Search results

1 – 10 of 407
Open Access
Article
Publication date: 15 November 2023

James Kanyepe, Brave Zizhou, Mikel Alphaneta and Neater Chifamba

This study examines the moderating role of information sharing on the effect of lead-time management on the performance of firms in the Zimbabwean motor industry.

Abstract

Purpose

This study examines the moderating role of information sharing on the effect of lead-time management on the performance of firms in the Zimbabwean motor industry.

Design/methodology/approach

Data were collected using Likert-based structured questionnaires from a sample of 105 employees in Zimbabwe. In addition, Pearson Correlation, Linear Regression and Moderation Regression analysis were employed to test the relationship between study variables.

Findings

The study found that fixed lead time, preprocessing lead time, processing lead time and postprocessing lead time significantly influence the performance of firms in the motor industry. The results also demonstrate that information sharing moderates the effect of lead-time management on firm performance in the motor industry.

Practical implications

Firms in the motor industry should establish long-term relationships with their suppliers and implement effective communication channels for timely and frequent information exchange regarding production schedules, inventory levels, quality standards and potential disruptions.

Originality/value

The current study aims to contribute to the scientific discourse on lead-time management, information sharing and performance in the motor industry. Furthermore, it extends knowledge on the performance of the motor industry in the African region.

Details

European Journal of Management Studies, vol. 28 no. 3
Type: Research Article
ISSN: 2183-4172

Keywords

Open Access
Article
Publication date: 9 October 2023

Mingyao Sun and Tianhua Zhang

A real-time production scheduling method for semiconductor back-end manufacturing process becomes increasingly important in industry 4.0. Semiconductor back-end manufacturing…

Abstract

Purpose

A real-time production scheduling method for semiconductor back-end manufacturing process becomes increasingly important in industry 4.0. Semiconductor back-end manufacturing process is always accompanied by order splitting and merging; besides, in each stage of the process, there are always multiple machine groups that have different production capabilities and capacities. This paper studies a multi-agent based scheduling architecture for the radio frequency identification (RFID)-enabled semiconductor back-end shopfloor, which integrates not only manufacturing resources but also human factors.

Design/methodology/approach

The architecture includes a task management (TM) agent, a staff instruction (SI) agent, a task scheduling (TS) agent, an information management center (IMC), machine group (MG) agent and a production monitoring (PM) agent. Then, based on the architecture, the authors developed a scheduling method consisting of capability & capacity planning and machine configuration modules in the TS agent.

Findings

The authors used greedy policy to assign each order to the appropriate machine groups based on the real-time utilization ration of each MG in the capability & capacity (C&C) planning module, and used a partial swarm optimization (PSO) algorithm to schedule each splitting job to the identified machine based on the C&C planning results. At last, we conducted a case study to demonstrate the proposed multi-agent based real-time production scheduling models and methods.

Originality/value

This paper proposes a multi-agent based real-time scheduling framework for semiconductor back-end industry. A C&C planning and a machine configuration algorithm are developed, respectively. The paper provides a feasible solution for semiconductor back-end manufacturing process to realize real-time scheduling.

Details

IIMBG Journal of Sustainable Business and Innovation, vol. 1 no. 1
Type: Research Article
ISSN: 2976-8500

Keywords

Open Access
Book part
Publication date: 18 July 2022

Fabian Akkerman, Eduardo Lalla-Ruiz, Martijn Mes and Taco Spitters

Cross-docking is a supply chain distribution and logistics strategy for which less-than-truckload shipments are consolidated into full-truckload shipments. Goods are stored up to…

Abstract

Cross-docking is a supply chain distribution and logistics strategy for which less-than-truckload shipments are consolidated into full-truckload shipments. Goods are stored up to a maximum of 24 hours in a cross-docking terminal. In this chapter, we build on the literature review by Ladier and Alpan (2016), who reviewed cross-docking research and conducted interviews with cross-docking managers to find research gaps and provide recommendations for future research. We conduct a systematic literature review, following the framework by Ladier and Alpan (2016), on cross-docking literature from 2015 up to 2020. We focus on papers that consider the intersection of research and industry, e.g., case studies or studies presenting real-world data. We investigate whether the research has changed according to the recommendations of Ladier and Alpan (2016). Additionally, we examine the adoption of Industry 4.0 practices in cross-docking research, e.g., related to features of the physical internet, the Internet of Things and cyber-physical systems in cross-docking methodologies or case studies. We conclude that only small adaptations have been done based on the recommendations of Ladier and Alpan (2016), but we see growing attention for Industry 4.0 concepts in cross-docking, especially for physical internet hubs.

