Search results

1 – 10 of over 2000
Article
Publication date: 4 March 2019

Lawrence L. Martin

This exploratory study aims to look at the policy and public-procurement requirements set forth in state public-private partnership (P3) legislation and their relationship to P3

Abstract

Purpose

This exploratory study aims to look at the policy and public-procurement requirements set forth in state public-private partnership (P3) legislation and their relationship to P3 project implementation.

Design/methodology/approach

The research uses both cross-sectional and longitudinal approaches. The paper begins by defining P3s and discussing their increasing importance as a form of private-sector delivery of public facilities and infrastructure. The major policy and procurement requirements of state P3 legislation are then identified. Using the public works financing database of 301 P3 project closures between 1996 and 2016, the relationships between state P3 legislative policy and procurement requirements and P3 project implementation are explored.

Findings

The study finds positive associations between 15 of 16 state P3 legislative policy and procurement requirements.

Originality/value

This is the first study of its kinds to explore the relationships between state P3 policy and procurement requirements and P3 project implementation (project closures).

Details

Journal of Public Procurement, vol. 19 no. 1
Type: Research Article
ISSN: 1535-0118

Keywords

Open Access
Article
Publication date: 3 February 2020

Paulos A. Wondimu, Ole Jonny Klakegg and Ola Lædre

Early contractor involvement (ECI) faces many barriers because it differs from traditional business practices. Public owners, especially, face a major challenge because they must…

9285

Abstract

Purpose

Early contractor involvement (ECI) faces many barriers because it differs from traditional business practices. Public owners, especially, face a major challenge because they must comply with international and national legislation. The purpose of this paper is to develop a framework that illustrates the various approaches that public project owners can take to implement ECI.

Design/methodology/approach

In addition to a literature review, three groups of case studies were carried out. The case studies were based on 54 semi-structured in-depth interviews with key personnel from 21 Norwegian public projects and document study.

Findings

In all, 25 approaches to ECI were identified during the research. Twelve of these were used in the cases studied.

Social implications

There are several approaches to ECI that are suitable for public owners. However, the contractor’s contribution depends on which approach is implemented and how it is implemented.

Originality/value

As original contribution, this study presents a novel framework that defines options for implementing ECI in public projects. Furthermore, this paper provides insights on how ECI can be implemented in public projects based on Norwegian experiences. Although the empirical data of the study is limited to Norwegian public projects, this study contributes to knowledge about how to implement ECI internationally.

Details

Journal of Public Procurement, vol. 20 no. 1
Type: Research Article
ISSN: 1535-0118

Keywords

Open Access
Article
Publication date: 7 October 2022

Michael Opara, Robert Rankin, Ran Ling and Thien Le

In this study, the authors revisit Alberta's public-private partnership (P3) program after 20 years of field level experience by retracing its historical emergence and…

1851

Abstract

Purpose

In this study, the authors revisit Alberta's public-private partnership (P3) program after 20 years of field level experience by retracing its historical emergence and institutional evolution given its political context. Specifically, the authors adopt a path dependence perspective to reconstruct and reexamine Alberta's P3 program emergence, reflect on the successes achieved, and articulate challenges that must be overcome to institutionalize P3s as part of Alberta's infrastructure delivery environment in the future.

Design/methodology/approach

Adopting a constructivist approach and a case-based methodology, the authors (re)analyze the activities of governmental agents, private industry, and other actors as part of a new infrastructure policy introduced in 2002 to transform the provincial institutional landscape to accommodate P3.

Findings

The authors find Alberta's P3 emergence was driven by the necessity of its infrastructure deficits, political expediency, and resource scarcity. Furthermore, with well-entrenched conservative political actors as gatekeepers, Alberta's P3 implementation demonstrated stability and incremental change simultaneously, consistent with core elements of path dependency. Following the introduction of P3 in Alberta, the province lacked formal institutional structures that would transition its P3 program from good to great and enable it to become firmly embedded in the public infrastructure delivery landscape. With the subsequent absence of P3-convinced (political) leadership and uncertainty about its P3 policy direction, Alberta was unable or unwilling to consolidate the progress made at the start of the program.

