Search results
1 – 10 of 26Ayman Ahmed Ezzat Othman and Rodayna Ehab Hegazy
This research aims to develop and validate a framework for eradicating women’s discrimination in architectural design firms (ADFs) in Egypt and propose strategies for prospective…
Abstract
Purpose
This research aims to develop and validate a framework for eradicating women’s discrimination in architectural design firms (ADFs) in Egypt and propose strategies for prospective adoption in the Gulf Cooperation Council (GCC) countries to increase the transformational impact of women on the architectural and urban developments of the Gulf region.
Design/methodology/approach
A combined qualitative and quantitative research approach was designed to accomplish four objectives. Firstly, to investigate the nature of business in ADFs, women’s discrimination and policies for gender equity (PGE) in architecture. Secondly, to analyse three case studies to validate the identified causes and impacts of women’s discrimination and examine the role of PGE towards eradicating women’s discrimination in ADFs. Thirdly, to conduct a survey questionnaire with a representative sample of ADFs to investigate their perception of women’s discrimination and the correlation between PGE towards eradicating women’s discrimination in ADFs. Based on the above, the research developed and validated a framework to eradicate women’s discrimination in ADFs in Egypt and suggested strategies for potential application in the GCC countries to increase the transformational role of women in the architectural and urban developments of the Gulf region.
Findings
Through literature review and case studies, the research identified and validated the causes and impacts of women’s discrimination as well as PGE in Architecture. The findings of data analysis showed that the highest-ranked causes of women discrimination in ADFs were “customs and beliefs” followed by “Underestimating women’s work” and “Recruiting males more than females”. Moreover, the highest-ranked impacts of women’s discrimination were “career shift and leaving the profession” followed by “decrease in creativity and innovation” and “decrease in economic growth”. Furthermore, the Spearman correlation test showed that while some PGE were correlated, others were not. These findings helped in the development of the proposed framework and proposed strategies.
Practical implications
This research presents a practical framework to eliminate women’s discrimination in ADFs in Egypt based on the findings of literature review, case studies and survey questionnaire. The framework explained in a workable way the objectives of the framework functions; activities; tools and techniques; involved personnel and needed resources as well as enforcing mechanisms. It was validated by a representative sample of ADFs in Egypt to ensure its practicability and viability and suggested strategies for implementation in the GCC countries to increase women’s role in architectural and urban development.
Originality/value
The research identified and validated the causes and impacts of women’s discrimination as well as PGE in Architecture. Moreover, the research investigated the perception of women’s discrimination and the correlation between PGE through conducting a survey questionnaire with a representative of ADFs in Egypt. The research tackled a topic that received scant attention in construction literature, especially in Egypt and the GCC countries. The research developed and validated a framework to eradicate women’s discrimination in ADFs in Egypt. It represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred. The research suggested several strategies for the prospective implementation of the framework in the GCC countries as an approach to enhancing the transformational role of women in the architectural and urban developments of the Gulf region.
Details
Keywords
Najimu Saka, Abdullahi Babatunde Saka, Opeoluwa Akinradewo and Clinton O. Aigbavboa
The complex interaction of politics and the economy is a critical factor for the sustainable growth and development of the construction sector (CNS). This study aims to…
Abstract
Purpose
The complex interaction of politics and the economy is a critical factor for the sustainable growth and development of the construction sector (CNS). This study aims to investigate the effects of type of political administration including democracy and military on the performance of CNS using the Nigerian Construction Sector (NCS) as a case study.
Design/methodology/approach
A 48 year (1970–2017) time series data (TSD) on the NCS and the gross domestic product (GDP) based on 2010 constant USD were extracted from the United Nations Statistical Department database. Analysis of variance (ANOVA) and analysis of covariance (ANCOVA) models were used to analyze the TSD. The ANCOVA model includes the GDP as correlational variable or covariate.
Findings
The estimates of the ANOVA model indicate that democratic administration is significantly better than military administration in construction performance. However, the ANCOVA model indicates that the GDP is more important than political administration in the performance of the CNS. The study recommends for a new national construction policy, favourable fiscal and monetary policy, local content development policy and construction credit guaranty scheme for the rapid growth and development of the NCS.
Originality/value
Hitherto, little is known about the influence of political administration on the performance of the CNS. This study provides empirical evidence from a developing economy perspective. It presents the relationships and highlights recommendations for driving growth in the construction industry.
Details
Keywords
The purpose of this paper is to highlight the regulatory barriers to achieving sustainable buildings in Kosovo. The present paper focuses on regulatory barriers viewed from the…
Abstract
Purpose
The purpose of this paper is to highlight the regulatory barriers to achieving sustainable buildings in Kosovo. The present paper focuses on regulatory barriers viewed from the perspective of construction industry experts in achieving sustainable buildings.
