21 – 30 of 969Aba Essanowa Afful, Joshua Ayarkwa, Godwin Kojo Kumi Acquah, Ama Antwi Darkwa Ossei Assibey and Dickson Osei-Asibey
The purpose of this study is to identify the capacity needs of building professionals to deliver environmentally sustainable buildings (ESBs) globally, from a unique systems…
Abstract
Purpose
The purpose of this study is to identify the capacity needs of building professionals to deliver environmentally sustainable buildings (ESBs) globally, from a unique systems approach. Through a review of extant literature, this study contributes to knowledge of the global delivery of ESBs by identifying research trends and gaps that can be tackled in future research, and current hotspots in capacity building (CB) research within the built environment (BE). The adopted systems approach to CB postulates that the construction industry is systemized in nature, and thus, CB solutions within the industry should be approached from a systems approach.
Design/methodology/approach
A literature search was conducted using the Scopus search engine, augmented by Google Scholar and Web of Science, to produce 54 relevant articles for analysis. The scientometric analysis was undertaken with the use of VOSViewer to better understand the broad literature on CB in the construction industry which would not have been possible with traditional data analysis. The content analysis allowed, for a systematic review of selected articles, to reveal key themes in this study.
Findings
Through a content analysis, four levels of CB were identified within the construction industry; individual level, organizational level, industry level and state level. Nine sub-capacities were subsumed under the four identified levels adopted from Potter and Brough (2004), including but not limited to Performance capacity, Workload capacity, Supervisory capacity, Industry Role capacity and Systems capacity. Under each sub-capacity, key questions were posed to aid identify the capacity needs of BE professionals. A framework for identifying capacity needs in the BE is proposed.
Practical implications
The findings of this study serve as a useful reference for practitioners and policymakers to assess their level of commitment to CB efforts for ESB delivery. The findings of this study have revealed that building the capacities of BE professionals to deliver ESBs should be addressed as part of a broader framework, interdependent on the other levels of CB in the systemic construction industry.
Originality/value
As a review study identifying capacity needs for BE professionals to deliver ESBs, this study enhances knowledge of CB within the construction industry.
Details
Keywords
Patricia Omega Kukoyi, Fredrick Simpeh, Oluseyi Julius Adebowale and Justus Ngala Agumba
The novel COVID-19 pandemic has increased the risk in construction operations. New systems are, thus, required on construction sites to mitigate the risk and challenges associated…
Abstract
Purpose
The novel COVID-19 pandemic has increased the risk in construction operations. New systems are, thus, required on construction sites to mitigate the risk and challenges associated with the pandemic. This paper aims to determine construction organisations risk control systems and the challenges of implementing safety measures on construction sites.
Design/methodology/approach
The study adopted a qualitative research method. A purposive sampling method was used to select study participants, who were administered open-ended questionnaires designed to gather qualitative data. The contents of the data were analysed, presented and reported based on the objectives of the study.
Findings
Some of the construction organisations conducted COVID-19 related risk assessments, whilst a few organisations did not conduct a risk assessment. Inspections to ensure COVID-19 compliance was done by government officials, health organisations and client’s health and safety officers. The construction organisations demonstrated considerable competence in record keeping and some organisations further evolved a follow-up plan for sick workers. The study found that some construction practitioners had misconceptions about the disease, used COVID-19 personal protective equipment incorrectly and lack adequate information about the virus. It is required that construction stakeholders evolve policies and strategies that would promote risk control and foster compliance to COVID-19 safety measures.
Originality/value
COVID-19 is still new, therefore, the body of knowledge is still at the infancy stage. This paper provided insight into the COVID-19 related risk and challenges that may increase the rate of virus infection amongst construction practitioners.
Details
Keywords
Joseph Asante, Ernest Kissi and Edward Badu
The needs assessment is the heart of any capacity-building strategy since it determines the design of any intervention, and also helps to prioritise the allocation of resources…
Abstract
Purpose
The needs assessment is the heart of any capacity-building strategy since it determines the design of any intervention, and also helps to prioritise the allocation of resources. Whereas there is a considerable amount of literature on the challenges faced by small- and medium-scale building contractors (SMBCs), very little is known about the needs (support) required by SMBCs. But given the critical role played by SMBCs in the construction industry demands, an understanding of how this sector can be assisted is required. The purpose of this paper is to contribute to the literature relative to capacity building of SMBCs by exploring and examining the needs with the objective to extend the understanding on how to promote and sustain SMBCs to continue their infrastructural delivery at the local and rural areas in Ghana.