Originality/value

Most recently, the emergence of new political leadership in Alberta has (re)catalyzed policy progress, pointing toward a more methodical program approach, and suggesting a rediscovered confidence in P3s in the province with the establishment of a P3 Office (P3O), including nascent formal rules for unsolicited bids. These recent changes in our view make for a much more anchored policy and could lead to program sustainability and eventual institutionalization. Given the unpredictability of the recent political change, a more robust analysis of the relationship between political party control, leadership, and P3 stability is required to anticipate future policy and organizational obstacles.

Details

Accounting, Auditing & Accountability Journal, vol. 35 no. 9
Type: Research Article
ISSN: 0951-3574

Keywords

Open Access
Article
Publication date: 18 November 2021

Michael Opara, Oliver Nnamdi Okafor, Akolisa Ufodike and Kenneth Kalu

This study adopts an institutional entrepreneurship perspective in the context of public–private partnerships (P3s) to highlight the role of social actors in enacting…

1445

Abstract

Purpose

This study adopts an institutional entrepreneurship perspective in the context of public–private partnerships (P3s) to highlight the role of social actors in enacting institutional change in a complex organizational setting. By studying the actions of two prominent social actors, the authors argue that successful institutional change is the result of dynamic managerial activity supported by political clout, organizational authority and the social positioning of actors.

Design/methodology/approach

The authors conducted a field-based case study in a complex institutional and organizational setting in Alberta, Canada. The authors employed an institutional entrepreneurship perspective to identify and analyze the activities of two allied actors motivated to transform the institutional environment for public infrastructure delivery.

Findings

The empirical study suggests that the implementation of institutional change is both individualistic and collaborative. Moreover, it is grounded in everyday organizational practices and activities and involves a coalition of allies invested in enacting lasting change in organizational practice(s), even when maintaining the status quo seems advantageous.

Originality/value

The authors critique the structural explanations that dominate the literature on public–private partnership implementation, which downplays the role of agency and minimizes its interplay with institutional logics in effecting institutional change. Rather, the authors demonstrate that, given the observed impact of social actors, public–private partnership adoption and implementation can be theorized as a social phenomenon.

Details

Accounting, Auditing & Accountability Journal, vol. 34 no. 9
Type: Research Article
ISSN: 0951-3574

Keywords

Article
Publication date: 1 February 2021

Yunping Liang and Baabak Ashuri

In classical perspective, projects under a certain size are not feasible for P3. However, there is an emerging trend on using P3 to deliver projects which are frequently at small…

Abstract

Purpose

In classical perspective, projects under a certain size are not feasible for P3. However, there is an emerging trend on using P3 to deliver projects which are frequently at small- to medium- size to meet ever-increasingly complex social needs, including enhancing lifecycle performance of existing facilities, designing and building for resilience and sustainability, ensuring cost effectiveness of public spending and fostering innovation. In contrast with the increasing implementation, small and medium P3s, especially those in the United States, receive little attention in existing studies. This study aims at answering the question: in the context of US, what features of those small- to medium- sized P3s with success records enable the selection of P3 as delivery method.

Design/methodology/approach

By critically reviewing the literature, this study synthesizes and discusses the challenges in classical perspective. The authors use a framework drawn from the transaction cost to propose two types of enabling features that could contribute to the success of small and medium P3s. The proposed enabling features are supported by case study of twelve identified small- to medium- sized P3s which have reached financial closure as of 2018 in the United States.

Findings

The results show how the identified enabling opportunities have been used in these cases to enhance the viability of the P3 model in the infrastructure market. The two types of features are high tolerance enabler explained by the expectations on indirect and non-monetary compensations, and cost reduction enablers including: (1) being in the sectors with well-established traditions on using private investments; (2) having developers with expertise on infrastructure finance; (3) being in the jurisdictions with favorable legislative environment and (4) having less-uncertain future project revenue.

Originality/value

This study, for the first time, critically examines the enabling features of the P3 model for delivering small and medium infrastructure projects in the United States. This research sheds light on the credibility and viability of small- to medium- sized P3 and increases the confidence in policy makers to promote this model.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 25 April 2022

Vuyokazi Precious Camngca, Christopher Amoah and Emma Ayesu-Koranteng

The construction industry’s daily processes demand heavy data usage and communication between project participants to meet client requirements. Thus, the application of…

2109

Abstract

Purpose

The construction industry’s daily processes demand heavy data usage and communication between project participants to meet client requirements. Thus, the application of information technology in project implementation has been increasing in the construction sector (CS) lately. However, the same cannot be seen in public sectors responsible for implementing government projects in South Africa. This study aimed to investigate the causes and effects of the underutilisation of information communication technology (ICT) in the building section of a public sector in a municipality in South Africa.

