Search results

1 – 10 of 565
Article
Publication date: 19 January 2024

Mohamed Elkbuli, Nurhidayah Azmy and Chia Kuang Lee

Although there has been an increase in the application of a variety of robust technologies and systems, the oil and gas sector relies on project managers’ soft skills for success…

Abstract

Purpose

Although there has been an increase in the application of a variety of robust technologies and systems, the oil and gas sector relies on project managers’ soft skills for success because of their vital role. Therefore, this study aims to explore the profound influence of project managers’ soft communication skills on successful risk management within Libya’s oil and gas projects.

Design/methodology/approach

A review of relevant literature and a quantitative approach through the administration of a questionnaire were used to determine factors impacting risk management implementation related to managerial communication skills. A total of 246 valid responses were received from the oil and gas companies in Tripoli, Libya. Partial least squares structural equation modelling was used to examine the direct and moderating relationship drawn by the hypotheses.

Findings

The findings suggest that managerial soft skills may be used to improve continuous risk management processes and intra-project communication. It was found that the experience is strengthening the positive relationship between written communication soft skills and project risk management implementation among Libyan oil and gas construction projects.

Originality/value

This study defines project managers’ soft communication skills and analyzes project managers’ soft communication skills with the role of experience as a moderator. This paper presents a valuable contribution by offering original insights tailored explicitly to the Libyan context. The information presented in this paper is relevant to project managers operating within the oil and gas industry. It also offers a novel approach to risk management in the Libyan oil and gas industry that can improve project efficiency and effectiveness.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 29 January 2024

John Pearson

This paper aims to consider the potential implications of the layering of regulation in relation to hydraulic fracturing (fracking) at the borders between the nations of the UK.

Abstract

Purpose

This paper aims to consider the potential implications of the layering of regulation in relation to hydraulic fracturing (fracking) at the borders between the nations of the UK.

Design/methodology/approach

This paper uses a qualitative research method grounded in particular in legal geography to examine the existing approaches to regulating hydraulic fracturing and identify the places and their features that are constructed as a result of their intersection at the borders of the nations comprising the UK.

Findings

The current regulatory framework concerning hydraulic fracturing risks restricts the places in which the practice can occur in such a manner as to potentially cause greater environmental harm should the process be used. The regulations governing the process are not aligned in relation to the surface and subsurface aspects of the process to enable their management, once operational, as a singularly constructed place of extraction. Strong regulation at the surface can have the effect of influencing placement of the site only in relation to the place at which the resource sought reaches the surface, whilst having little to no impact on the environmental harms, which will result at the subsurface or relative to other potential surface site positions, and potentially even increasing them.

Research limitations/implications

This paper is limited by uncertainty as to the future use of hydraulic fracturing to extract oil and gas within the UK. The issues raised within it would also be applicable to other extractive industries where a surface site might be placed within a radius of the subsurface point of extraction, rather than having to be located at a fixed point relative to that in the subsurface. This paper therefore raises concerns that might be explored more generally in relation to the regulation of the place of resource extraction, particularly at legal borders between jurisdictions, and the impact of regulation, which does not account for the misalignment of regulation of spaces above and below the surface that form a single place at which extraction occurs.

Social implications

This paper considers the potential impacts of misaligned positions held by nations in the UK in relation to environmentally harmful practices undertaken by extractive industries, which are highlighted by an analysis of the extant regulatory framework for hydraulic fracturing.

Originality/value

Whilst the potential for cross internal border extraction of gas within the UK via hydraulic fracturing and the regulatory consequences of this has been highlighted in academic literature, this paper examines the implications of regulation for the least environmentally harmful placement of the process.

Details

Journal of Place Management and Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1753-8335

Keywords

Article
Publication date: 16 February 2024

M.K.S. Al-Mhdawi, Alan O'connor, Abroon Qazi, Farzad Rahimian and Nicholas Dacre

This research aims to systematically review studies on significant risks for Critical Infrastructure Projects (CIPs) from selected top-tier academic journals from 2011 to 2023.

Abstract

Purpose

This research aims to systematically review studies on significant risks for Critical Infrastructure Projects (CIPs) from selected top-tier academic journals from 2011 to 2023.

Design/methodology/approach

In this research, a three-step systematic literature review methodology was employed to analyse 55 selected articles on Critical Infrastructure Risks (CIRs) from well-regarded and relevant academic journals published from 2011 to 2023.

