PBOs, and insight for further research on knowledge transfer in project and organization contexts. Furthermore, this study guides researchers to focus on the causal processes that constitute knowledge transfer and explores the expected and unexpected phenomena generated over time. However, some variables involved in the transfer process are simplified, and the establishment of a more complex dynamic model needs further research and discussion.

Practical implications

By establishing a simulation model for knowledge transfer from projects to their parent PBOs, this study helps project teams and PBOs grasp the overall picture of the transfer process. Especially, this paper provides target-oriented recommendations for project and PBO managers to implement effective knowledge transfer practices, which have certain practical values for knowledge cultivation, coordination, reuse and innovation in the organization.

Originality/value

This study contributes to knowledge management and project management literature by simulating the knowledge transfer process from projects to their parent PBOs. Additionally, this paper provides a reference for PBO and project managers to establish an integrated knowledge-transfer mechanism in the work process and comprehensively implement effective knowledge transfer practices.

Details

International Journal of Managing Projects in Business, vol. 15 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 26 November 2019

Ganggang Teng, Feng Wei and Yingwu Yao

This paper aims to improve the corrosion resistance performance and stability of PbO2 electrodes in chloride wastewater.

Abstract

Purpose

This paper aims to improve the corrosion resistance performance and stability of PbO2 electrodes in chloride wastewater.

Design/methodology/approach

The morphology of PbO2-ZrO2 nanocomposite electrodes was observed by scanning electron microscopy (SEM). The open circuit potential (OCP) curves, anodic polarization curves, electrochemical impedance spectra, accelerated life tests, weight-loss tests and reusability tests were used to study the corrosion resistance properties and stability of PbO2-ZrO2 nanocomposite electrodes in NaCl solution.

Findings

SEM showed that the surface morphology of PbO2-ZrO2 nanocomposite electrodes became compacted and smooth. Electrochemical tests showed that ZrO2 nanoparticles could increase the OCP, corrosion potential and charge transfer resistance, and decrease the corrosion current density in 3.5 Wt. per cent NaCl electrolyte solution. Besides, PbO2-ZrO2 nanocomposite electrodes showed high reusability for acetamiprid degradation, the accelerated service life could reach 146 h, which was almost 3.3 times longer than that of PbO2 electrodes (44 h), weight-loss tests showed that the corrosion resistance for PbO2-ZrO2 nanocomposite electrodes was 2.3 times as compared to PbO2 electrodes.

Originality/value

By the codeposition of ZrO2 nanoparticles, the corrosion resistance performance and stability of PbO2 electrodes in NaCl electrolyte were improved.

Details

Anti-Corrosion Methods and Materials, vol. 67 no. 1
Type: Research Article
ISSN: 0003-5599

Keywords

Article
Publication date: 6 August 2018

Fredrik Backlund and Erik Sundqvist

There are limited studies of continuous improvement (CI) from the perspective of a project-based organization (PBO). Hence, the purpose of this paper is to explore challenges that…

2091

Abstract

Purpose

There are limited studies of continuous improvement (CI) from the perspective of a project-based organization (PBO). Hence, the purpose of this paper is to explore challenges that PBOs may encounter when applying CI.

Design/methodology/approach

An exploratory and qualitative approach has been used, involving six management teams in six different PBOs, using focus groups interviews as data collecting method.

Findings

A high degree of autonomy among project managers seems to limit a collective approach to project management in PBOs. As a consequence the overall PBO performance becomes subordinate to the individual project performance—an approach opposite to that of CI. Further, the management teams themselves seem to uphold a project focus, also complicating improvement initiatives from a PBO-perspective.

Research limitations/implications

The management teams have been the unit of analysis, where the PBOs mainly conduct projects in an engineering and construction context, and are located in the same country and region. This approach enables the thorough study of a phenomenon, while preconditions for generalization are limited. However, the findings could be used by researchers as a basis for more in-depth studies of specific challenges, and for making surveys to obtain generalization of results.

Practical implications

The results can induce awareness and understanding of different challenges if applying CI in a PBO, hence a starting point for finding ways to overcome these challenges.

Originality/value

The article contributes to an increased understanding of challenges that PBOs may encounter when applying CI, confirming and presenting additional findings compared to previous studies.

Details

International Journal of Quality & Reliability Management, vol. 35 no. 7
Type: Research Article
ISSN: 0265-671X

Keywords

Book part
Publication date: 13 December 2004

Valerie J. Richardson

In 1998 and 1999, the Office of Student Financial Assistance of the Department of Education and the Patent and Trademark Office of the Department of Commerce, were designated as…

Abstract

In 1998 and 1999, the Office of Student Financial Assistance of the Department of Education and the Patent and Trademark Office of the Department of Commerce, were designated as Performance-Based Organizations (PBOs), respectively. This paper examines the transformation progress of the agencies, as they attempt to convert to high-performing organizations by utilizing and establishing new and more flexible systems of performance-oriented business practices and processes.