Design/methodology/approach
The present study uses a qualitative research method and semi-structured interviews as a research instrument. The present study interviews around 20 experts in construction and property management, property development, spatial planning and energy management.
Findings
The study finds that Kosovo building laws and regulations provide for the materials assessment criteria, but the materials assessment criteria are only for mechanic strength. The study further finds that the sustainability concept is not included and incorporated in Kosovo's urban planning laws and regulations. The study also finds that despite specific clauses mentioning energy performance certificates in the Law on Energy Performance of Buildings in Kosovo, energy performance certificates appears to be not enforced and the nature of the barrier is more organizational rather than regulatory. Finally, the study finds that Kosovo laws are silent as far as green labeling of building materials is concerned.
Practical implications
The implication of the present finding is that policymakers in Kosovo not only should include clear sustainable materials assessment criteria in the law, but also enforce those criteria through testing and inspection mechanisms included in the law and implemented in practice through funding and organizational support. Nonetheless, policymakers in Kosovo should contemplate amending the urban planning laws in Kosovo and include both the term of sustainability at the planning level and conformity guidelines for sustainable design that can be done at the administrative directive level. Further, the clauses in the law do not suffice if the clauses are not accompanied by specific systemic and organizational support in the issuance of energy performance certificates. Policymakers in Kosovo should be proactive in designing clauses that specify green labeling standards for materials; however, these labeling standards should not adversely affect the cost of construction and reduce the demand for real estate.
Originality/value
The study is the first qualitative study about the perception of construction professionals in Kosovo, regarding the regulatory barriers of sustainable buildings in Kosovo.
Details
Keywords
Jing Yin, Jiahao Li, Ahui Yang and Shunyao Cai
In regarding to operational efficiency and safety improvements, multiple tower crane service scheduling problem is one of the main problems related to tower crane operation but…
Abstract
Purpose
In regarding to operational efficiency and safety improvements, multiple tower crane service scheduling problem is one of the main problems related to tower crane operation but receives limited attention. The current work presents an optimization model for scheduling multiple tower cranes' service with overlapping areas while achieving collision-free between cranes.
Design/methodology/approach
The cooperative coevolutionary genetic algorithm (CCGA) was proposed to solve this model. Considering the possible types of cross-tasks, through effectively allocating overlapping area tasks to each crane and then prioritizing the assigned tasks for each crane, the makespan of tower cranes was minimized and the crane collision avoidance was achieved by only allowing one crane entering the overlapping area at one time. A case study of the mega project Daxing International Airport has been investigated to evaluate the performance of the proposed algorithm.
Findings
The computational results showed that the CCGA algorithm outperforms two compared algorithms in terms of the optimal makespan and the CPU time. Also, the convergence of CCGA was discussed and compared, which was better than that of traditional genetic algorithm (TGA) for small-sized set (50 tasks) and was almost the same as TGA for large-sized sets.
Originality/value
This paper can provide new perspectives on multiple tower crane service sequencing problem. The proposed model and algorithm can be applied directly to enhance the operational efficiency of tower cranes on construction site.
Details
Keywords
Wenque Liu, Albert P.C. Chan, Man Wai Chan, Amos Darko and Goodenough D. Oppong
The successful implementation of hospital projects (HPs) tends to confront sundry challenges in the planning and construction (P&C) phases due to their complexity and…
Abstract
Purpose
The successful implementation of hospital projects (HPs) tends to confront sundry challenges in the planning and construction (P&C) phases due to their complexity and particularity. Employing key performance indicators (KPIs) facilitates the monitoring of HPs to advance their successful delivery. This study aims to comprehensively investigate the KPIs for hospital planning and construction (HPC).
Design/methodology/approach
The KPIs for HPC were identified through a systematic review. Then a comprehensive assessment of these KPIs was performed utilizing a meta-analysis method. In this process, basic statistical analysis, subgroup analysis, sensitive analysis and publication bias analysis were performed.
Findings
Results indicate that all 27 KPIs identified from the literature are significant for executing HPs in P&C phases. Also, some unconventional performance indicators are crucial for implementing HPs, such as “Project monitoring effectiveness” and “Industry innovation and synergy,” as their high significance is reflected in this study. Despite the fact that the findings of meta-analysis are more trustworthy than those of individual studies, a high heterogeneity still exists in the findings. It highlights the inherent uncertainty in the construction industry. Hence, this study applied subgroup analysis to explore the underlying factors causing the high level of heterogeneity and used sensitive analysis to assess the robustness of the findings.
Originality/value
There is no consensus among the prior studies on KPIs for HPC specifically and their degree of significance. Additionally, few reviews in this field have focused on the reliability of the results. This study comprehensively assesses the KPIs for HPC and explores the variability and robustness of the results, which provides a multi-dimensional perspective for practitioners and the research community to investigate the performance of HPs during the P&C stages.