Findings

The findings highlight a growing research focus on CIRs from 2011 to 2023. A total of 128 risks were identified and grouped into ten distinct categories: construction, cultural, environmental, financial, legal, management, market, political, safety and technical risks. In addition, literature reviews combined with questionnaire surveys were more frequently used to identify CIRs than any other method. Moreover, oil and gas projects were the subjects most often explored in the reviewed papers. Furthermore, it was observed that publications from Iran, the USA and China dominated CIRs research, making significant contributions, accounting for 49.65% of the analysed articles.

Research limitations/implications

This research specifically focuses on five types of CIPs (i.e. roadways, bridges, water supply systems, dams and oil and gas projects). Other CIPs like cyber-physical systems or electric power systems, were not considered in this research.

Practical implications

Governments and contracting firms can benefit from the findings of this study by understanding the significant risks associated with the execution of CIPs, irrespective of the nation, industry or type of project. The results of this investigation can offer construction professionals valuable insights to formulate and implement risk response plans in the early stages of a project.

Originality/value

As a novel literature review related to CIRs, it lays the groundwork for future research and deepens the understanding of the multi-faceted effects of these risks, as well as sets practical response strategies.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 14 November 2023

Hajar Pouran Manjily, Mahmood Alborzi, Turaj Behrouz and Seyed Mohammad Seyed- Hosseini

This study aims to focused on conducting a comprehensive assessment of the technology readiness level (TRL) of Iran’s oil field intelligence compared to other countries with…

Abstract

Purpose

This study aims to focused on conducting a comprehensive assessment of the technology readiness level (TRL) of Iran’s oil field intelligence compared to other countries with similar oil reservoirs. The ultimate objective is to optimize oil extraction from this field by leveraging intelligent technology. Incorporating intelligent technology in oil fields can significantly simplify operations, especially in challenging-to-access areas and increase oil production, thereby generating higher income and profits for the field owner.

Design/methodology/approach

This study evaluates the level of maturity of present oil field technologies from the perspective of an intelligent oil field by using criteria for measuring the readiness of technologies. A questionnaire was designed and distributed to 18 competent oil industry professionals. Using weighted criteria, a mean estimate of oil field technical maturity was derived from the responses of respondents. Researchers evaluated the level of technological readiness for Brunei, Kuwait and Saudi Arabia’s oil fields using scientific studies.

Findings

None of the respondents believe that the intelligent oil field in Iran is highly developed and has a TRL 9 readiness level. The bulk of experts believed that intelligent technologies in the Iran oil industry have only reached TRL 2 and 1, or are merely in the transfer phase of fundamental and applied research. Clearly, Brunei, Kuwait and Saudi Arabia have the most developed oil fields in the world. In Iran, academics and executive and contracting firms in the field of intelligent oil fields are working to intelligently develop young oil fields.

Originality/value

This study explores the level of maturity of intelligent technology in one of Iran’s oil fields. It compares it to the level of maturity of intelligent technology in several other intelligent oil fields throughout the globe. Increasing intelligent oil fields TRL enables better reservoir management and causes more profit and oil recovery.

Details

Journal of Science and Technology Policy Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2053-4620

Keywords

Open Access
Article
Publication date: 22 November 2023

Christopher Owen Cox and Hamid Pasaei

According to the Project Management Institute, 70% of projects fail globally. The causes of project failure in many instances can be identified as non-technical or behavioral in…

Abstract

Purpose

According to the Project Management Institute, 70% of projects fail globally. The causes of project failure in many instances can be identified as non-technical or behavioral in nature arising from interactions between participants. These intangible risks can emerge in any project setting but especially in project settings having diversity of cultures, customs, beliefs and traditions of various companies or countries. This paper provides an objective framework to address these intangible risks.

Study design/methodology/approach

This paper presents a structured approach to identify, assess and manage intangible risks to enhance a project team’s ability to meet its objectives. The authors propose a user-friendly framework, Intangible Risk Assessment Methodology for Projects (IRAMP), to address these risks and the factors that cause them. Meta-network (e.g., a network of networks) simulation and established social network analysis (SNA) measures provide a quantitative assessment and ranking of causal events and their influence on the intangible behavior centric risks.

Findings

The proposed IRAMP and meta-network approach were utilized to examine the project delivery process of an international energy firm. Data were gathered using structured interviews, surveys and project team workshops. The use of the IRAMP to highlight intangible risk areas underpinned by the SNA measures led to changes in the company’s organizational structure to enhance project delivery effectiveness.

