Search results

1 – 10 of over 122000
Article
Publication date: 1 March 2013

Erin T. Ryan, David R. Jacques, Jonathan D. Ritschel and Christine M. Schubert

For decades, the Department of Defense (DoD) has employed numerous reporting and monitoring tools for characterizing the acquisition cost estimates of its programs. These tools…

Abstract

For decades, the Department of Defense (DoD) has employed numerous reporting and monitoring tools for characterizing the acquisition cost estimates of its programs. These tools have led to dozens of studies thoroughly documenting the magnitude and extent of DoD acquisition cost growth. However, little attention has been paid to the behavior of the other main cost component of a system's life cycle cost: Operating and Support (O&S) costs. Consequently, the DoD has little knowledge regarding the accuracy of O&S cost estimates or how that accuracy changes over time. In a previous paper, the authors described an analytical methodology for remedying this deficiency via a study to characterize the historical accuracy of O&S cost estimates. The results are presented here, and indicate there tend to be large errors in DoD O&S cost estimates, and that the accuracy of the estimates improves little over time

Details

Journal of Public Procurement, vol. 13 no. 1
Type: Research Article
ISSN: 1535-0118

Article
Publication date: 1 October 2004

Myles P. Gartland and Cathryn A. Carroll

This paper aims to evaluate the relationship between capitation payment methodology and the physician organization cost function. The paper provides evidence supporting a positive…

Abstract

This paper aims to evaluate the relationship between capitation payment methodology and the physician organization cost function. The paper provides evidence supporting a positive relationship between overhead rates and the level of capitation. Based on sample data, US medical practices whose net medical revenue consists of 11 percent or more capitation payments have significantly higher overhead costs per physician FTE.

Details

Journal of Health Organization and Management, vol. 18 no. 5
Type: Research Article
ISSN: 1477-7266

Keywords

Article
Publication date: 2 October 2017

Rajkumar Bhimgonda Patil, Basavraj S. Kothavale, Laxman Yadu Waghmode and Shridhar G. Joshi

The paper presents reliability, maintainability and life cycle cost (LCC) analysis of a computerized numerical control (CNC) turning center which is manufactured and used in…

Abstract

Purpose

The paper presents reliability, maintainability and life cycle cost (LCC) analysis of a computerized numerical control (CNC) turning center which is manufactured and used in India. The purpose of this paper is to identify the critical components/subsystems from reliability and LCC perspective. The paper further aims at improving reliability and LCC by implementing reliability-improvement methods.

Design/methodology/approach

This paper uses a methodology for the reliability analysis based on the assessment of trends in maintenance data. The data required for reliability and LCC analysis are collected from the manufacturers and users of CNC turning center over a period of eight years. ReliaSoft’s Weibull++9 software has been used for verifying goodness of fit and estimating parameters of the distribution. The LCC of the system is estimated for five cost elements: acquisition cost, operation cost, failure cost, support cost and net salvage value.

Findings

The analysis shows that the spindle bearing, spindle belt, spindle drawbar, insert, tool holder, drive battery, hydraulic hose, lubricant hose, coolant hose and solenoid valve are the components with low reliability. With certain design changes and implementation of reliability-based maintenance policies, system reliability is improved, especially during warranty period. The reliability of the CNC turning center is improved by nearly 45 percent at the end of warranty period and system mean time between failure is increased from 15,000 to 17,000 hours. The LCC analysis reveals that the maintenance cost, operating cost and support costs dominate the LCC and contribute to the tune of 87 percent of the total LCC.

Research limitations/implications

The proposed methodology provides an excellent tool that can be utilized in industries, where safety, reliability, maintainability and availability of the system play a vital role. The approach may be improved by collecting data from more number of users of the CNC turning centers.

Practical implications

The approach presented in this paper is generic and can be applied to analyze the repairable systems. A real case study is presented to show the applicability of the approach.

Originality/value

The proposed methodology provides a practical approach for the analysis of time-to-failure and time-to-repair data based on the assessment of trends in the maintenance data. The methodology helps in selecting a proper approach of the analysis such as Bayesian method, parametric methods and nonparametric methods.