Open Access
Article
Publication date: 13 June 2022

Jarrod Goentzel, Timothy Russell, Henrique Ribeiro Carretti and Yuto Hashimoto

The COVID-19 pandemic has forced countries to consider how to reach vulnerable communities with extended outreach services to improve vaccination uptake. The authors created an…

Abstract

Purpose

The COVID-19 pandemic has forced countries to consider how to reach vulnerable communities with extended outreach services to improve vaccination uptake. The authors created an optimization model to align with decision-makers' objective to maximize immunization coverage within constrained budgets and deploy resources considering empirical data and endogenous demand.

Design/methodology/approach

A mixed integer program (MIP) determines the location of outreach sites and the resource deployment across health centers and outreach sites. The authors validated the model and evaluated the approach in consultation with UNICEF using a case study from The Gambia.

Findings

Results in The Gambia showed that by opening new outreach sites and optimizing resource allocation and scheduling, the Ministry of Health could increase immunization coverage from 91.0 to 97.1% under the same budget. Case study solutions informed managerial insights to drive gains in vaccine coverage even without the application of sophisticated tools.

Originality/value

The research extended resource constrained LMIC vaccine distribution modeling literature in two ways: first, endogenous calculation of demand as a function of distance to health facility location enabled the effective design of the vaccine network around convenience to the community and second, the model's resource bundle concept more accurately and flexibly represented complex requirements and costs for specific resources, which facilitated buy-in from stakeholders responsible for managing health budgets. The paper also demonstrated how to leverage empirical research and spatial analysis of publicly available demographic and geographic data to effectively represent important contextual factors.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 13 no. 2
Type: Research Article
ISSN: 2042-6747

Keywords

Open Access
Article
Publication date: 12 January 2024

Patrik Jonsson, Johan Öhlin, Hafez Shurrab, Johan Bystedt, Azam Sheikh Muhammad and Vilhelm Verendel

This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?

Abstract

Purpose

This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?

Design/methodology/approach

A mixed-method case approach is applied. Explanatory variables are identified from the literature and explored in a qualitative analysis at an automotive original equipment manufacturer. Using logistic regression and random forest classification models, quantitative data (historical schedule transactions and internal data) enables the testing of the predictive difference of variables under various planning horizons and inaccuracy levels.

Findings

The effects on delivery schedule inaccuracies are contingent on a decoupling point, and a variable may have a combined amplifying (complexity generating) and stabilizing (complexity absorbing) moderating effect. Product complexity variables are significant regardless of the time horizon, and the item’s order life cycle is a significant variable with predictive differences that vary. Decoupling management is identified as a mechanism for generating complexity absorption capabilities contributing to delivery schedule accuracy.

Practical implications

The findings provide guidelines for exploring and finding patterns in specific variables to improve material delivery schedule inaccuracies and input into predictive forecasting models.

Originality/value

The findings contribute to explaining material delivery schedule variations, identifying potential root causes and moderators, empirically testing and validating effects and conceptualizing features that cause and moderate inaccuracies in relation to decoupling management and complexity theory literature?

Details

International Journal of Operations & Production Management, vol. 44 no. 13
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 19 April 2022

Liwei Ju, Zhe Yin, Qingqing Zhou, Li Liu, Yushu Pan and Zhongfu Tan

This study aims to form a new concept of power-to-gas-based virtual power plant (GVPP) and propose a low-carbon economic scheduling optimization model for GVPP considering carbon…

Abstract

Purpose

This study aims to form a new concept of power-to-gas-based virtual power plant (GVPP) and propose a low-carbon economic scheduling optimization model for GVPP considering carbon emission trading.

Design/methodology/approach

In view of the strong uncertainty of wind power and photovoltaic power generation in GVPP, the information gap decision theory (IGDT) is used to measure the uncertainty tolerance threshold under different expected target deviations of the decision-makers. To verify the feasibility and effectiveness of the proposed model, nine-node energy hub was selected as the simulation system.