The paper compares and contrasts the different approaches and tools used to improve management and organizational performance, as well as concentrate on human resources, procurement, budget, customer service, and internal controls. The document explores whether or not these agencies have improved their performance as a result of these flexibilities and examines the organizational and cultural challenges encountered as the agencies move from a restrictive and bureaucratic system, to a more liberal system of management and internal controls.

The Performance-Based Organizations (PBOs) concept is to have federal agencies focus on the customer, deliver high quality products, and devise more efficient operations. Therefore, the paper further examines whether or not the PBO legislation has been effective in changing the performance of federal organizations by granting administrative and managerial flexibilities aligned with corporate (agency) strategies, performance, and pay.

Details

Advances in Management Accounting
Type: Book
ISBN: 978-0-76231-139-2

Article
Publication date: 1 February 2006

Xiaoyan Liu and Weidong Yu

PBO and p-aramids fibers were compared on thermal degradation in TG and DTG experiments, and PBO fiber showed the highest degradation temperature in both air and nitrogen…

Abstract

PBO and p-aramids fibers were compared on thermal degradation in TG and DTG experiments, and PBO fiber showed the highest degradation temperature in both air and nitrogen atmosphere. Annealed under high temperature of 100°C, 200°C, 300°C and 400°C for 1.5 hours, the tenacity of these samples all decreased with the temperature, while PBO fiber showed the best tensile retention property. Whereas using the xenon arc light to simulate sunlight irradiated on the PBO and Kevlar samples for different time respectively, PBO showed the worst tensile retention property. In contrast, the p-aramid fibers showed their relatively good mechanical stability when exposed to the simulated sunlight. Therefore, the application of PBO fibers should be careful in the state of sunlight irradiation although PBO has the highest original mechanical and thermal property.

Details

Research Journal of Textile and Apparel, vol. 10 no. 1
Type: Research Article
ISSN: 1560-6074

Keywords

Article
Publication date: 14 November 2008

Alan Lowe and Joanne Locke

The purpose of the paper is to use a case study setting involving the implementation of an enterprise resource planning (ERP) system to expose and analyze the conflicts in the…

2444

Abstract

Purpose

The purpose of the paper is to use a case study setting involving the implementation of an enterprise resource planning (ERP) system to expose and analyze the conflicts in the characterizations of the post bureaucratic organisation (PBO) in the literature. ERP implementations are often accompanied by increasing levels of stress in organizations that place pressures on organizational relationships and structures. Additionally, ERPs are regarded as introducing their own techno‐logic of centralization, standardization and formalization that provides an apparent contrast to the exhortations about employee empowerment.

Design/methodology/approach

A case study of ERP implementation in a medium‐sized entity is presented. The paper explores aspects of ERP and PBO from the context of postmodern organization theory.

Findings

Some concerns about PBO identified in the literature are reflected in the case situation. For example, there is a commitment to give up private time and work flexibly by some employees. The paper also provides evidence of the way the management team substitute their reliance on a key individual knowledge worker for that of an ERP system and external vendor support. Paradoxically, trust in that same knowledge worker and between core users of the system is essential to enable the implementation of the system.

Originality/value

This paper adds empirical insight to a predominantly theoretical literature. The case evidence indicates some conflicting implications in the concurrent adoption of PBO and ERP.

Details

Information Technology & People, vol. 21 no. 4
Type: Research Article
ISSN: 0959-3845

Keywords

Article
Publication date: 29 September 2023

Vikas Kumar and Vikrant Kaushal

Ethical consumerism is gaining importance as consumers are becoming increasingly concerned about brands' moral intentions and social and legal practices. Hence, in a quest to…

Abstract

Purpose

Ethical consumerism is gaining importance as consumers are becoming increasingly concerned about brands' moral intentions and social and legal practices. Hence, in a quest to advance the current application of ethics in branding, this study substantiates literature by investigating consumer-perceived brand ethicality's (CPBE) role in affecting psychological, affective and behavioral responses of consumers (i.e. psychological brand ownership (PBO), brand commitment and willingness to pay a price premium (WPPP). Further, the authors test self-congruence as the boundary condition for CPBE.

Design/methodology/approach

Online survey method resulted in 408 responses, and the data were analyzed using structural equation modeling (SEM).

Findings

CPBE emerged as a predictor for PBO, brand commitment and WPPP. However, counterintuitively, self-congruence failed to reflect any moderating effect on the relationships between CPBE and PBO and CPBE and brand commitment.

Practical implications

Brands are encouraged to indulge in and reflect ethical practices to generate favorable consumer responses, i.e. PBO, brand commitment and WPPP.

Originality/value

Based on the ethical and psychological ownership theories, the investigation adds to the scholarship on CPBE and its outcomes. Arguably, it remains the first study to document the linkage between CPBE and PBO.

Details

Marketing Intelligence & Planning, vol. 41 no. 8
Type: Research Article
ISSN: 0263-4503

Keywords

Article
Publication date: 4 November 2013

Riza Casidy

The purpose of this paper is to examine the relationship between perceived brand orientation (PBO), satisfaction, loyalty, and post-enrolment communication behaviour in the…

2219

Abstract

Purpose

The purpose of this paper is to examine the relationship between perceived brand orientation (PBO), satisfaction, loyalty, and post-enrolment communication behaviour in the Australian higher education sector.