Details

International Journal of Quality & Reliability Management, vol. 34 no. 9
Type: Research Article
ISSN: 0265-671X

Keywords

Content available
Article
Publication date: 3 August 2018

Scott C. Hewitson, Jonathan D. Ritschel, Edward White and Gregory Brown

Recent legislation resulted in an elevation of operating and support (O&S) costs’ relative importance for decision-making in Department of Defense programs. However, a lack of…

1779

Abstract

Purpose

Recent legislation resulted in an elevation of operating and support (O&S) costs’ relative importance for decision-making in Department of Defense programs. However, a lack of research in O&S hinders a cost analyst’s abilities to provide accurate sustainment estimates. Thus, the purpose of this paper is to investigate when Air Force aircraft O&S costs stabilize and to what degree. Next, a parametric O&S model is developed to predict median O&S costs for use as a new tool for cost analyst practitioners.

Design/methodology/approach

Utilizing the Air Force total ownership cost database, 44 programs consisting of 765 observations from 1996 to 2016 are analyzed. First, stability is examined in three areas: total O&S costs, the six O&S cost element structures and by aircraft type. Next, stepwise regression is used to predict median O&S costs per total active inventory (CPTAI) and identify influential variables.

Findings

Stability results vary by category but generally are found to occur approximately five years from initial operating capability. The regression model explains 89.01 per cent of the variance in the data set when predicting median O&S CPTAI. Aircraft type, location of lead logistics center and unit cost are the three largest contributing factors.

Originality/value

Results from this research provide insight to cost analysts on when to start using actual O&S costs as a baseline for estimates in lieu of analogous cost program data and also derives a new parametric O&S estimating tool designed as a cross-check to current estimating methodologies.

Details

Journal of Defense Analytics and Logistics, vol. 2 no. 1
Type: Research Article
ISSN: 2399-6439

Keywords

Article
Publication date: 31 July 2018

Aruna Apte and Keenan Yoho

The purpose of this paper is to present a model for selecting specific assets to be used in relief and disaster response missions based on the capabilities of, and contributions…

Abstract

Purpose

The purpose of this paper is to present a model for selecting specific assets to be used in relief and disaster response missions based on the capabilities of, and contributions to, the demanded need for humanitarian assistance and disaster relief. During past disasters, the US Navy (USN) has responded with whatever ships were in the area regardless of their contribution to the need. The authors use data from the USN that has been gathered in other studies as an illustration of how the model may be applied to allocate the most useful vessels at the lowest cost.

Design/methodology/approach

A simple optimization model is used that utilizes scored capabilities as well as the estimated costs associated with US Naval vessels that will allocate the most useful assets at the lowest economic cost.

Findings

The model selects the most effective assets while minimizing the estimated economic cost. The US Naval assets that contribute the most effective humanitarian assistance and disaster response capability at the lowest cost are amphibious ships, leased commercial vessels and ready reserve force cargo ships.

Originality/value

This research fills a critical gap in the literature as there is no research that takes into account national Navy capability and proposes a solution to find those assets that are most mission and cost effective. As the USN looks for ways to cut costs while meeting mission priorities it will be necessary to determine which ship classes and types contribute the most while saving cost. The model introduced in this research provides insight into where investments should be made to meet strategic goals.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 8 no. 2
Type: Research Article
ISSN: 2042-6747

Keywords

Article
Publication date: 1 March 1985

Yash Gupta and Wing Sing Chow

This article surveys the literature dealing with theory and applications of life cycle costing (LCC). It deals with the literature published in the last 25 years and provides 667…

1033

Abstract

This article surveys the literature dealing with theory and applications of life cycle costing (LCC). It deals with the literature published in the last 25 years and provides 667 references.

Details

International Journal of Quality & Reliability Management, vol. 2 no. 3
Type: Research Article
ISSN: 0265-671X

Article
Publication date: 7 March 2016

Laxman Yadu Waghmode and Rajkumar Bhimgonda Patil

Reliability analysis is required to identify the components or subsystems with low reliability for a given designed performance. Life cycle cost analysis helps understand the cost

1267

Abstract

Purpose

Reliability analysis is required to identify the components or subsystems with low reliability for a given designed performance. Life cycle cost analysis helps understand the cost implications over the entire life span of a product. The purpose of this paper is to present a case study describing reliability analysis and life cycle cost optimization of a band saw cutting machine manufactured and used in India.

