Search results

1 – 10 of 84
Article
Publication date: 7 November 2022

Buddhini Ginigaddara, Srinath Perera, Yingbin Feng, Payam Rahnamayiezekavat and Mike Kagioglou

Industry 4.0 is exacerbating the need for offsite construction (OSC) adoption, and this rapid transformation is pushing the boundaries of construction skills towards extensive…

Abstract

Purpose

Industry 4.0 is exacerbating the need for offsite construction (OSC) adoption, and this rapid transformation is pushing the boundaries of construction skills towards extensive modernisation. The adoption of this modern production strategy by the construction industry would redefine the position of OSC. This study aims to examine whether the existing skills are capable of satisfying the needs of different OSC types.

Design/methodology/approach

A critical literature review evaluated the impact of transformative technology on OSC skills. An existing industry standard OSC skill classification was used as the basis to develop a master list that recognises emerging and diminishing OSC skills. The master list recognises 67 OSC skills under six skill categories: managers, professionals, technicians and trade workers, clerical and administrative workers, machinery operators and drivers and labourers. The skills data was extracted from a series of 13 case studies using document reviews and semi-structured interviews with project stakeholders.

Findings

The multiple case study evaluation recognised 13 redundant skills and 16 emerging OSC skills such as architects with building information modelling and design for manufacture and assembly knowledge, architects specialised in design and logistics integration, advanced OSC technical skills, factory operators, OSC estimators, technicians for three dimensional visualisation and computer numeric control operators. Interview findings assessed the current state and future directions for OSC skills development. Findings indicate that the prevailing skills are not adequate to readily relocate construction activities from onsite to offsite.

Originality/value

To the best of the authors’ knowledge, this research is one of the first studies that recognises the major differences in skill requirements for non-volumetric and volumetric OSC types.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 28 February 2024

Dat Tien Doan, Tuyet Phuoc Anh Mai, Ali GhaffarianHoseini, Amirhosein Ghaffarianhoseini and Nicola Naismith

This study aims to identify the primary research areas of modern methods of construction (MMC) along with its current trends and developments.

Abstract

Purpose

This study aims to identify the primary research areas of modern methods of construction (MMC) along with its current trends and developments.

Design/methodology/approach

A combination of bibliometric and qualitative analysis is adopted to examine 1,957 MMC articles in the Scopus database. With the support of CiteSpace 6.1.R6, the clusters, leading authors, journals, institutions and countries in the field of MMC are examined.

Findings

Offsite construction, inter-modular connections, augmenting output, prefabricated concrete beams and earthquake-resilient prefabricated beam–column steel joints are the top five research areas in MMC. Among them, offsite construction and inter-modular connections are significantly focused, with many research articles. The potential for collaboration, among prominent authors such as Wang, J., Liu, Y. and Wang, Y., explains the recent rapid growth of the MMC field of research. With a total of 225 articles, Engineering Structures is the journal that has published the most articles on MMC. China is the leading country in this field, and the Ministry of Education China is the top institution in MMC.

Originality/value

The findings of this study bear significant implications for stakeholders in academia and industry alike. In academia, these insights allow researchers to identify research gaps and foster collaboration, steering efforts toward innovative and impactful outcomes. For industries using MMC practices, the clarity provided on MMC techniques facilitates the efficient adoption of best practices, thereby promoting collaboration, innovation and global problem-solving within the construction field.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 7 November 2023

Buddhini Ginigaddara, Thayaparan Gajendran and Cameron Beard

Offsite construction (OSC) is a modern method of construction (MMC) that involves manufacturing and assembly of buildings. Industry 4.0-driven technological advancements have…

Abstract

Purpose

Offsite construction (OSC) is a modern method of construction (MMC) that involves manufacturing and assembly of buildings. Industry 4.0-driven technological advancements have accelerated OSC uptake causing many skilled construction workers requiring re-skilling or up-skilling. Quantity surveyors currently play an important role throughout a construction project life cycle, and hence, their knowledge on OSC projects is vital for the continuity of quantity surveying (QS) profession. The purpose of this paper is to critically review QS education in an OSC perspective and to propose strategies for up-skilling.