Findings

GVPP can coordinate and optimize the output of electricity-to-gas and gas turbines according to the difference in gas and electricity prices in the electricity market and the natural gas market at different times. The IGDT method can be used to describe the impact of wind and solar uncertainty in GVPP. Carbon emission rights trading can increase the operating space of power to gas (P2G) and reduce the operating cost of GVPP.

Research limitations/implications

This study considers the electrical conversion and spatio-temporal calming characteristics of P2G, integrates it with VPP into GVPP and uses the IGDT method to describe the impact of wind and solar uncertainty and then proposes a GVPP near-zero carbon random scheduling optimization model based on IGDT.

Originality/value

This study designed a novel structure of the GVPP integrating P2G, gas storage device into the VPP and proposed a basic near-zero carbon scheduling optimization model for GVPP under the optimization goal of minimizing operating costs. At last, this study constructed a stochastic scheduling optimization model for GVPP.

Details

International Journal of Climate Change Strategies and Management, vol. 15 no. 2
Type: Research Article
ISSN: 1756-8692

Keywords

Open Access
Article
Publication date: 9 February 2024

Armando Calabrese, Antonio D'Uffizi, Nathan Levialdi Ghiron, Luca Berloco, Elaheh Pourabbas and Nathan Proudlove

The primary objective of this paper is to show a systematic and methodological approach for the digitalization of critical clinical pathways (CPs) within the healthcare domain.

Abstract

Purpose

The primary objective of this paper is to show a systematic and methodological approach for the digitalization of critical clinical pathways (CPs) within the healthcare domain.

Design/methodology/approach

The methodology entails the integration of service design (SD) and action research (AR) methodologies, characterized by iterative phases that systematically alternate between action and reflective processes, fostering cycles of change and learning. Within this framework, stakeholders are engaged through semi-structured interviews, while the existing and envisioned processes are delineated and represented using BPMN 2.0. These methodological steps emphasize the development of an autonomous, patient-centric web application alongside the implementation of an adaptable and patient-oriented scheduling system. Also, business processes simulation is employed to measure key performance indicators of processes and test for potential improvements. This method is implemented in the context of the CP addressing transient loss of consciousness (TLOC), within a publicly funded hospital setting.

Findings

The methodology integrating SD and AR enables the detection of pivotal bottlenecks within diagnostic CPs and proposes optimal corrective measures to ensure uninterrupted patient care, all the while advancing the digitalization of diagnostic CP management. This study contributes to theoretical discussions by emphasizing the criticality of process optimization, the transformative potential of digitalization in healthcare and the paramount importance of user-centric design principles, and offers valuable insights into healthcare management implications.

Originality/value

The study’s relevance lies in its ability to enhance healthcare practices without necessitating disruptive and resource-intensive process overhauls. This pragmatic approach aligns with the imperative for healthcare organizations to improve their operations efficiently and cost-effectively, making the study’s findings relevant.

Details

European Journal of Innovation Management, vol. 27 no. 9
Type: Research Article
ISSN: 1460-1060

Keywords

Open Access
Article
Publication date: 26 May 2023

Mpho Trinity Manenzhe, Arnesh Telukdarie and Megashnee Munsamy

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

1703

Abstract

Purpose

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

Design/methodology/approach

The extant literature in physical assets maintenance depicts that poor maintenance management is predominantly because of a lack of a clearly defined maintenance work management process model, resulting in poor management of maintenance work. This paper solves this complex phenomenon using a combination of conceptual process modeling and system dynamics simulation incorporating 4IR technologies. A process for maintenance work management and its control actions on scheduled maintenance tasks versus unscheduled maintenance tasks is modeled, replicating real-world scenarios with a digital lens (4IR technologies) for predictive maintenance strategy.

Findings

A process for maintenance work management is thus modeled and simulated as a dynamic system. Post-model validation, this study reveals that the real-world maintenance work management process can be replicated using system dynamics modeling. The impact analysis of 4IR technologies on maintenance work management systems reveals that the implementation of 4IR technologies intensifies asset performance with an overall gain of 27.46%, yielding the best maintenance index. This study further reveals that the benefits of 4IR technologies positively impact equipment defect predictability before failure, thereby yielding a predictive maintenance strategy.

Research limitations/implications

The study focused on maintenance work management system without the consideration of other subsystems such as cost of maintenance, production dynamics, and supply chain management.