Design/methodology/approach

The data required for reliability analysis is collected from the manufacturer and users of band saw cutting machine. The parameters of failure distribution have been estimated by using ReliaSoft’s Weibull++6 software. The life cycle cost is divided into various cost elements such as acquisition cost, operation cost, failure cost, support cost and net salvage value.

Findings

The results of the analysis show that the components such as band wheel bearing, guide roller bearing, limit switch, carbide pad, hydraulic cylinder oil seal, control panel dial, control panel and solenoid valve are critical from reliability and life cycle cost analysis perspective.

Originality/value

With certain design changes it is found that the reliability of the system is increased by 15.85 percent while the life cycle cost is reduced by 22.09 percent. The study also shows that the reliability analysis is useful for deciding maintenance intervals.

Details

International Journal of Quality & Reliability Management, vol. 33 no. 3
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 1 June 2005

Charles A. Schuman and Alan C. Brent

Asset management is often one of the last options to maximise cost savings in a competitive global economy due to its intrinsic complexity, especially in many developing…

11444

Abstract

Purpose

Asset management is often one of the last options to maximise cost savings in a competitive global economy due to its intrinsic complexity, especially in many developing countries. Asset management in the process industry must consider the commissioning, operational and end‐of‐life phases of physical assets when commencing a design and implementation project. However, current asset management models show inefficiencies in terms of addressing life cycle costs comprehensively, as well as other aspects of sustainable development. An asset life cycle management (ALCM) model is subsequently proposed for assets in the process industry, which integrates the concepts of generic project management frameworks and systems engineering with operational reliability in order to address these inefficiencies.

Design/methodology/approach

Experiences within a large petrochemical company in South Africa are used as a case study to demonstrate and discuss the different components of the proposed ALCM model.

Findings

Operational reliability and systems engineering are the means to achieve optimum value from physical assets over a facility's lifetime. Thereby, activities are identified that should be completed during each stage of the project life cycle. The application of performance measurements for the operation and support stages is proposed to influence decision making in the process industry.

Originality/value

Specific issues pertaining to the ALCM model are highlighted to ensure optimal practicality and incorporation of the model with other management practices in the process industry.

Details

International Journal of Operations & Production Management, vol. 25 no. 6
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 8 March 2022

Roya Amiri, Javad Majrouhi Sardroud and Vahid Momenaei Kermani

The site layout has a significant impact on the efficiency of construction operations. Planning an effective site layout partly involves identifying and positioning temporary…

Abstract

Purpose

The site layout has a significant impact on the efficiency of construction operations. Planning an effective site layout partly involves identifying and positioning temporary facilities such as tower cranes and areas on the jobsite for materials storage. This study proposes an approach to optimizing the type and location of the tower crane and material supply point on construction sites.

Design/methodology/approach

The problem is formulated into an integer linear programming (ILP) model considering the total cost of material transportation as the objective function and site conditions as constraints. The efficacy of the approach is demonstrated by finding the optimum site layout for a numerical example. The proposed model is validated and verified using two methods.

Findings

Results indicate that the proposed model successfully identifies the type and location of the tower crane and the location of material supply point, leading to approximately 20% cost reduction compared with when such features of a site layout are decided solely based on experience and educated guesses of the construction manager.

Originality/value

The primary contribution of this study is to present a modified linear mathematical model for site layout optimization that exhibits improved performance compared with previous models. The type and location of the tower crane and the material supply point as decision variables are extracted directly from solving the proposed model. The proposed model will help enhance time and cost efficiency on construction sites.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 February 1988

Larry L. Learn

This article provides a broad overview of telecommunications and network‐related technologies. Topics covered include identification and review of network elements, analog and

214

Abstract

This article provides a broad overview of telecommunications and network‐related technologies. Topics covered include identification and review of network elements, analog and digital signals, synchronous and asynchronous transmission formats, transmission media and equipment, transmission techniques and characteristics, multiplexing, network types, access technologies, network architectures and topologies, local‐area network technologies and attributes, protocols and protocol issues, gateways, internetworking, local networking alternatives, equipment certification, and various aspects of network management. It is intended to provide the practicing professional in the field of library and information science with a broad, up‐to‐date technical review that might serve to support and facilitate further investigation of current developments in networks and networking. Although the broad range of topics is not treated in depth, numerous references are provided for further investigation.

Details

Library Hi Tech, vol. 6 no. 2
Type: Research Article
ISSN: 0737-8831

1 – 10 of over 122000