Design/methodology/approach

A qualitative approach was adopted for the study, using a public sector in one of the municipalities as a case study. Face-to-face interviews were conducted among the building unit workers, using unstructured interview questions. The data collected were analysed using the ATLAS.ti software.

Findings

The findings indicate a lack of understanding of existing and newly available ICT software and hardware technology among staff within the building technology due to lack of digitalisation in construction projects implementation, inadequate system upgrades, lack of adequate ICT resources, lack of financial resources for internet and software application subscriptions and lack of ICT training leading. The issues mentioned above have led to the outsourcing of projects professionals, slow pace of electronic emails, untrained professionals, usage of different and unlicensed software, resulting in the underutilisation of ICT within the whole building section. This change also adversely affects all officials, especially the junior officials who have graduated using the most recent ICT technology during their studies.

Research limitations/implications

The building department of only one public sector was used for the study; therefore, the findings may not be generalisable. The case study public sector’s name is withheld for confidentiality purposes.

Practical implications

Adequate change management and continuous development, combined with the allocation of proper resources, would be necessary for all staff members. Enormous investments had to be made in the ICT equipment by providing a sufficient budget in the building section of the public sectors. The building section within public sectors should provide change management to all aged skills staff by attending seminars to learn new ICT technology applied within its work environment.

Originality/value

The study established the causes of the underutilisation of ICT in the CS, especially in the public work departments and municipalities, and how this contributes to service delivery.

Details

Journal of Facilities Management , vol. 22 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 4 May 2021

Alvaro Garay, Angie Ruiz and Jose Guevara

This study aims to analyze the technical, environmental, economic and thermal comfort impacts of implementing passive measures and heating systems in Ciudad Verde, a large-scale…

Abstract

Purpose

This study aims to analyze the technical, environmental, economic and thermal comfort impacts of implementing passive measures and heating systems in Ciudad Verde, a large-scale social housing project located at the periphery of Bogota, Colombia.

Design/methodology/approach

A system dynamics (SD) model is proposed to evaluate scenarios through counterfactual experiments, including technical, environmental and economic components. Model inputs are obtained from building energy simulation models and data collected from official reports, public policy documents and construction records.

Findings

Results suggest that the use of heating systems is the best choice to achieve thermal comfort conditions throughout the day. However, both the capital expenditures and CO2 emissions associated with such system make their adoption very difficult. In line with that, the use of heating systems in combination with passive measures stands out as a viable solution since their costs are affordable and their use contributes to reducing CO2 emissions.

Originality/value

The proposed model recreates the dynamics underlying social housing construction processes, the adoption of heating systems and passive measures in low-income dwellings and their corresponding impact on CO2 emissions and indoor thermal comfort conditions. The model can be employed as a support tool in the formulation of social housing policies associated with thermal comfort specifications. In this way, the model represents a first step toward incorporating thermal-related variables into the decision-making processes related to social housing planning and development.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 November 2022

Praveena Munianday, Rahimi A. Rahman and Muneera Esa

There is a dearth of studies conducted by local academics on actual building information modelling (BIM) projects to analyse the actual hurdles of BIM adoption. The majority of…

Abstract

Purpose

There is a dearth of studies conducted by local academics on actual building information modelling (BIM) projects to analyse the actual hurdles of BIM adoption. The majority of BIM research focuses on the technology’s general advantages, disadvantages, issues and limitations. In addition, research on actual BIM projects that have integrated BIM throughout the project is necessary to increase the current low number of BIM users in Malaysia. Consequently, the purpose of this study is to examine the challenges BIM adopters experience while implementing BIM in their projects and how they overcome them.

Design/methodology/approach

An in-depth interview session was used to collect data based on a case-study methodology. In Malaysia, three BIM projects were chosen, given the available resources. To evaluate the data in this qualitative study, NVivo was used.