Design/methodology/approach

This research includes a detailed literature review of QS and OSC to evaluate how OSC affects the QS profession. Publicly available information on the university websites on accredited QS and construction management degrees was reviewed to identify OSC and MMC references, specifically the content listing and learning outcomes.

Findings

Out of the 315 degrees offered by 157 universities, only 69 degrees in 32 universities refer to OSC or MMC. OSC concept is explicitly referred in subjects related to construction technology, production management, lean construction, digital construction and MMC. As such, the research suggests including lean production principles, OSC techniques and design philosophies such as design for manufacture and assembly be added to the QS curricula.

Research limitations/implications

This research is a comprehensive desktop study that does not involve empirical data-based evaluation. Research findings inform strategies to improve QS education and professional competencies.

Originality/value

To the best of the authors’ knowledge, this paper is the first of its kind that evaluates accredited QS degrees and learning requirements in an OSC perspective.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 30 October 2023

Lovelin Ifeoma Obi, Mohammed Arif, Steve Michael Lamb and Ilnaz Ashayeri

The United Kingdom (UK) construction sector is transforming with increasing confidence in offsite construction (OSC) solutions following its accrued benefits. To sustain this…

Abstract

Purpose

The United Kingdom (UK) construction sector is transforming with increasing confidence in offsite construction (OSC) solutions following its accrued benefits. To sustain this momentum, exploring viable strategies to promote successful OSC implementation is a top priority. This paper aims to identify and establish interrelationships and logical dependencies of critical success factors (CSFs) for implementing OSC on building projects in the UK.

Design/methodology/approach

This study utilised a qualitative research approach. Following a critical review of extant literature, brainstorming and focus group sessions were carried out with OSC experts in the UK construction industry to identify and contextualise CSFs for OSC implementation. Interpretive structural modelling (ISM) and matrix impact cross-reference multiplication applied to a classification (MICMAC) were used to analyse and model the interrelationships between the contextualised CSFs.

Findings

The study identified eighteen CSFs for implementing OSC on projects in the UK positioned on seven hierarchical levels and clustered into dependent, linkage and independent factors. The top five CSFs established were client commitment, top management support, adequate OSC knowledge and experience, flexible leadership and flexible business models. These were located at the base of the ISM model, possessing the highest driving powers in facilitating the successful implementation of OSC on projects.

Originality/value

This study established a hierarchical interrelationship and the importance of the CSFs influencing the successful implementation of OSC. This would assist OSC clients and project teams in identifying and prioritising particular areas for strategic actions, which offer advantages in pursuing successful OSC project outcomes in the UK. Previous research on OSC implementation in the UK had not examined CSFs' interrelationships.

Article
Publication date: 17 June 2022

Emmanuel Itodo Daniel and Olalekan Oshodi

The purpose of this study is to present an overview of the existing knowledge on the combined application of lean, off-site and simulation (LOS) in housing delivery.

Abstract

Purpose

The purpose of this study is to present an overview of the existing knowledge on the combined application of lean, off-site and simulation (LOS) in housing delivery.

Design/methodology/approach

A systematic literature review approach was adopted. Based on a comprehensive search using Scopus, Web of Science and the International Group for Lean Construction databases, 66 relevant journal articles were identified and analysed.

Findings

This study found that the most significant impacts of the combined application of LOS in housing delivery are the capacity to visualise the production processes as a whole in real time, exposure and removal of non-value-adding activities from the production and faster delivery. However, the combined application of LOS is low compared to a single application of each technique in housing delivery.

Practical implications

The results provide relevant stakeholders and actors in the housing sector (private and public housing developers, off-site housing manufacturers and constructors, housing associations and government housing agencies, among others) with the information needed to improve the outcomes of housing delivery through the application of LOS.

