Search results
1 – 10 of over 4000A.B.M. Zohrul Kabir and Ahmed S. Al‐Olayan
A new policy for joint optimization of age replacement and spareprovisioning has been proposed by incorporating a continuous review(s, S) type inventory policy, where s is the…
Abstract
A new policy for joint optimization of age replacement and spare provisioning has been proposed by incorporating a continuous review (s, S) type inventory policy, where s is the reorder level and S is the maximum stock level. Gives cost formulations for a single operating unit situation and outlines simulation procedure to determine optimal values of the decision variables by minimizing total cost of replacement and inventory. Studies the behaviour of this policy for a large number of case problems and highlights the effects of different cost elements, item failure characteristics and lead time characteristics. Also determines, for all case problems, optimal (s, S) policies to support Barlow‐Proschan age policy. Simulation results clearly indicate that the jointly optimal policy is more cost‐effective than Barlow‐Proschan policy.
Details
Keywords
The purpose of this paper is the simultaneous determination of optimal replacement threshold and inspection scheme for a system within condition-based maintenance (CBM) framework.
Abstract
Purpose
The purpose of this paper is the simultaneous determination of optimal replacement threshold and inspection scheme for a system within condition-based maintenance (CBM) framework.
Design/methodology/approach
A proportional hazards model (PHM) is used for risk of failure and a Markovian process to model the system covariates. Total expected long-run cost (including replacement, inspection and downtime costs) is formulated in terms of replacement threshold and inspection scheme. Through an iterative procedure, for all different values of replacement thresholds, their associated optimal inspection scheme is determined using an effective search algorithm. By evaluating the corresponding costs, the optimal replacement threshold and its associated optimal inspection scheme are, then, identified.
Findings
The mathematical formulation, that takes into account all different costs, required for the simultaneous determination of optimal replacement threshold and optimal inspection scheme for an item subjected to CBM using PHM is provided. The proposed approach is compared against classical age policy and one state-of-the-art policy through a numerical example. The results show that the proposed approach outperforms other comparing policies.
Practical implications
In practical situations where CBM is implemented, inspections and downtime often incur cost. Under such circumstances, findings of this paper can be utilized for the determination of optimal replacement threshold and optimal inspection scheme so that the CBM cost is minimized.
Originality/value
In most of the reported researches, it is often assumed that inspections have no cost and/or that the time for replacements (either preventive or at failure) is negligible. In the contrary, in this paper the author takes all cost factors including inspection costs, replacement time(s) and their associated downtime costs into account in the simultaneous determination of optimal replacement threshold and optimal inspection scheme.
Details
Keywords
We formulate a multi‐attribute decision model for preventive replacement of a “magnetic sealing head” in a soft‐drink producing factory in the Kingdom of Saudi Arabia. In case of…
Abstract
We formulate a multi‐attribute decision model for preventive replacement of a “magnetic sealing head” in a soft‐drink producing factory in the Kingdom of Saudi Arabia. In case of failure of this part, the opportunity cost (for production losses) is very important, as the entire production line will be idle. We determine in a first case the replacement policy that minimizes the total expected unit cost of replacement (preventive and corrective). Next, we determine the optimal policy that maximizes the expected multi‐attribute utility of the decision‐maker in the factory. Four attributes are considered in the replacement problem, namely cost, quality, labor productivity, and cash flow availability. The optimal policy in each case outperforms by far the one applied in the plant, which turns out to be costly and inefficient with respect to the utility of the decision‐maker.
Details
Keywords
The purpose of this paper is to study a geometric process (GP) maintenance model and policy for a repairable system.
Abstract
Purpose
The purpose of this paper is to study a geometric process (GP) maintenance model and policy for a repairable system.
Design/methodology/approach
Lam first introduced the GP and its application to maintenance model. Assume that a replacement policy N is applied by which the system will be replaced by a new, identical one following the Nth failure.
Findings
For a deteriorating system, an optimal replacement policy is determined analytically, and the monotonicity properties of the optimal replacement policy are then studied.
Originality/value
For an improving system, the paper shows that the optimal replacement policy is the ∞ policy, i.e., the policy without replacement.
