Search results

1 – 10 of 503
Book part
Publication date: 6 November 2013

Michael Noble and Patrick T. Hester

This chapter examines why U.S. offshore wind farms do not exist and identifies sites most suitable for development based on European offshore wind farms. A survey of current…

Abstract

This chapter examines why U.S. offshore wind farms do not exist and identifies sites most suitable for development based on European offshore wind farms. A survey of current literature indicates that U.S. development is stalled due to a lack of government and financial support. The literature identifies common attributes associated with the successful deployment of European offshore farms and provides a basis for a multi-criteria decision analysis of potential U.S offshore wind farm sites. A review of European wind farms indicates that a small, 10–50 MW farm located in shallow waters of less than 20 m might be more successful than previous U.S. development efforts. The review also identifies common European attributes deemed critical for success. These attributes are modified, taking into account unique U.S. factors, and a set of nine critical attributes are derived for use in a multi-criteria decision analysis model of suitable U.S. locations. The nine critical attributes (wind quality, water depth, shore distance, state support, public support, industrial support, population density, weather, and energy costs), along with associated utility function values, are applied to 23 past and current proposed U.S. sites. The model identified three sites, in Galveston Island, TX, Port Isabel, TX, and Block Island, RI, as being most favorable for a small wind farm.

Details

Applications of Management Science
Type: Book
ISBN: 978-1-78190-956-0

Keywords

Article
Publication date: 12 October 2015

Lijuan Dai, Marvin Rausand and Ingrid Bouwer Utne

Maintenance planning is a complicated decision-making process that involves the major stakeholders and the main life-cycle phases of an engineering system. The purpose of this…

Abstract

Purpose

Maintenance planning is a complicated decision-making process that involves the major stakeholders and the main life-cycle phases of an engineering system. The purpose of this paper is to propose an availability-centred maintenance planning approach for offshore wind farms, with special focus on the early system design phase.

Design/methodology/approach

The proposed approach is based on a stepwise procedure that integrates logistics consideration into reliability-centred maintenance. For each step, the essential methods for systematic analysis and documentation are introduced.

Findings

Practical information from current offshore wind farms and lessons learned from relevant industries are included to exemplify and justify the implementation of the proposed approach. In a general way, the approach shows that valuable input can be provided to decision making about maintainability and maintenance planning. Furthermore, the approach facilitates the initial maintenance plan to be adjusted and improved upon as additional operating experience becomes available.

Research limitations/implications

Offshore wind energy is still an industry in its infancy with an attendant high degree of confidentiality. There is scarcely any detailed practical information available for the production of a case study on this topic. However, the current paper’s theoretical basis may be applied to identify current and future knowledge gaps, for the development of more detailed guidelines as established in the further research.

Originality/value

Maintenance planning of offshore wind farms is an area of current interest, although often the focus is on achieving cost reductions and not on the formal development of such a systematic approach as conceived in this paper.

Details

Journal of Quality in Maintenance Engineering, vol. 21 no. 4
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 6 June 2016

Kannan Govindan and Madan Shankar

The purpose of this paper is to evaluate the essential barrier and reveal the priority among common barriers to offshore wind energy in an Indian context with the assistance of…

Abstract

Purpose

The purpose of this paper is to evaluate the essential barrier and reveal the priority among common barriers to offshore wind energy in an Indian context with the assistance of the proposed framework.

Design/methodology/approach

Based on the proposed framework, a five-phase methodology was adapted to explore the essential barrier step by step. The common barriers, which were collected from the existing literatures through a systematic review, were further validated by field experts. The collected common barriers were evaluated with the assistance of the case industry’s field professionals through an analytical hierarchy process, a multi-criteria decision-making tool, to evaluate the barriers to Indian offshore wind energy.

Findings

Among the 12 common barriers to offshore wind energy, it is clear that “high capital cost” is the most essential barrier involved in the implementation of offshore wind energy farms in the Indian context.

Practical implications

This study reveals the importance of offshore wind power as a long-term profitable strategy to the case company within the Indian context. By addressing the essential barriers to the implementation of offshore wind farms, the Indian offshore wind system managers can train their employees to counteract the hindrances through the benchmarking of pioneering global offshore wind power developers such as Denmark and the UK. Further, this study provides useful suggestions to the Indian Government regarding policies for offshore wind energy; it also clearly projects the current status of the Indian offshore wind farm implementation.

Originality/value

This study assists Indian key stakeholders of offshore wind energy by indicating the essential barrier in an Indian context; they can remove the particular barrier instead of focusing on others that previous studies have identified. Further, this study brings out the importance of offshore wind power in an Indian context, which can urge stakeholders to invest more in offshore wind farms.

