Article
Publication date: 6 June 2023

Oluwole Alfred Olatunji and Chamil Erik D. Ramanayaka

This study aims to investigate clients' attributes, their key decision variables and causal relationships between the decision variables. In addition, the purpose of the study is…

Abstract

Purpose

This study aims to investigate clients' attributes, their key decision variables and causal relationships between the decision variables. In addition, the purpose of the study is to map-out from these analyses, the attributes of project clients that motivate contractors' bid decision.

Design/methodology/approach

A total of 50 responses were obtained from a questionnaire survey. 50% of participants are contractors. 44% are claims consultants, whilst 6% are manufacturers and clients. Beyond measures of central tendencies, analysis focussed on causal relationships by way of correlation, analysis of variance and reductionism.

Findings

All 20 factors considered have significant correlations with at least one other factor. Findings also show the factors can be clustered into six: reputation, financial strength, relationship with the bidder, organisational attributes, history with project attributes and project organisation.

Practical implications

Evidence suggests stakeholders have often struggled to consider the many decision factors reported in normative literature, numbering hundreds. By clustering the factors into sub-themes, bid decisioning has been made more efficient. The study also explains how client attributes could determine project success and contractor participation. Different stakeholders can use findings of this study for training and further studies.

Originality/value

Previous studies have considered bid decisioning indexically – factors were long, analyses were largely inconclusive, and causal relationships are orthogonal. Findings in this study have shown depth: 20 originating client-specific factors were clustered into six sub-themes, and correlations were established. The methodology used for the study is confirmatory and conclusive.

Details

Built Environment Project and Asset Management, vol. 13 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 4 March 2022

Oluwole Alfred Olatunji, Chamil Dilhan Erik Ramanayaka, Funmilayo Ebun Rotimi and James Olabode Bamidele Rotimi

The normative literature suggests that there are more than seventy decision factors that contractors must consider if they intend to success in their bid and projects. In…

Abstract

Purpose

The normative literature suggests that there are more than seventy decision factors that contractors must consider if they intend to success in their bid and projects. In addition, such factors have been grouped in relation to project characteristics, client attributes, contractors' business administration and external factors. The extant literature suggests that the relationships between many of the bid decision factors are orthogonal and may not explain how bid-decisions shape project outcomes.

Design/methodology/approach

This knowledge gap has stagnated research in this area. Building on findings of recent studies, this study unbundles bid decision themes by analysing key factors amongst contractors' administrative characteristics. In addition, the study determines intrinsic predictive correlation between the sub-themes. A total of 17 variables were listed in a structured questionnaire survey and presented to participants recruited through purposive snowballing. In total, 50 responses were received and formed the basis of descriptive and inferential statistical analyses.

Findings

The study found that the 17 factors are significant in bid decisions and consequently in bid successes. However, the explanatory variables attached to the themes are most efficient if categorised into six sub-themes. These are contractor's administration depth, strategic direction, commercial intention and own market advantage, resources, experience as well as openness to technology imposed by new projects. Furthermore, four theoretical positions are significant. Contractors bid for projects strategically; they are less reliant on their resource capabilities in bid decisions; every bid decision aligns with a risk strategy, and financial stability enables them to establish appropriate risk mitigation arrangements that could ensure project success.

Originality/value

These findings provide some support for the conceptual premise that bid decisions need to be rational, considered and strategically contribute to project outcomes.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 December 2023

Nnedinma Umeokafor, Abimbola Windapo and Oluwole Alfred Olatunji

The purpose of this study is to investigate the influences of the characteristics of procurement strategies, in this instance labour-only, on project performance concerning health…

Abstract

Purpose

The purpose of this study is to investigate the influences of the characteristics of procurement strategies, in this instance labour-only, on project performance concerning health and safety (H&S), a project performance indicator.

Design/methodology/approach

Using non-probability purposeful and snowballing sampling methods, questionnaires were used to collect data from construction professionals in Nigeria. This was then analysed using descriptive (frequency and mean scores) and inferential statistics (Mann–Whitney-U and Kendall's Tau_b tests).

Findings

The findings indicate a statistically significant negative correlation between ‘the level of client involvement and ‘fatalities' and a positive one with ‘conducting of health and safety risk assessment' and ‘conducting employee surveys on health and safety attitude’. Poor hygiene is found to be the worst lagging indicator, while conducting of inspection is the most adopted leading indicator of project health and safety performance. It also emerged that there is no significant difference in the health and safety performance of projects procured through the procurement strategy in urban and rural areas.

Practical implications

The study provides valuable insight into the complexities in H&S management due to the high level of client involvement in labour-only procurement system (LoPS) projects and the level of diversity in their responsibilities therein. It creates a fundamental direction for developing a detailed framework or guidance notes for client involvement in the integration of H&S into LoPS projects.

Originality/value

This is the first study that examines the influence of the characteristics of procurement strategy on project health and safety performance. Evidence in the literature shows that project delivery outcomes significantly improve if procurement is strategically used, including when it is considered early in projects. However, integrating H&S into procurement strategies has received little attention.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 17 May 2023

Funmilayo Ebun Rotimi, James Olabode Bamidele Rotimi, C.W. Chathurani Silva, Oluwole Alfred Olatunji and Chamil Erik D. Ramanayaka

Migrant construction workers, significant in many developed economies, face several challenges, which place them at a higher risk of job dissatisfaction compared to locals…

Abstract

Purpose

Migrant construction workers, significant in many developed economies, face several challenges, which place them at a higher risk of job dissatisfaction compared to locals. Therefore, this study investigates the determinants of job satisfaction amongst a specific group of migrant construction workers, who hold temporary work visas (TWVs) in New Zealand (NZ).

Design/methodology/approach

An explanatory research approach was used to investigate the determinants of job satisfaction identified through the literature review. Data were collected through a structured survey administered to 200 Chinese migrants on TWVs (short stays) working on selected major projects in the Auckland region. Data analysis involved T-test and structural equation modelling (SEM) of 102 valid questionnaire responses.

Findings

The study highlights the importance of providing opportunities for knowledge advancement and career progression for migrant construction workers to improve their job satisfaction. The results found that Chinese migrant construction workers are generally satisfied with their jobs and would extend their stay if job opportunities are provided. The results confirm that remuneration and opportunities for knowledge advancement and career progression lead to increased job satisfaction, while loneliness decreases job satisfaction. The opportunities for knowledge advancement and career progression triggered more satisfaction than remuneration.

Originality/value

The research result provides a useful knowledge base for understanding the determinants of job satisfaction amongst Chinese migrant construction workers with TWVs. These findings have implications for employment management practices within the construction industry and could enhance immigration information policies and other recruitment agencies' approaches to sourcing overseas workers for the NZ construction industry.

Details

Built Environment Project and Asset Management, vol. 13 no. 5
Type: Research Article
ISSN: 2044-124X