Design/methodology/approach
A questionnaire with five-point Likert scale is administered to 416 respondents, including local government authorities, consultants, first-class contractors and SMBCs using simple random and purposive sampling techniques. Data generated from the survey are analysed using mean score ranking and principal component analysis, thus enabling the findings of the study to be examined under six thematic areas.
Findings
The SMCs needs identified include anti-corruption measures, job accessibility, technical and technological assistance, favourable fiscal policy, business development support and financial assistance. The findings of the study bring to the attention of policy makers the critical areas that required support by the assistance of SMBCs. In the interim, the study recommends the extension of business advisory services to the SMBCs by National Board of Small-Scale Industries, whilst in the long term, the government must create the necessary business operating environment to promote SMBCs pertaining to the industrial sector of the economy. The SMBCs must also factor the needs into their business operations that can be addressed from within.
Originality/value
The study suggests the need of SMBCs in building a robust construction industry in developing countries.
Details
Keywords
The purpose of this study is to propose a methodological approach for modeling catastrophic consequences caused by black swan events, based on complexity science, and framed on…
Abstract
Purpose
The purpose of this study is to propose a methodological approach for modeling catastrophic consequences caused by black swan events, based on complexity science, and framed on Feyerabend’s anarchistic theory of knowledge. An empirical application is presented to illustrate the proposed approach.
Design/methodology/approach
Thom’s nonlinear differential equations of morphogenesis are used to develop a theoretical model of the impact of catastrophes on international business (IB). The model is then estimated using real-world data on the performance of multinational airlines during the SARS-CoV-2 (COVID-19) pandemic.
Findings
The catastrophe model exhibits a remarkable capability to simultaneously capture complex linear and nonlinear relationships. Through empirical estimations and simulations, this approach enables the analysis of IB phenomena under normal conditions, as well as during black swan events.
Originality/value
To the best of the author’s knowledge, this study is the first attempt to estimate the impact of black swan events in IB using a catastrophe model grounded in complexity theory. The proposed model successfully integrates the abrupt and profound effects of catastrophes on multinational corporations, offering a critical perspective on the theoretical and practical use of complexity science in IB.
Details
Keywords
Kassim Alinda, Sulait Tumwine, Twaha Kigongo Kaawaase, Ståle Navrud, Arthur Sserwanga and Irene Nalukenge
The primary objective of this study is to investigate the association between the dimensions of intellectual capital (IC) and sustainability practices (SP) within the context of…
Abstract
Purpose
The primary objective of this study is to investigate the association between the dimensions of intellectual capital (IC) and sustainability practices (SP) within the context of manufacturing medium and large (ML) firms in Uganda. The study aims to shed light on whether and how different dimensions of IC contribute to the adoption and implementation of SP by these firms.
Design/methodology/approach
This study utilized a cross-sectional and quantitative approach, collecting data through a questionnaire survey from a sample of manufacturing ML firms. The collected data underwent analysis to identify patterns and relationships using the SmartPLS structural equation modeling (SEM) technique.
Findings
The findings demonstrated that the three categories of IC (human, structural and relational capital) influence the SP of ML manufacturing enterprises in Uganda. This suggests that IC is a critical component of SP.
Practical implications
Manufacturing enterprises should use their IC to create strategies for sustainable solutions, such as creating new, ecologically and socially responsible products and services and improving current ones to lessen their environmental effect.
Originality/value
This research advances knowledge of SP by revealing if all aspects of IC are significant for the SP of manufacturing enterprises in Uganda.
Details
Keywords
Emmanuel Nsiah Ankomah, Joshua Ayarkwa and Kofi Agyekum
The purpose of this study is to ascertain the extent to which the practices of small and medium building contractors (SMBCs) conform to lean construction (LC) principles…
Abstract
Purpose
The purpose of this study is to ascertain the extent to which the practices of small and medium building contractors (SMBCs) conform to lean construction (LC) principles. Ultimately, practical results encourage a discourse on the true potentials and challenges to the holistic uptake of LC principles in the Ghanaian construction industry.
Design/methodology/approach
This research is based on a qualitative case study approach. The data was obtained through face-to-face structured interviews.