Details

International Journal of Energy Sector Management, vol. 10 no. 2
Type: Research Article
ISSN: 1750-6220

Keywords

Article
Publication date: 6 June 2016

Victoria Baagøe-Engels and Jan Stentoft

There is increasing research interest in the expansion of the offshore wind energy sector. Recent research shows that operations and maintenance (O&M) account for around 20-35 per…

Abstract

Purpose

There is increasing research interest in the expansion of the offshore wind energy sector. Recent research shows that operations and maintenance (O&M) account for around 20-35 per cent of the total energy costs in this sector. The purpose of this paper is to provide an overview of O&M issues in the offshore wind energy sector to propose initiatives that can help reduce the cost of energy used by offshore wind farms.

Design/methodology/approach

The paper is based on an in-depth literature review and a Delphi study of a panel of 16 experts on O&M.

Findings

Consisting primarily of conceptual papers and/or modelling papers, the extant literature identifies several challenges for O&M in the offshore wind energy sector. These challenges can be grouped into four categories: issues related with industry immatureness; distance/water depth; weather window; and policy issues. The Delphi study identified three other major issues that lead to increased O&M costs: too many predefined rules that limit development; lack of coordinated planning of the different services offered at the wind farms; and lack of a common approach on how O&M should be managed strategically.

Research limitations/implications

The present study is based only on Danish respondents. Future research needs to include various respondents from different countries to identify country-specific contingencies.

Practical implications

The paper provides an overview of the O&M issues in the offshore wind energy sector to prioritize where future resources should be invested and, thus, reduce O&M costs.

Originality/value

This is the first paper on O&M issues that bridges both literature studies and industry expert opinions.

Details

International Journal of Energy Sector Management, vol. 10 no. 2
Type: Research Article
ISSN: 1750-6220

Keywords

Article
Publication date: 7 April 2014

Christian Koch

The purpose of this paper is to develop a combined social constructivist, internal and external conceptualisation of the process of realising offshore wind farms, and to…

452

Abstract

Purpose

The purpose of this paper is to develop a combined social constructivist, internal and external conceptualisation of the process of realising offshore wind farms, and to investigate costs, time, delays and operational performance results of offshore wind farm power plant projects in Denmark and Sweden with a view to possible strategic misrepresentation.

Design/methodology/approach

Desk study of a sample of seven Danish and Swedish offshore wind farms using triangulation of publicly available material.

Findings

Some of the wind farm projects are successful and some less successful. In the latter group, budget and time overruns and under-performance are found. The paper discusses specific elements of possible strategic misrepresentation but finds a contradictory pattern. Also competences developed on the basis of experience do not produce clear results, since more recent wind farm performance is poorer than earlier.

Research limitations/implications

If desk research were combined with other methods, it would be possible to detect projects ' internal phenomena better.

Practical implications

There is a need to improve the efficiency of the wind farm building process and to improve the quality of offshore wind turbines, their foundations and cabling.

Originality/value

Renewable energy power plants comprise an important societal investment, yet their costs and possible cost reductions are poorly understood.

Details

Journal of Financial Management of Property and Construction, vol. 19 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 5 September 2017

Tove Brink

This paper aims to reveal how larger enterprises and small and medium-sized enterprises (SMEs) can enable innovation collaboration for enhanced competitiveness of the offshore wind

Abstract

Purpose

This paper aims to reveal how larger enterprises and small and medium-sized enterprises (SMEs) can enable innovation collaboration for enhanced competitiveness of the offshore wind energy sector.

Design/methodology/approach

The research is based on a longitudinal qualitative study starting in 2011 with a project-based network learning course with 15 SME wind farm suppliers and follow-up interviews with 10 SMEs and continued with interviews conducted with 20 individual enterprises within operation and maintenance conducted in 2014-2015.

Findings

The findings reveal challenges as well as opportunities for innovation collaboration between larger enterprises and SMEs to contribute to the innovation and competitiveness of the offshore wind farm sector. A glass ceiling is revealed for demand-driven positions if the SME does not possess rare and specific valuable knowledge. There are opportunities revealed in general for supplier-driven positions if SME suppliers can collaborate and develop interesting solutions for larger enterprises. If SMEs succeed in either of these aims, the SMEs have an opportunity to attain partner-driven collaboration. However, challenges are present according to the understanding of the different organisational approaches in SMEs and larger enterprises and in the different business approaches.

Research limitations/implications

The research is limited to the offshore wind energy sector. Further research is needed for verification of the findings in other energy sectors.

Originality/value

A fourfold contribution is made to enhance the understanding of innovation collaboration and to enable competitiveness for the offshore wind energy sector. SMEs, larger enterprises, academic researchers and policy bodies are provided with a model for action within the four positions for innovation collaboration.