Originality/value

This study contributes to the ongoing debate on addressing the global housing shortage by presenting an integrated overview of the existing knowledge on the impact of the nexus of LOS and providing compelling evidence for its usage in housing delivery. It also demonstrates how the combined application of LOS supports the achievement of the flow and value view in the transformation flow value model, which was not previously reported.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 23 August 2022

Mohammad Nafe Assafi, Md. Mehrab Hossain, Nicholas Chileshe and Shuvo Dip Datta

As a developing nation, Bangladesh still has scarce technological applications in the construction sector, which results in construction delays. This paper aims to propose a…

Abstract

Purpose

As a developing nation, Bangladesh still has scarce technological applications in the construction sector, which results in construction delays. This paper aims to propose a framework that will diminish manual labor, reduce human error and apply four-dimensional (4D) building information modeling (BIM)-based solutions to mitigate and prevent construction project delays.

Design/methodology/approach

First, a systematic literature review was conducted on analyzing the construction delay scenario in the context of Bangladesh and other countries. Next, a 4D BIM-based framework was developed using Autodesk Navisworks Manage. Finally, it was used to run on-site simulations on an ongoing construction project which faced delays because of design errors and inefficient planning.

Findings

Affirmative results were found from applying these methods through real-time project simulation. The current status of the project and the status after using BIM technology were compared. It was observed that during both the preconstruction and execution phases, the application of 4D BIM could reduce the delay posed by design error and inefficient planning.

Practical implications

The project manager and the design engineers can use these frameworks to review their projects. For the design engineers, the preconstruction phase portion of the framework will help identify the probable errors in the design. For the project managers, keeping track of time using the execution phase portion of the framework will be resourceful.

Originality/value

To the best of the authors’ knowledge, this study is the first to assess the significant delay factors endemic in Bangladesh and develop a BIM-based technological solution. This study is solely dedicated to reforming the construction techniques in Bangladesh through the application of 4D BIM technology.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 15 April 2024

Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, J. Jorge Ochoa and Aparna Samaraweera

Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities…

Abstract

Purpose

Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities around its supply chain. Hence, the purpose of this study is twofold: to identify the OC project delivery models, the limitations in their procurement approach to facilitate the resilience of the supply chain and interventions to promote supply chain resilience (SCR) and to identify the gaps in the existing procurement process and propose further research areas that implement strategies to improve SCR.

Design/methodology/approach

The study was conducted as a systematic literature review. In total, 41 peer-reviewed research papers published between 2013 and 2023 were shortlisted through the preferred reporting items for systematic reviews and meta-analysis guidelines. A descriptive analysis was conducted, followed by a thematic analysis.

Findings

The descriptive analysis reveals that the emphasis on digitising OC has shifted to transforming the business model, procurement and supply chain with a human-centric view. In thematic analysis, the predictability of the SC partners and the probabilities of evaluating the prospects are revealed as arbitrary characteristics in the current procurement strategies. Rewarding collaborative relationships among SC partners and incorporating provisions to postpone the module delivery are some interventions to promote flexibility. Drafting comprehensive and effective contracts that address transparency issues and facilitating the need for continuous development of capabilities through procurement are among the further research avenues proposed.

Originality/value

This study is a precursor demonstrating the potential of the procurement process to implement the decrees of SCR for better goal congruence of the OC supply chain.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 26 May 2023

Sina Moradi and Piia Sormunen

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling…

2773

Abstract

Purpose

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling (BIM). Despite previous research efforts, there is still a gap concerning the multidimensional nature of their integration. Hence, this study aims to fill the mentioned knowledge gap through exploring and comparing the challenges, enablers, techniques as well as benefits of integrating LC with BIM and sustainability in building construction projects.

Design/methodology/approach

A systematic literature review was conducted to fulfill the purpose of this study.

Findings

The findings reveal and compare the challenges, enablers, techniques and benefits of integrating LC with BIM and sustainability in building construction projects. The results suggest that there are eight common challenges for integrating LC with BIM and sustainability, including high initial cost, lack of collaboration, lack of professionals and lack of compatible contractual framework. The discovered challenges, enablers, techniques and benefits seem to be mostly routed in people. The findings also suggest that the synergistic benefits of integrating LC with BIM and sustainability can overcome the common challenges (safety, reliability, productivity, collaboration and quality) in construction projects.