Findings
Across the cases, it was realized that there is a low-level application of LC principles among SMBCs. There was no indication that lean concepts were used on a company-wide basis in the Ghanaian construction industry. Furthermore, the study revealed that the traditional wasteful approach to managing construction projects was still prevalent among the firms.
Practical implications
This paper uses the 4P model as a foundation for assessing the extent to which the practices of SMBCs conform to LC principles. Practically, the study also created a certain level of awareness among the SMBCs about LC, LC principles and the benefits of the application of these principles within organizations.
Originality/value
This study contributes to the body of knowledge as it uncovers the status of LC implementation among SMBCs in the Ghanaian construction industry. The findings that are presented in this paper can be used as a starting point to disseminate the research and practice of LC among SMBCs.
Details
Keywords
J. Ayarkwa, Ayirebi Dansoh, E. Adinyira and P. Amoah
This paper aims to assess the perception of the Ghanaian construction industry of the performance of entry‐level building technology graduates. Also, other non‐technical skills or…
Abstract
Purpose
This paper aims to assess the perception of the Ghanaian construction industry of the performance of entry‐level building technology graduates. Also, other non‐technical skills or attributes expected from building technology graduates are to be compared with the actual proficiency of the graduates.
Design/methodology/approach
The findings in this paper are based on a series of interviews and structured questionnaire survey of randomly selected contractors and consultants in the Ghanaian construction industry.
Findings
The overall performance of the graduates was considered acceptable by the construction industry. However, much more needed to be done in “coordination” and “scheduling” of site activities by graduates who work as site managers, and in “coordination of site activities” and “issuance of site instructions” for those who work as project managers for contractors. There was a considerable gap between the expectations of the construction industry practitioners and the actual proficiency of building technology graduates in “initiative and creativity”, “practical building knowledge”, “ability to define and solve problems”, and other equally important attributes. The graduates, however, met the expectations of contractors in “computer literacy”, “communication skills”, and “interpersonal skills”, and consultants in “computer literacy” and “leadership capability”.
Social implications
The results of the study enable entry‐level graduates to realize their deficiencies for continual improvement, and the training institution to develop training curricula responsive to the needs of the industry.
Originality/value
Even though results from this study generally show a disparity in the expected and actual proficiency levels of building technology graduates, as frequently reported in the literature, it provides a new insight into this problem by providing evidence to the effect that the problem is only manifest in some specific non‐technical skill requirements.
Details
Keywords
Navarani Vejaratnam, Santha Chenayah, Zeeda Fatimah Mohamad and Andrea Appolloni
This study aims to investigate the potential influence of organisational responses to conflicting institutional demands towards barriers to environmental performance (EP…
Abstract
Purpose
This study aims to investigate the potential influence of organisational responses to conflicting institutional demands towards barriers to environmental performance (EP) monitoring of government green procurement (GGP) in Malaysia.
Design/methodology/approach
The paper used a qualitative methodology based on a single case study involving policymakers, procurement officials and a monitoring authority. The study data were analysed drawing on the perspectives of organisational responses to conflicting institutional demands.
Findings
The three key challenges that hindered EP monitoring of GGP in Malaysia were policy irregularities, knowledge asymmetry and communication gaps. These challenges are likely the consequences of the acquiescence, avoidance, compromise and defiance strategies commonly used in dealing with the institutional complexity faced in Malaysia’s public policy arena.
Practical implications
The government, at various institutional levels, may benefit from the theoretical and empirical findings of the case study. Knowledge of barriers can facilitate the policymakers in designing the monitoring process meticulously. Meanwhile, awareness of the influence of organisational responses to institutional complexity on GGP barriers can help redefine field actors’ interests and values in improving policy monitoring. In addition, reporting of the monitored EP bridges the institutional gaps between the macro-state level and the micro-organisational level of GGP, besides increasing the government’s transparency and accountability regarding green procurement.
Social implications
Fewer challenges in the EP monitoring system contribute to an improved GGP policy. In turn, an improved policy may enhance public health and reduce environmental degradation.
Originality/value
The study contributes to the GGP monitoring and institutional theory by showing that barriers to EP monitoring culminate from the organisational response to the institutional demands faced in the policy environment. The authors argue that this is one of the few studies that have examined the barriers to EP monitoring of public policy explicated in the context of organisational responses to institutional demands.