Originality/value

This work extends the existing project risk management literature by providing a novel objective approach to identify and quantify behavior centric intangible risks and the conditions that cause them to emerge.

Details

International Journal of Industrial Engineering and Operations Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2690-6090

Keywords

Article
Publication date: 6 February 2023

G. Edward Gibson, Mounir El Asmar, Abdulrahman Yussef and David Ramsey

Assessing front end engineering design (FEED) accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule…

169

Abstract

Purpose

Assessing front end engineering design (FEED) accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule predictions. A framework to measure FEED accuracy does not exist in the literature or in practice, not does systematic data directly linking FEED accuracy to project performance. This paper aims to focus first on gauging and quantifying FEED accuracy, and second on measuring its impact on project performance in terms of cost change, schedule change, change performance, financial performance and customer satisfaction.

Design/methodology/approach

A novel measurement scheme was developed for FEED accuracy as a comprehensive assessment of factors related to the project leadership and execution teams, management processes and resources; to assess the environment surrounding FEED. The development of this framework built on a literature review and focus groups, and used the research charrettes methodology, guided by a research team of 20 industry professionals and input from 48 practitioners representing 31 organizations. Data were collected from 33 large industrial projects representing over $8.8 billion of installed cost, allowing for a statistical analysis of the framework's impact on performance.

Findings

This paper describes: (1) twenty-seven critical FEED accuracy factors; (2) an objective and scalable method to measure FEED accuracy; and (3) data showing that projects with high FEED accuracy outperformed projects with low FEED accuracy by 20 percent in terms of cost growth in relation to their approved budgets.

Practical implications

FEED accuracy is defined as the degree of confidence in the measured level of maturity of the FEED deliverables to serve as a basis of decision at the end of detailed scope, prior to detailed design. Assessing FEED accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule predictions.

Originality/value

FEED accuracy has not been assessed before, and it turned out to have considerable project performance implications. The new framework presented in this paper is the first of its kind, it has been tested rigorously, and it contributes to both the literature body of knowledge as well as to practice. As one industry leader recently stated, “it not only helped to assess the quality and adequacy of the technical documentation required, but also provided an opportunity to check the organization's readiness before making a capital investment decision.”

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 February 2024

Xiaobo Shi, Yan Liu, Kunkun Ma, Zixin Gu, Yaning Qiao, Guodong Ni, Chibuzor Ojum, Alex Opoku and Yong Liu

The purpose is to identify and evaluate the safety risk factors in the coal mine construction process.

Abstract

Purpose

The purpose is to identify and evaluate the safety risk factors in the coal mine construction process.

Design/methodology/approach

The text mining technique was applied in the stage of safety risk factor identification. The association rules method was used to obtain associations with safety risk factors. Decision-Making Trial and Evaluation Laboratory (DEMATEL) and Interpretative Structural Modeling (ISM) were utilized to evaluate safety risk factors.

Findings

The results show that 18 safety risk factors are divided into 6 levels. There are 12 risk transmission paths in total. Meanwhile, unsafe behavior and equipment malfunction failure are the direct causes of accidents, and inadequate management system is the basic factor that determines the safety risk status.

Research limitations/implications

Due to the limitation of the computational matrix workload, this article only categorizes numerous lexical items into 18 factors. Then, the workshop relied on a limited number of experts; thus, the findings may be potentially biased. Next, the accident report lacks a universal standard for compilation, and the use of text mining technique may be further optimized. Finally, since the data are all from China, subsequent cross-country studies should be considered.

Social implications

The results can help China coal mine project managers to have a clear understanding of safety risks, efficiently carry out risk hazard identification work and take timely measures to cut off the path of transmission with risks identified in this study. This helps reduce the economic losses of coal mining enterprises, thus improving the safety standards of the entire coal mining industry and the national standards for coal mine safety policy formulation.

Originality/value

Coal mine construction projects are characterized by complexity and difficulties in construction. Current research on the identification and assessment of safety risk factors in coal mine construction is insufficient. This study combines objective and systematic research approaches. The findings contribute to the safety risk management of China coal mine construction projects by providing a basis for the development of safety measures.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 April 2024

Deraniyagalage Chanaka Karunarathna, H.A.H.P. Perera, B.A.K.S. Perera and P.A.P.V.D.S. Disaratna

Delays in utility shifting during road construction have broad ramifications. These delays not only lengthen the project's timeline but also raise expenses and cause problems with…

Abstract

Purpose

Delays in utility shifting during road construction have broad ramifications. These delays not only lengthen the project's timeline but also raise expenses and cause problems with resource allocation. Thus, this study investigates the influence of delay in utility shifting for extension of time claims in road construction projects (RCPs) in Sri Lanka.

