Search results
1 – 4 of 4Martin Lennartsson, Samuel André and Fredrik Elgh
The purpose of this research is to support the customization ability for industrial house building companies striving to offer individualized products but with a strategy which…
Abstract
Purpose
The purpose of this research is to support the customization ability for industrial house building companies striving to offer individualized products but with a strategy which includes a production facility. This is accomplished by analyzing the as-is state in terms of existing engineering assets and by proposing a to-be state using the design platform and product lifecycle management (PLM) support.
Design/methodology/approach
This study is based on design research methodology and collected data are in-depth interviews, document reviews and workshops and method development. The theoretical baseline is product platforms and the design platform.
Findings
The analysis showed that despite use of a platform, inherent assets are disorganized. Still, the identified object-based engineering assets were possible to include in a conceptual proposal for better management, both in the process and product view, using an asset relationship matrix and a PLM system.
Practical implications
The results should be applicable for industrial house building and off-site construction companies and offers an approach to identify and manage their assets and platforms which are crucial to stay competitive.
Originality/value
Previous research on design platforms has focused on engineer-to-order companies within the mechanical industry. The contribution of this paper lies in the application and support of the design platform for industrial house building and the introduction of PLM system support.
Details
Keywords
Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa
This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…
Abstract
Purpose
This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.
Design/methodology/approach
A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.
Findings
An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.
Research limitations/implications
The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.
Originality/value
This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.
Duncan Maxwell and Rachel Couper
Construction suffers from “peculiarities” that concern the temporary natures of the construction site, project teams and unique product design. Considering the digital…
Abstract
Purpose
Construction suffers from “peculiarities” that concern the temporary natures of the construction site, project teams and unique product design. Considering the digital transformation of construction, new solutions are being investigated that can provide consistent data between changing projects. One such source of data manifests in the tracking of logistics activities across the supply chain. Construction logistics is traditionally considered a site management activity focused solely on the “back end” of projects, but an expanded logistics focus can unlock new avenues of improvement. This study aims to understand the requirements and benefits of such a consistent thread of data.
Design/methodology/approach
From a research project with one of Australia’s largest contracting companies, this paper details a series of construction tracking tests as an empirical case study in using Bluetooth low energy aware tracking technology to capture data across the manufacture, delivery and assembly of a cross-laminated timber structural prototyping project.
Findings
The findings affirm the tracking of expanded logistics data can improve back-end performance in subsequent projects while also demonstrating the opportunity to inform a project’s unique front-end design phase. The case study demonstrates that as the reliability, range and battery life of tracking technologies improve, their incorporation into a broader range of construction activities provides invaluable data for improvement across projects.
Originality/value
As a live case study, this research offers unique insights into the potential of construction tracking to close the data loop from final site assembly back to the early project design phase, thus driving continual improvement from a holistic perspective.
Abdulkabir Opeyemi Bello, Doris Omonogwu Eje, Abdullahi Idris, Mudasiru Abiodun Semiu and Ayaz Ahmad Khan
The growing demand for housing and infrastructure, as well as the requirement for affordable housing, has been a significant factor, necessitating investigation for sustainable…
Abstract
Purpose
The growing demand for housing and infrastructure, as well as the requirement for affordable housing, has been a significant factor, necessitating investigation for sustainable approaches and implementation of alternative construction innovations. Hence, this study aims to identify and assess the drivers for implementing modular construction systems (MCS) in developing countries.
Design/methodology/approach
The study adopts a quantitative research approach to seek respondents’ opinions on the factors that can drive the implementation of MCS in developing countries. Accordingly, a structured questionnaire was used as an instrument of data collection based on five Likert scales. The data was analysed using the mean score, one sample t-test, Kruskal–Wallis, factor analysis (FA) and Pearson correlation analysis.
Findings
Results show that 15 of the 16 major identified drivers were statistically significant towards implementing MCS, which indicates that the drivers are crucial for implementing MCS in developing countries. However, the Kruskal–Wallis test reveals that the respondents have varying opinions on the identified drivers. FA categorised the drivers into four categories, namely, “management and sustainability”, “key performance”, “know-how and logistics” and “regulations and policies”. A strong relationship among the four categories of drivers was established using Pearson correlation, which indicated that all the drivers’ categories are essential for implementing MCS in developing countries.
Originality/value
This study identified and assessed the drivers towards implementing MCS in developing countries. The study concludes that the identified drivers are essential for implementing MCS in developing countries. Also, the study considers the government the most placed player in driving the implementation of MCS in developing countries.
Details