Details
Keywords
Chau Ngoc Dang, Warit Wipulanusat, Peem Nuaklong and Boonsap Witchayangkoon
In developing countries, construction organizations are seeking to effectively implement green innovation strategies. Thus, this study aims to assess the importance of green…
Abstract
Purpose
In developing countries, construction organizations are seeking to effectively implement green innovation strategies. Thus, this study aims to assess the importance of green innovation practices and develop a measurement model for quantifying the green innovation degrees of construction firms.
Design/methodology/approach
A mixed-methods research approach is adopted. First, an extensive literature review is performed to identify potential green innovation items, which are then used to design a preliminary questionnaire. Next, expert interviews are conducted to pilot-test this questionnaire. Subsequently, by using a convenience non-probability sampling method, 88 valid responses are collected from construction firms in Vietnam. Then, one-sample and independent-samples t tests are employed to assess the importance of green innovation practices. Fuzzy synthetic evaluation (FSE) is also applied to quantitatively compare such practices. Finally, green innovation level (GIL) is proposed to measure the green innovation indexes and validated by a case study of seven construction firms.
Findings
This study identifies 13 green innovation variables, of which several key practices are highlighted for small/medium and large construction firms. The results of FSE analysis indicate that green process innovation is the most vital green category in construction firms, followed by green product and management innovations, respectively. As a quantitative measure, GIL could allow construction firms to frequently evaluate their green innovation indexes, thereby promoting green innovation practices comprehensively. Hence, construction firms would significantly enhance green competitive advantages and increasingly contribute to green and sustainable construction developments.
Originality/value
This research is one of the first attempts to integrate various green innovation practices into a comprehensive formulation. The established indexes offer detailed green innovation evaluations, which could be considered as valuable references for construction practitioners. Furthermore, a reliable and practical tool (i.e. GIL) is proposed to measure the GILs of construction firms in developing countries.
Details
Keywords
Though widely recognized as essential for improving work performance across various domains, self-efficacy’s specific role in managing construction workforces remains…
Abstract
Purpose
Though widely recognized as essential for improving work performance across various domains, self-efficacy’s specific role in managing construction workforces remains understudied. This knowledge gap restricts our ability to uncover new factors that enhance workforce management effectiveness and ultimately boost construction labor productivity (CLP). To address this, our study proposes and tests a novel model. This model explores the impact mechanism of self-efficacy on CLP by investigating the mediating role of work motivation. By delving into this crucial yet underexplored area, we aim to provide valuable insights for construction project managers and researchers alike, paving the way for more effective workforce management strategies and consequently, improved CLP.
Design/methodology/approach
This study utilizes a mixed-method approach, incorporating both qualitative and quantitative methodologies. Data from 112 rebar workers at five construction sites in Vietnam underwent analysis using Cronbach’s alpha, exploratory factor analysis (EFA), confirmatory factor analysis (CFA) and structural equation modeling (SEM) to examine the novel research model.
Findings
The results indicate a positive and significant association between self-efficacy and CLP. Additionally, work motivation emerged as a full mediator in the relationship between self-efficacy and CLP. Specifically, individuals with higher self-efficacy set ambitious goals and invest more effort in their pursuit, leading to increased work motivation and, ultimately, heightened productivity levels.
Practical implications
The significant implications of the current study extend to construction managers and policymakers alike. Construction managers can leverage the findings to devise targeted interventions aimed at enhancing the self-efficacy and work motivation of their workforce, potentially resulting in noteworthy enhancements in CLP. Policymakers, too, can benefit from these findings by formulating policies that actively support the cultivation of self-efficacy and work motivation among construction workers. Such policies have the potential to foster a more productive and efficient construction industry, aligning with the broader goals of workforce development and industry enhancement.
Originality/value
This study expands existing knowledge by identifying the important role of self-efficacy in work performance enhancement and the mediating role of work motivation in terms of these relationships.
Details
Keywords
Jones Nyame Aboagye, Ernest Kissi, Alex Acheampong and Edward Badu
This research aims to evaluate the status of project management best practices in the road infrastructure sector of Ghana through the inquiry of project managers’ competency.
Abstract
Purpose
This research aims to evaluate the status of project management best practices in the road infrastructure sector of Ghana through the inquiry of project managers’ competency.
Design/methodology/approach
Based on a thorough literature review on competency and project management best practices, a criterion for measuring best practices based on the competencies was identified. Using closed-ended questionnaires as a survey instrument, data was collected and analyzed using a one-sample t-test, Kendall’s concordance coefficient and simple regression.
Findings
The key finding reveals that in achieving project management best practices for the Ghanaian road infrastructure projects, project managers should straighten and strengthen their capability in terms of skills, personal characteristics and knowledge as ranked. An appropriate blend of these characteristics would be a necessary requirement for project managers. Through this, project managers and project-based road infrastructure organizations will be able to win the confidence of their stakeholders and attain improvements in cost-effectiveness, quality and time management.