Findings

According to the findings, the most important elements influencing the adoption of new technology and innovation were people and capital. The most significant impediments to BIM adoption are the appraisal of time and finances, as well as the tolerance of changes in approach.

Originality/value

Collaborative training and BIM education have been the most explored solutions for reducing BIM difficulties. As a result, these concerns and solutions should be investigated and implemented to ensure project success and fully use technological innovation.

Details

Journal of Facilities Management , vol. 21 no. 4
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 7 November 2014

Nobuhiko Daito and Jonathan L. Gifford

The use of public-private partnerships (P3s) for infrastructure delivery, particularly for highway projects, has been increasing in the USA. The purpose of this paper is to…

1048

Abstract

Purpose

The use of public-private partnerships (P3s) for infrastructure delivery, particularly for highway projects, has been increasing in the USA. The purpose of this paper is to empirically evaluate the difference of P3s and non-P3 highway projects, in terms of their costs and efficiency.

Design/methodology/approach

An empirical model of highway construction costs was estimated using a linear regression model that explicitly accounts for the cost differential between the contracts. The differences between efficiencies was also evaluated through a two-stage analysis, where projects’-specific technical efficiencies were first estimated using stochastic frontier analysis and data envelopment analysis, and then the difference in technical efficiencies between the two groups were evaluated through non-parametric tests of means.

Findings

Controlling for various project characteristics, the P3 highway projects in the USA showed higher initial costs than non-P3 projects. However, the efficiency scores showed no significant difference between the two groups. This inconsistency between initial costs and technical efficiency scores suggests the complexity involved in P3 projects, which are not captured in the efficiency analysis.

Research limitations/implications

Limited availability of P3 project data due to their immaturity (in cases of P3 projects that include operation and management) and their complex engineering specifications may have caused biased results. Importantly, the study analyzed project costs as of financial close; post-financial close variations, such as change orders during construction, cost/schedule overruns, and renegotiation of contract terms, are beyond the scope of the analysis in this study.

Originality/value

The present study contributes to the literature as one of the earliest empirical analyses of the performance of highway P3s in the USA. Also, this is one of the first studies to employ frontier analysis methods that focus on the efficiency of highway project delivery.

Details

Managerial Finance, vol. 40 no. 11
Type: Research Article
ISSN: 0307-4358

Keywords

Article
Publication date: 2 October 2017

Linda Zhang, Balkrishna Eknath Narkhede and Anup P. Chaple

Firms have been implementing lean manufacturing to improve their business performances. However, they have difficulties in the implementation due to the many barriers. In view of…

2739

Abstract

Purpose

Firms have been implementing lean manufacturing to improve their business performances. However, they have difficulties in the implementation due to the many barriers. In view of the lack of research and the importance in understanding them, the purpose of this paper is identify and evaluate the lean barriers with respect to their levels of importance in implementation.

Design/methodology/approach

As lean barriers are scattered in the literature and a variety of performance measures are used in practice, an extensive literature review is first carried out to identify the lean barriers and performance measures. A novel ranking technique – interpretive ranking process (IRP) – is adopted in the evaluation. In the IRP-based evaluation approach, a group discussion technique, where five Indian lean experts are involved, is applied to determine the most important lean barriers and performance measures. Several matrices are developed step by step for calculating the ranks of the selected lean barriers. Upon validating the ranks, an IRP-based lean barrier evaluation model is developed.

Findings

The IRP-based lean barrier evaluation model can help firms better understand lean barriers and their levels of importance in lean implementation. In the light of this model, to successfully implement lean, firms should provide sufficient management time and training to employees, develop a right culture, develop effective communication, carry out low-cost production, and obtain external funding.

Practical implications

The evaluation results provide the practitioners with a realistic framework to deal with many problems, especially those related to resource allocation, in lean implementation. Based on the framework, practitioners can prioritize lean barriers during implementation in accordance with performances targeted.

Originality/value

This is the first study that provides a comprehensive review of lean barriers available in the literature and evaluates them in accordance with performance measures. The combined use of literature review and experts in the evaluation approach justifies the value of the study.

Details

Journal of Manufacturing Technology Management, vol. 28 no. 8
Type: Research Article
ISSN: 1741-038X

Keywords

1 – 10 of over 2000