Practical implications

The maintenance real-world quantitative data is retrieved from two maintenance departments from company A, for a period of 24 months, representing years 2017 and 2018. The maintenance quantitative data retrieved represent six various types of equipment used at underground Mines. The maintenance management qualitative data (Organizational documents) in maintenance management are retrieved from company A and company B. Company A is a global mining industry, and company B is a global manufacturing industry. The reliability of the data used in the model validation have practical implications on how maintenance work management system behaves with the benefit of 4IR technologies' implementation.

Social implications

This research study yields an overall benefit in asset management, thereby intensifying asset performance. The expected learnings are intended to benefit future research in the physical asset management field of study and most important to the industry practitioners in physical asset management.

Originality/value

This paper provides for a model in which maintenance work and its dynamics is systematically managed. Uncontrollable corrective maintenance work increases the complexity of the overall maintenance work management. The use of a system dynamic model and simulation incorporating 4IR technologies adds value on the maintenance work management effectiveness.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 20 July 2020

Mehmet Fatih Uslu, Süleyman Uslu and Faruk Bulut

Optimization algorithms can differ in performance for a specific problem. Hybrid approaches, using this difference, might give a higher performance in many cases. This paper…

1349

Abstract

Optimization algorithms can differ in performance for a specific problem. Hybrid approaches, using this difference, might give a higher performance in many cases. This paper presents a hybrid approach of Genetic Algorithm (GA) and Ant Colony Optimization (ACO) specifically for the Integrated Process Planning and Scheduling (IPPS) problems. GA and ACO have given different performances in different cases of IPPS problems. In some cases, GA has outperformed, and so do ACO in other cases. This hybrid method can be constructed as (I) GA to improve ACO results or (II) ACO to improve GA results. Based on the performances of the algorithm pairs on the given problem scale. This proposed hybrid GA-ACO approach (hAG) runs both GA and ACO simultaneously, and the better performing one is selected as the primary algorithm in the hybrid approach. hAG also avoids convergence by resetting parameters which cause algorithms to converge local optimum points. Moreover, the algorithm can obtain more accurate solutions with avoidance strategy. The new hybrid optimization technique (hAG) merges a GA with a local search strategy based on the interior point method. The efficiency of hAG is demonstrated by solving a constrained multi-objective mathematical test-case. The benchmarking results of the experimental studies with AIS (Artificial Immune System), GA, and ACO indicate that the proposed model has outperformed other non-hybrid algorithms in different scenarios.

Details

Applied Computing and Informatics, vol. 18 no. 1/2
Type: Research Article
ISSN: 2210-8327

Keywords

Open Access
Article
Publication date: 11 May 2015

Yingli Wang, Vasco Sanchez Rodrigues and Leighton Evans

The purpose of this paper is to investigate empirically how information and communication technologies (ICT) can contribute to reduction of CO2 emissions in road freight transport…

12635

Abstract

Purpose

The purpose of this paper is to investigate empirically how information and communication technologies (ICT) can contribute to reduction of CO2 emissions in road freight transport and to identify opportunities for further improvements.

Design/methodology/approach

This research adopts a multiple case study approach with three leading UK grocery retailers as exemplars of fast-moving consumer goods retailers, conducted using multiple data collection techniques including interviews, system demonstrations, onsite observations and the use of archive information.

Findings

ICT solutions have a direct positive impact on CO2 emissions reduction but opportunities to further reduce CO2 emissions are perceived as lying beyond retailers’ own distribution networks. These opportunities are not fully utilised due to the complexities of collaborative ICT provisions and retailers’ reluctance to share information with competitors.

Research limitations/implications

A limitation of the study is that it is exploratory and only three cases were examined. Even though these three retailers represent over 60 per cent of the UK grocery retail sector, other retailers may deploy significantly different ICT applications.

Practical implications

The research provides an overarching insight for businesses on how to leverage the existing and emerging information technologies for environmental and economic benefits.

Originality/value

While sustainability issues have received increasing attention recently, the role of ICT in freight transport for CO2 emissions reduction has not been investigated in depth and its impact is largely unknown. This research advances understanding about how ICT contributes CO2 emissions reductions and provides a framework for further investigation.

Details

The International Journal of Logistics Management, vol. 26 no. 1
Type: Research Article
ISSN: 0957-4093

Keywords

1 – 10 of 407