Details
Keywords
Hamid Reza Golmakani and Morteza Pouresmaeeli
The purpose of this paper is to determine optimal replacement threshold and optimal inspection interval for an item subjected to condition-based maintenance (CBM). The primarily…
Abstract
Purpose
The purpose of this paper is to determine optimal replacement threshold and optimal inspection interval for an item subjected to condition-based maintenance (CBM). The primarily assumption is that the item's failure replacement cost depends on the item's degradation state at which failure occurs and/or the time the item fails. The cost of inspection is also taken into account.
Design/methodology/approach
The control limit replacement policy framework, already reported by some research referred to in this paper, is first extended to include the non-decreasing failure replacement cost assumption. Then, for alternative inspection intervals, replacement thresholds together with their associated total cost including the inspection cost are computed. By comparing the total costs, the optimal inspection interval and its corresponding optimal replacement threshold are simultaneously identified.
Findings
The mathematical formulation required for the determination of optimal replacement threshold and optimal inspection interval for an item subjected to CBM under the assumption of non-decreasing failure cost is provided.
Practical implications
In some practical situations where CBM is implemented, the failure replacement cost may depend on the time the failure happens and/or may depend on the system's degradation state. In addition, inspections often incur cost. Under such circumstances, findings of this paper can be utilized for the determination of optimal replacement threshold and optimal inspection interval for the underlying system.
Originality/value
Using the approach proposed in this paper, one could obtain the optimal replacement threshold and the optimal inspection interval for a system subjected to CBM.
Details
Keywords
Hasnida Ab-Samat and Shahrul Kamaruddin
This paper reviews the literature on opportunistic maintenance (OM) as new advance maintenance approach and policy. The purpose of this paper is to conceptually identify common…
Abstract
Purpose
This paper reviews the literature on opportunistic maintenance (OM) as new advance maintenance approach and policy. The purpose of this paper is to conceptually identify common principle and thereby provide absolute definition, concept and characteristics of this policy.
Design/methodology/approach
A conceptual analysis was conducted on various literatures to clarify a number of principle and concepts as a method for understanding information on OM. The analysis involves the process of separating the compound terms used in the literatures into a few parts, analyse them and then recombining them to have more clear understanding of the policy.
Findings
The paper discussed the maintenance approach, genealogy, principle, concept and applications of OM both in numerical analysis and real industry. OM policy is developed based on combination of age replacement policy and block replacement policy and in practical; OM is applied as the combination of corrective maintenance which is applied when any failure occurred, with preventive maintenance (PM) – a planned and scheduled maintenance approach to prevent failure to happen. Any machine shutdown or stoppages due to failure is the “opportunity” to conduct PM even though it is not as planned. The characterization of OM was provided in order to present its theoretical novelty for researchers and practical significance for industries.
Practical implications
To date, there is no publication that reviews the OM in-depth and provides clear understanding on the topic. Therefore, this paper aims to show lineage of OM and the current trend in researches. This discussion will pave the way of new research areas on this optimal maintenance policy. Clear definition and principle of OM provided in this paper will trigger interest in its practicality as well as aid industries to understand and conduct OM in operation plant.
Originality/value
This paper discussed the available literature about OM in various perspectives and scopes for further understanding of the topic by maintenance management professionals and researchers. Therefore, OM can be widely studied and applied in real industry as it is an effective and optimal maintenance policy.
Details
Keywords
Zouheir Malki, Daoud Ait-Kadi and Mohamed-Salah Ouali
The purpose of this paper is to investigate age replacement policies for two-component parallel system with stochastic dependence. The stochastic dependence considered, is modeled…
Abstract
Purpose
The purpose of this paper is to investigate age replacement policies for two-component parallel system with stochastic dependence. The stochastic dependence considered, is modeled by a one-sided domino effect. The failure of component 1 at instant t may induce the failure of component 2 at instant t+τ with probability p 1→2. The time delay τ is a random variable with known probability density function h p 1→2 (.). The system is considered in a failed state when both components are failed. The proposed replacement policies suggest to replace the system upon failure or at age T whichever occurs first.
Design/methodology/approach
In the first policy, costs and durations associated with maintenance activities are supposed to be constant. In the second replacement policy, the preventive replacement cost depends on the system’s state and age. The expected cost per unit of time over an infinite span is derived and numerical examples are presented.
Findings
In this paper and especially in the second policy, the authors find that the authors can get a more economical policy if the authors consider that the preventive replacement cost is not constant but depends on T.