Research limitations/implications
This study provides project managers in the road infrastructure sector with relevant information on which criteria and variables are critical and are frequently required to manage such projects. This will be helpful for training programs and professional development of project managers in the road infrastructure sector.
Originality/value
The study provides a new direction and focuses for project managers in the road infrastructure industry toward best project management practices in developing countries. It also complements existing studies in this area which deepen the understanding of the subject area.
Details
Keywords
Amir Naser Ghanbaripour, Craig Langston, Roksana Jahan Tumpa and Greg Skulmoski
Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating…
Abstract
Purpose
Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating project delivery success is crucial for organizations since it enables them to prepare for future growth through more effective project management mechanisms and rank the organization's projects for continuous improvement. There is considerable disagreement over a set of success criteria that can be applied to all kinds of projects when evaluating project delivery success, making it a complicated procedure for practitioners and scholars. This research seeks to alleviate the problem by validating and testing a systematic project delivery success model (3D integration model) in the Australian construction industry. The aim is to establish a dependable approach built upon prior research and reliable in evaluating delivery success for any project type.
Design/methodology/approach
Based on a novel project delivery success model, this research applies a case study methodology to analyse 40 construction projects undertaken by a single Australian project management consultancy. The research utilizes a mixed-method research approach and triangulates three sets of data. First, the project delivery success (PDS) scores of the projects are calculated by the model. Second, a qualitative analysis targeting the performance of the same projects using a different system called the performance assessment review (PAR) scores was obtained. These culminate in two sets of ranking. The third step seeks validation of results from the head of the partnering organization that has undertaken the projects.
Findings
The findings of this study indicate that the 3D integration model is accurate and reliable in measuring the success of project delivery in construction projects of various sizes, locations and durations. While the model uses six key performance indicators (KPIs) to measure delivery success, it is evident that three of these may significantly improve the likelihood of PDS: value, speed and impact. Project managers should focus on these priority aspects of performance to generate better results.
Research limitations/implications
Restrictions inherent to the case study approach are identified for this mixed-method multiple-case study research. There is a limitation on the sample size in this study. Despite the researcher's best efforts, no other firm was willing to share such essential data; therefore, only 40 case studies could be analysed. Nonetheless, the number of case studies met the literature's requirements for adequate units for multiple-case research. This research only looked at Australian construction projects. Thus, the conclusions may not seem applicable to other countries or industries. The authors investigated testing the PDS in the construction sector. It can assist in improving efficiency and resource optimization in this area. Nonetheless, the same technique may be used to analyse and rank the success of non-construction projects.
Originality/value
Despite the research conducted previously on the PDS of construction projects, there is still confusion among researchers and practitioners about what constitutes a successful project delivery. Although several studies have attempted to address this confusion, no consensus on consistent performance metrics or a practical project success model has been formed. More importantly, (1) the ability to measure success across multiple project types, (2) the use of triple bottom line (TBL) to incorporate sustainability in evaluating delivery success and (3) the use of a complexity measurement tool to adjust delivery success scores set the 3D integration model apart from others.
Details
Keywords
Ayotunde Babalola and Nishani Harinarain
Sustainable construction practice is structured on regulatory and non-regulatory policies in developed and most developing countries. With the gradual uptake of sustainability…
Abstract
Purpose
Sustainable construction practice is structured on regulatory and non-regulatory policies in developed and most developing countries. With the gradual uptake of sustainability concerns in the construction industry, this paper aims to identify the strategic need for clear-cut policies to improve sustainable construction practice. Previous studies have harped on the need for regulatory and industrial/organisational policies on improving sustainable construction practice within the Nigerian construction industry.
Design/methodology/approach
A questionnaire survey was used to evaluate the perspectives of construction professionals on the policy barriers for sustainable construction practice in Nigeria, and 46 policy barriers were identified. A total of 249 questionnaires were returned and useable for analysis.
Findings
Factor analysis revealed four clusters in the policy barriers to sustainable construction practice in the following order of significance: implementation strategies for sustainable construction practice, owners/client inputs for sustainable construction practice, stakeholder’s policy barriers and governmental and regulatory policy barriers.
Practical implications
Mitigating the identified barriers through effective policies will require adequate inputs from all relevant policymaking stakeholders and ensure improved sustainable construction practice among stakeholders and policymakers in the industry. This will in turn set a high standard and promote the practice of sustainable construction.
Originality/value
This study goes a step further in identifying the policy issues needed to ensure a smooth implementation of sustainable construction practice. The research findings will serve as a guide for policymakers in developing countries that through mitigation of the identified barriers, sustainable construction practice will be promoted.
Details