Article
Publication date: 1 April 2014

P.B. Ahamed Mohideen and M. Ramachandran

The purpose of this paper is to develop a systematic strategic approach to handle corrective maintenance onto the failures/breakdowns of construction equipment. For the…

1155

Abstract

Purpose

The purpose of this paper is to develop a systematic strategic approach to handle corrective maintenance onto the failures/breakdowns of construction equipment. For the maintenance crew/team, a breakdown code management is proposed, which will provide focused and unambiguous approach to manage any kind of breakdowns in construction equipments.

Design/methodology/approach

The past breakdown records of a construction organization in the UAE are considered for analysis. From the failure data, through cause effect analysis (CEA) tools, the components and the breakdown codes namely breakdown main codes (BMC) and breakdown sub-codes (BSC) are formulated. With Pareto analysis, the critical codes are identified and validated through failure modes and effects analyses (FMEA) tools for the critical effect on the affected components. From this identified BSC's further closer failure identification codes namely breakdown symptom codes (BSyC) and breakdown reason codes (BRC) are identified through fault tree analysis (FTA) tools. The approach to modified breakdown maintenance management (MB2M) with breakdown maintenance protocol (BMP) is envisaged.

Findings

The study was conducted on four different types of heavy lifting/earth moving/material handling system of equipment and further focused with two earth moving equipment namely dumpers and wheel loaders. Failure analysis is performed and the failure ratio and the component contribution to the failures are identified. Based on the information, the preliminary codes namely BMC and BSC are identified through CEA tools and the BMC and BSC are identified to find the most contributing codes to the maximum number of failures through Pareto analysis. Further the critical sub-codes are further verified through FMEA tools on the severity levels of the sub components due to these codes. The FTA methods are used to identify the closer reasoning and relations of these codes and the further codes namely BSyC and BRC are identified which are the exact cause of the failures. The management of breakdowns is further proposed through MB2M which includes BMP which provides all resources for the breakdowns.

Research limitations/implications

The failure data collected are only pertaining to the Middle East region and applicable to similar regions for similar plant mix in construction companies. The sample equipment is only part representative of the construction equipment. A more robust model can be suggested in the future covering all aspects and for other regions as well.

Practical implications

The proposed methodology and model approach is highly adaptable to similar industries operating in the Middle East countries.

Originality/value

Many authors have studied the preventive maintenance models and procedures and proposals have been proposed. On the breakdown maintenance management of construction equipment, very few studies have been proposed mostly on the cost analysis. This model attempts to provide a code management solution to manage the unpredictable failures in construction equipment through failure data analysis on a construction organization.

Details

Benchmarking: An International Journal, vol. 21 no. 2
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 12 July 2011

P.B. Ahamed Mohideen, M. Ramachandran and Rajam Ramasamy Narasimmalu

The purpose of this paper to develop a novel strategic approach to handle corrective maintenance procedure in the event of a breakdown/disruption of service. A proposal to…

1277

Abstract

Purpose

The purpose of this paper to develop a novel strategic approach to handle corrective maintenance procedure in the event of a breakdown/disruption of service. A proposal to minimize the recovery time and the breakdown cost in the system in construction plant is presented.

Design/methodology/approach

The past plant breakdown records of a construction organization are considered for the analysis. From the previous breakdown records, a high level metric using Pareto analysis and the cause effect analysis is used to identify the main breakdown main codes (BMC) and the subsequent breakdown sub codes (BSC). Prioritized BMC and BSCs are used to formulate dedicated breakdown maintenance teams, which act swiftly in the event of the breakdown with the modified methods.

Findings

The study was conducted, on four different types of heavy lifting/earth moving/material handling system equipment, which are used to load/unload/haul and transport construction materials. Failure due to tyre puncture and allied problems contribute to maximum failure. A strategy plan to minimize this type of failure is proposed. With the identification of the most contributing BMCs and BSCs, it is further proposed to develop an “overall breakdown maintenance management”.

Research limitations/implications

The collected data pertains to the construction plant located in a particular region, namely the Middle East, and hence the proposed solution is dedicated/relatively applicable to similar plant from the same region. A more robust model can be suggested considering the work environment in the other regions.

Practical implications

The proposed methodology is highly adaptable by similar industries operating in the Middle East region.

Social implications

Construction plant and equipment contribute to the success of construction organizations, by providing enhanced output, reduced manpower requirement, ease of work and timely completion of the project. Delays in completion of projects generally have both social and economical impact on the contractors and the buyers. The proposed model will bring down the lead‐time of the project and enable the contractors to crash down their project completion time.

Originality/value

Numerous studies on preventive maintenance models and procedures are available for a system and in particular to construction plant maintenance in the literature. This model attempts to handle the issues of unpredictable breakdowns in the construction plant to minimise the breakdown time. The proposed model is a novel approach which enables a quick recovery of the construction plant, attributed from the breakdown parameters derived from the previous history of the work records/environment.

Details

Benchmarking: An International Journal, vol. 18 no. 4
Type: Research Article
ISSN: 1463-5771