Search results

1 – 1 of 1
Article
Publication date: 1 December 2004

Ohwoon Kwon and Hongchul Lee

This paper presents a new calculating methodology for estimating the quantitative monetary managerial effects as a result of total productive maintenance (TPM) activities. The…

2610

Abstract

This paper presents a new calculating methodology for estimating the quantitative monetary managerial effects as a result of total productive maintenance (TPM) activities. The suggested methodology is to calculate the total saving monetary amount composed of contribution profit and saving costs that are obtained by improving the overall equipment efficiency (OEE) of processing type equipment. The managerial effect that is the total saved monetary effect in keeping the OEE at the 1 percent upraised condition during a given period can be calculated by the sum of additive contribution profit and saved manufacturing cost. The proposed computation methodology is demonstrated by applying to a real industrial processing type of manufacturing equipment. This newly presented model is expected to contribute to raise the maturity of TPM activities by grasping the monetary quantitative managerial effects periodically.

Details

Journal of Quality in Maintenance Engineering, vol. 10 no. 4
Type: Research Article
ISSN: 1355-2511

Keywords

Access

Year

All dates (1)

Content type

1 – 1 of 1