Originality/value
In this paper, the authors take into account of the stochastic dependence between system components. This dependence affects the global reliability of the system and replacement’s periodicity. It can be used to measure the performance of the system et introduced into design phase of the system.
Details
Keywords
Wenfeng Wu, Jianshe Song, Kexia Jiang and Hao Li
This paper aims to study the maintenance and replacement problem for a deteriorating repairable system with multiple vacations of one repairman. It proposes a new replacement…
Abstract
Purpose
This paper aims to study the maintenance and replacement problem for a deteriorating repairable system with multiple vacations of one repairman. It proposes a new replacement policy and establishes corresponding replacement models.
Design/methodology/approach
It is assumed that the repair after the system failures is not “as good as new” and the repairman is in multiple vacations. The reaching of the effective age of the system is assumed to be mutually stochastic at working state, waiting state for repair and being repaired state. Under these assumptions, a replacement policy based on the effective age of the system is applied. The long-run expected downtime per unit time and the long-run expected profit per unit time as objective functions are chosen, respectively. By using geometric process theory and renewal process theory, the mathematic models have been established and the explicit expressions of the long-run expected downtime per unit time and the long-run expected profit per unit time are derived, respectively.
Findings
The optimal replacement policy can be calculated and determined by the computer to minimize the expected downtime or maximize the expected profit. The minimum expected downtime per unit time and maximum expected profit per unit time can also be determined.
Originality/value
This replacement policy and mathematic models can be used as reference to the failure system maintenance and replacement.
Details
Keywords
Hamid Reza Golmakani and Fahimeh Fattahipour
This paper aims to address the effect of inspection intervals on cost function in condition‐based maintenance (CBM) and show how selecting an appropriate inspection scheme may…
Abstract
Purpose
This paper aims to address the effect of inspection intervals on cost function in condition‐based maintenance (CBM) and show how selecting an appropriate inspection scheme may reduce the cost associated to a CBM program.
Design/methodology/approach
In CBM, replacement policy is often defined as a threshold for replacement or leaving an item in operation until next inspection, depending on monitoring information. The control limit replacement policy framework, already reported by some research referred to in this paper, is utilized to determine the optimal replacement threshold. Having released the assumption that the inspections are performed at fixed and constant intervals, an iterative procedure is proposed to evaluate alternative inspection schemes and their associated total average cost of replacements and inspections.
Findings
The paper proposes an approach in which preventive and failure replacement costs as well as inspection cost are taken into account to determine the optimal replacement policy and an age‐based inspection scheme such that the total average cost of replacements and inspections is minimized.
Practical implications
In many practical situations where CBM is implemented, e.g. manufacturing processes, inspections require labor, specific test devices, and sometimes suspension of the operations. Thus, when inspection cost is considerable, by applying the proposed approach, one can obtain an inspection scheme that reduces the cost.
Originality/value
Using the approach proposed in the paper, a cost‐effective age‐based inspection scheme for a system under CBM is determined.
Details
Keywords
Imad Alsyouf, Sadeque Hamdan, Mohammad Shamsuzzaman, Salah Haridy and Iyad Alawaysheh
This paper develops a framework for selecting the most efficient and effective preventive maintenance policy using multiple-criteria decision making and multi-objective…
Abstract
Purpose
This paper develops a framework for selecting the most efficient and effective preventive maintenance policy using multiple-criteria decision making and multi-objective optimization.
Design/methodology/approach
The critical component is identified with a list of maintenance policies, and then its failure data are collected and the optimization objective functions are defined. Fuzzy AHP is used to prioritize each objective based on the experts' questionnaire. Weighted comprehensive criterion method is used to solve the multi-objective models for each policy. Finally, the effectiveness and efficiency are calculated to select the best maintenance policy.
Findings
For a fleet of buses in hot climate environment where coolant pump is identified as the most critical component, it was found that block-GAN policy is the most efficient and effective one with a 10.24% of cost saving and 0.34 expected number of failures per cycle compared to age policy and block-BAO policy.
Research limitations/implications
Only three maintenance policies are compared and studied. Other maintenance policies can also be considered in future.
Practical implications
The proposed methodology is implemented in UAE for selecting a maintenance scheme for a critical component in a fleet of buses. It can be validated later in other Gulf countries.
Originality/value
This research lays a solid foundation for selecting the most efficient and effective preventive maintenance policy for different applications and sectors using MCDM and multi-objective optimization to improve reliability and avoid economic loss.
Details