Originality/value

The findings contribute to the literature and practice concerning the integration of LC with BIM and sustainability by exploring, comparing and discussing the relevant challenges, enablers, techniques as well as benefits. Moreover, the findings reveal the significance of the development of people in construction industry, besides processes and technology, as people are always subject of activities in construction while processes and technology are always objects.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 8 November 2021

Teslim Bamidele Balogun, Olukayode Olusola Awonuga and Rukaya Abowen-Dake

This study aims to investigate digital technology (DT) competencies, training and awareness amongst Black Asian Minority Ethnic (BAME) construction students in the UK.

Abstract

Purpose

This study aims to investigate digital technology (DT) competencies, training and awareness amongst Black Asian Minority Ethnic (BAME) construction students in the UK.

Design/methodology/approach

This study uses a quantitative online survey to investigate both BAME Construction Undergraduates Graduate Students (CUGS) and staff studying on and teaching on Construction programmes. The investigation examined their opinions as to their own awareness of their competencies and training regarding DT.

Findings

Findings indicate that BAME CUGS were mostly “very proficient” in the use of basic DT, such as required to complete an authentic assessment that typifies a real-life scenario. For example, sending and receiving emails, Excel, Word, computer literacy/basic IT skills, browsing searching materials, PowerPoint, specialist IT skills, mobile devices, tablet and social media handles. However, findings revealed that training awareness and competencies in new DT is shallow, and BAME CUGS are probably not ready for the digitalised construction world. Respondents were mainly within the “probably aware” range, and very few were within the “definitely aware” range, on the Likert scale adopted. New DTs that fell within the “definitely aware” range are BIM, offsite construction and manufacturing, 3D printing, cloud computing and collaboration.

Research limitations/implications

It is acknowledged that expanding the sample size to other universities and exploring BAME industry professionals’ narratives could further enrich the discussion. However, these limitations did not impact the robust practical and theoretical implications provided to CUGS, Higher Education (HE)sectors, University staff and industry emerging from the analysis and findings achieved in the study. Still, it is being recommended for future work to consider.

Originality/value

The study provides valuable recommendations helpful to HE institutions, industry and government. Recommendations provided include a need to review and update the current curriculum, robust partnership between academia and industry, increase government funding, upskilling and training staff in the new DT.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 11 July 2022

Priyadarshini Das, Srinath Perera, Sepani Senaratne and Robert Osei-Kyei

Industry 4.0 is characterised by the exponential pace of technological innovations compelling organisations to transform or be displaced. Industry 4.0 transformation of…

Abstract

Purpose

Industry 4.0 is characterised by the exponential pace of technological innovations compelling organisations to transform or be displaced. Industry 4.0 transformation of construction enterprises lacks systematic guidance and notable earlier studies have utilised maturity models to map transformation of enterprises. This paper proposes a conceptual maturity model for construction enterprises for business scenarios leading to Industry 4.0.

Design/methodology/approach

The requirements for designing maturity models, including comparison with existing models and scientifically documenting the design process, make Systematic Literature Reviews (SLR) appropriate. Two systematic literature reviews (SLRs) are conducted to shortlist a total of 95 papers, which are subjected to subsequent content analysis.

Findings

The first SLR identifies the following process categories as critical levers of industry 4.0 maturity; data management, people and culture, leadership and strategy, collaboration and communication, automation, innovation and change management. The second SLR ascertains that the existing maturity models in construction literature do not adequately correspond to Industry 4.0 business scenarios with limited emphasis on data management, automation, change management and innovation. The findings are assimilated to propose a conceptual Smart Modern Construction Enterprise Maturity Model (SMCeMM).

Originality/value

The paper systematises the transformation of construction enterprises in Industry 4.0 and leads to state-of-the-art development of Industry 4.0 and maturity model research in construction. The proposed conceptual model addressed both the demands of the construction industry as well as what is required to navigate Industry 4.0 better.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 84