Details
Keywords
The aim of this study is to measure the impact of the factors affecting construction labor productivity by focusing on different types of construction works during and after the…
Abstract
Purpose
The aim of this study is to measure the impact of the factors affecting construction labor productivity by focusing on different types of construction works during and after the COVID-19 pandemic in Turkey, as well as discuss solutions and immediate actions.
Design/methodology/approach
This research was conducted in two steps. First, a quantitative survey was carried out to determine the dimension of factors negatively affecting construction labor productivity and the loss rate of different construction works from the employee perspective. The factors were identified through a literature review. The crucial relationships were highlighted as a result of a statistical analysis. Second, a survey was performed to determine the loss rate through a comparison of man-hour values before and after the beginning of the pandemic from the employer perspective. After an analysis and comparison of the results, semi-structured interviews were performed to discuss all findings and discover ways to mitigate the impacts of COVID-19 on construction labor productivity.
Findings
The results of the study clearly show that construction labor productivity was deeply affected by the coronavirus disease (COVID-19) pandemic. Legal obligations, such as social distancing, wearing masks, and limitations on the number of workers, have been major drivers for lower labor productivity. Such obligations have a profound impact on interior construction works, especially based on teamwork. Concerning employer and labor-related factors, problems with getting payments on time, loss of income, and financial hardships are the leading factors resulting in decreased worker performance. Excavation, insulation, and plastering works were determined as the most affected construction works under the influence of the COVID-19 pandemic.
Research limitations/implications
The quantitative portion of this study is limited to a sample of respondents in the Turkish construction industry. Further research is necessary to provide an in-depth review into construction labor productivity in other countries with a larger respondent sample. Another limitation is sourced by the dynamics of the COVID-19 pandemic, which may turn out that some findings are outdated. Despite these limitations, the insights from this study may enable employers to understand the major drivers and deep impacts of labor productivity loss by uncovering the main vulnerabilities during the pandemic. Recommended measures may also help policy-makers and stakeholders in the construction industry take necessary and immediate actions to ensure better construction labor productivity.
Originality/value
The study may contribute to a better understanding of a pandemic's impact on labor productivity by focusing on both employee and employer perspectives, especially in developing countries. The paper may help employers decide which priority measures are required for each construction work separately. The study is crucial not only for minimizing the negative effects of the COVID-19 outbreak on labor productivity but also for preparing for the post-pandemic era.
Details
Keywords
Salma Husna Zamani, Rahimi A. Rahman, Muhammad Ashraf Fauzi and Liyana Mohamed Yusof
Policymakers are developing government-level pandemic response strategies (GPRS) to assist architecture, engineering and construction (AEC) enterprises. However, the effectiveness…
Abstract
Purpose
Policymakers are developing government-level pandemic response strategies (GPRS) to assist architecture, engineering and construction (AEC) enterprises. However, the effectiveness of the GPRS has not been assessed. Therefore, this study aims to investigate the interrelationships between GPRS and AEC enterprises. To achieve that aim, the study objectives are to compare GPRS effectiveness between small-medium and large AEC enterprises, develop groupings to categorize interrelated GPRS and evaluate the effectiveness of the GPRS and interrelated constructs.
Design/methodology/approach
A systematic literature review and semi-structured interviews with 40 AEC industry professionals were carried out, generating 22 GPRS. Then, questionnaire survey data was collected among AEC professionals. In total, 114 valid survey answers were received and analyzed using the Kruskal–Wallis H test, normalized mean analysis, factor analysis and fuzzy synthetic evaluation.
Findings
Small-medium enterprises have four distinct critical GPRS: “form a special task force to provide support in maneuvering COVID-19,” “provide infrastructure investment budgets to local governments,” “develop employee assistance programs that fit all types of working groups” and “diversify existing supply chain.” Large enterprises have two distinct critical GPRS: “provide help in digitalizing existing construction projects” and “mandate COVID-19 as force majeure.” Eighteen GPRS can be categorized into the following five constructs: “market stability and financial aid,” “enterprise capability management,” “supply chain improvement,” “law and policy resources” and “information and workforce management.” The former two constructs are more effective than other GPRS constructs.
Originality/value
This is the first paper that evaluates the effectiveness of GPRS for AEC enterprises, providing new evidence to policymakers for well-informed decision-making in developing pandemic response strategies.