Design/methodology/approach

The study used a quantitative approach with three rounds of Delphi surveys to gather empirical data. Further, the probability impact assessment was used to carefully analyse the data and appraise the information gathered.

Findings

The findings initially revealed 33 causes of delays in utility shifting for extension of time claims in RCPs in Sri Lanka. Ultimately, 11 severe causes were identified based on their high probability and impact, concluding with 45 strategies that were assigned to overcoming those most severe causes of delay.

Originality/value

This study will contribute to the industry and theory by providing solutions to handle utility-shifting delays with the linkage of preventing time extension claims for RCPs in Sri Lanka. Further, there is a dearth of literature in the research area, both locally and globally. Thus, the findings of this research will provide a benchmark for further detailed studies in other countries as well.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 11 October 2022

Fabian Maximilian Johannes Teichmann and Chiara Wittmann

This paper aims to examine the fundamental conditions which are necessary for the construction of a regulation which will affect a genuine advancement in the context of…

Abstract

Purpose

This paper aims to examine the fundamental conditions which are necessary for the construction of a regulation which will affect a genuine advancement in the context of environmental protection.

Design/methodology/approach

The component parts of an adequately built regulation are broken down to concretise the notion of efficacy – and its proposed universality – in a regulatory context. This paper takes a comparative approach of regulations and extends to include a consideration of the monitoring and enforcement of regulation as a necessary tenant of an effective regulation.

Findings

Sustainability regulations have seen a significant development in the 20th century. Notable remain the national discrepancies to so universal problem, as well as an inconsistent acknowledgement of the purpose of sustainability regulations beyond a tick-box compliance commitment.

Originality/value

The importance of sustainability has been amplified without a due consideration of what its translation into regulation must look like. This paper argues that no meaningful change can be lobbied without understanding how its practical implementation is performed.

Details

Journal of Financial Crime, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1359-0790

Keywords

Article
Publication date: 14 September 2023

Kangning Liu, Bon-Gang Hwang, Jianyao Jia, Qingpeng Man and Shoujian Zhang

Informal learning networks are critical to response to calls for practitioners to reskill and upskill in off-site construction projects. With the transition to the coronavirus…

Abstract

Purpose

Informal learning networks are critical to response to calls for practitioners to reskill and upskill in off-site construction projects. With the transition to the coronavirus disease 2019 (COVID-19) pandemic, social media-enabled online knowledge communities play an increasingly important role in acquiring and disseminating off-site construction knowledge. Proximity has been identified as a key factor in facilitating interactive learning, yet which type of proximity is effective in promoting online and offline knowledge exchange remains unclear. This study takes a relational view to explore the proximity-related antecedents of online and offline learning networks in off-site construction projects, while also examining the subtle differences in the networks' structural patterns.

Design/methodology/approach

Five types of proximity (physical, organizational, social, cognitive and personal) between projects members are conceptualized in the theoretical model. Drawing on social foci theory and homophily theory, the research hypotheses are proposed. To test these hypotheses, empirical case studies were conducted on two off-site construction projects during the COVID-19 pandemic. Valid relational data provided by 99 and 145 project members were collected using semi-structured interviews and sociometric questionnaires. Subsequently, multivariate exponential random graph models were developed.

Findings

The results show a discrepancy arise in the structural patterns between online and offline learning networks. Offline learning is found to be more strongly influenced by proximity factors than online learning. Specifically, physical, organizational and social proximity are found to be significant predictors of offline knowledge exchange. Cognitive proximity has a negative relationship with offline knowledge exchange but is positively related to online knowledge exchange. Regarding personal proximity, the study found that the homophily effect of hierarchical status merely emerges in offline learning networks. Online knowledge communities amplify the receiver effect of tenure. Furthermore, there appears to be a complementary relationship between online and offline learning networks.

Originality/value

Proximity offers a novel relational perspective for understanding the formation of knowledge exchange connections. This study enriches the literature on informal learning within project teams by revealing how different types of proximity shape learning networks across different channels in off-site construction projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 565