Design/methodology/approach

Two hundred and fifty-eight questionnaires were completed by undergraduate students of a particular university in Australia. Structural equation modeling was employed in this study to examine the associations between the constructs.

Findings

This study provides empirical evidence that PBO has a positive and significant relationship with all dependent variables. The research reveals that students' perception of a university's brand orientation is significantly related to satisfaction, loyalty, and post-enrolment communication behaviour.

Research limitations/implications

The findings may guide the key decision makers in higher education institutions to understand the importance of brand orientation in their corporate strategy to enhance satisfaction, loyalty, and positive WOM, which can be used to differentiate themselves from other institutions in the highly competitive education market.

Originality/value

Past researchers have not looked into the dynamic relationships between PBO, satisfaction, loyalty, and post-enrolment communication behaviour, and hence research is to be called for in this area. The paper is the first to examine brand orientation from the perspective of the students and provide higher education institutions with recommendations to improve service quality through brand orientation.

Details

Asia Pacific Journal of Marketing and Logistics, vol. 25 no. 5
Type: Research Article
ISSN: 1355-5855

Keywords

Article
Publication date: 2 May 2017

Saeed Reza Allahkaram and Namdar Mohammadi

This paper aims to evaluate corrosion behavior of bare and PbO2-coated stainless steel 316L, as prospective candidates for bipolar plates, in simulated proton exchange membrane…

Abstract

Purpose

This paper aims to evaluate corrosion behavior of bare and PbO2-coated stainless steel 316L, as prospective candidates for bipolar plates, in simulated proton exchange membrane fuel cell’s (PEMFC’s) environment under operating potentials.

Design/methodology/approach

A set of potentiodynamic, as well as potentiostatic, electrochemical experiments was carried out under both anodic and cathodic potentials. Gathered data were analyzed via fast Fourier transform algorithm for further investigation. X-ray diffraction analysis was also used for determining coating characteristics upon completion of electrochemical experiments.

Findings

Results revealed that bare SS316L is a better candidate for bipolar plate material under anodic potential, as it is cathodically protected. However, PbO2-coated SS316L is favorable under cathodic potential, as bare specimen will suffer localized corrosion in the form of pitting.

Research limitations/implications

It would be of interest if all the experiments are carried out in a PEMFC stack.

Practical implications

This research strives to promote the use of electrochemical noise measurement for practical corrosion monitoring of coated bipolar plates in fuel cells.

Social implications

Improving the corrosion resistance of bipolar plates will expedite commercialization of PEMFCs, which in turn will translate into a substantial reduction in carbon footprint.

Originality/value

This research strives to promote the use of electrochemical noise measurement for practical corrosion monitoring of coated bipolar plates in fuel cells.

Details

Anti-Corrosion Methods and Materials, vol. 64 no. 3
Type: Research Article
ISSN: 0003-5599

Keywords

Article
Publication date: 4 July 2016

Bankole Awuzie and Peter McDermott

Extant literature highlights the increasing inability of project-based organisations (PBOs) to meet infrastructure client’s expectations, particularly as it concerns the delivery…

Abstract

Purpose

Extant literature highlights the increasing inability of project-based organisations (PBOs) to meet infrastructure client’s expectations, particularly as it concerns the delivery of socio-economic outcomes during the delivery process. Unclear communication channels and poor processing of information especially as it pertains to client’s strategic objectives results in a misalignment of objectives among participating parties. As its central proposition, the purpose of this paper is to hold that unclear communication channels between parties within infrastructure project PBOs affects their degree of internal cohesion hence posing strong challenges to their overall viability.

Design/methodology/approach

Applying the Viable Infrastructure Delivery Systems Model (VIDM); a model premised on the tenets of the Viable Systems Model, this qualitative study proceeds to assess a particular PBO within a developing country to understand its communication and control channels and to identify where gaps likely to affect the internal cohesiveness of the PBO, if any, existed. Whereas semi-structured interviews and project/policy documents were used as data collection tools, data were analysed using pre-set themes.

Findings

According the study’s findings, an absence of a prevalent common identity was observed among the various parties to the PBO. Contractors’ capabilities to deliver on time and to budget based on their expertise remained pivotal within the PBO thus abandoning the attainment of the client’s pre-defined socio-economic objectives. Cases of faulty and ineffective organisational architecture, functional and communication issues were observed.

Research limitations/implications

Based upon these findings, it is recommended that the VIDM be adopted at the commencement of the PBO lifecycle and used at various intervals by project managers and other stakeholders for assessing the levels of organisational viability.

Originality/value

The methodology and findings resulting from this study represent information from fieldwork conducted by the author and as such have not been used elsewhere.

Details

Built Environment Project and Asset Management, vol. 6 no. 3
Type: Research Article
ISSN: 2044-124X

Keywords

1 – 10 of 260