Details

International Journal of Energy Sector Management, vol. 11 no. 4
Type: Research Article
ISSN: 1750-6220

Keywords

Article
Publication date: 6 March 2017

Federico D’Amico, Riccardo Mogre, Steve Clarke, Adam Lindgreen and Martin Hingley

In reference to the offshore-wind industry, this study aims to show that innovative purchasing and supply management practices can increase both firm- and industry-level…

1821

Abstract

Purpose

In reference to the offshore-wind industry, this study aims to show that innovative purchasing and supply management practices can increase both firm- and industry-level performance. This paper also includes a description of the offshore-wind supply chain, which remains understudied in academic literature, despite increasing global development of offshore-wind farms.

Design/methodology/approach

Offshore-wind farm projects use more and larger turbines, which greatly increase the complexity of the supply chain. Innovative purchasing and supply management practices, designed to tackle this growing complexity, could help companies achieve the key success factors that define this industry. The evidence comes from real-world, offshore-wind farm projects, with the London Array farm as a principal example.

Findings

Innovative purchasing and supply management practices include decisions to make or buy, contract forms and local-to-global sourcing. These practices affect the key success factors of the industry by increasing competition, capabilities and control.

Originality/value

Purchasing and supply management practices could affect industry-level performance. This paper is among the first ones to provide an analysis of the offshore-wind supply chain and its evolution.

Details

Journal of Business & Industrial Marketing, vol. 32 no. 2
Type: Research Article
ISSN: 0885-8624

Keywords

Article
Publication date: 6 June 2016

Kristian R. Petersen, Erik Skov Madsen and Arne Bilberg

This paper aims to explore how maintenance tasks can be planned and executed in a smarter way and, consequently, how the operations and maintenance of offshore wind power…

Abstract

Purpose

This paper aims to explore how maintenance tasks can be planned and executed in a smarter way and, consequently, how the operations and maintenance of offshore wind power installations can be improved through modularisation.

Design/methodology/approach

This is a case study of one of Europe’s leading offshore wind power operators with more than 1,000 wind turbine generators in operation. By focusing on this company, in-depth insights into its operations and maintenance processes are investigated.

Findings

Lean is identified to constitute an important first step before the modularisation of maintenance tasks. The modularisation of the maintenance of offshore wind farms is identified to reduce preventive maintenance times.

Practical implications

The paper develops a process to identify the resources needed for maintenance before the modularisation of maintenance tasks and resources can take place. The authors also establish a foundation for the development of a software tool to support the development of the modularisation of maintenance tasks.

Originality/value

The present study contributes to the rather immature field of research on the operations and maintenance of offshore wind power. Furthermore, it adds to the emerging research area of service modularity.

Details

International Journal of Energy Sector Management, vol. 10 no. 2
Type: Research Article
ISSN: 1750-6220

Keywords

Article
Publication date: 6 June 2016

Jan Stentoft, Ram Narasimhan and Thomas Poulsen

To support ongoing industry efforts to reduce the cost of energy (CoE) of offshore wind compared to other types of energy sources, researchers are applying scientific models and…

2072

Abstract

Purpose

To support ongoing industry efforts to reduce the cost of energy (CoE) of offshore wind compared to other types of energy sources, researchers are applying scientific models and thought processes to identify potential areas of improvement and optimization. This paper aims to introduce a conceptual framework from a supply chain management (SCM) perspective, aimed at promoting the reduction of CoE in the offshore wind energy industry.

Design/methodology/approach

Using conceptual arguments from current academic literature in SCM, a comprehensive framework is presented that clarifies how SCM practices can be used by offshore wind energy industry to reduce CoE.

Findings

The offshore wind energy sector is a young industry that must reduce CoE to compete with other forms of energy. Applying a supply chain perspective in the offshore wind industry has hitherto been limited to the academic community. This paper offers a SCM framework that includes three interdependent aspects of reducing CoE – innovation, industrialization and supplier partnering – to guide the industry towards sources to reduce CoE.

Research limitations/implications

SCM is a broad research area; thus, the presented framework to reduce the CoE is open for further development.

Practical implications

The paper provides insights into how the CoE can be reduced through innovation, industrialization and partnering in the offshore wind energy supply chain.

Originality/value

The paper offers a seminal contribution by introducing a SCM framework to understand sources and approaches to reduce CoE in the offshore wind energy industry.

Details

International Journal of Energy Sector Management, vol. 10 no. 2
Type: Research Article
ISSN: 1750-6220

Keywords

Case study
Publication date: 17 December 2019

Stuart Rosenberg

The following theoretical concepts are applicable to the case and its learning objectives: Stakeholder Power-Interest Matrix and Carroll’s Pyramid of Corporate Social…

Abstract

Theoretical basis

The following theoretical concepts are applicable to the case and its learning objectives: Stakeholder Power-Interest Matrix and Carroll’s Pyramid of Corporate Social Responsibility.

Research methodology

Information was obtained in three separate interviews with PSEG. In February 2018, an introductory phone conference was conducted with a number of senior managers within PSEG, including the Director of Development and Strategic Issues, Kate Gerlach. In April 2018, an onsite interview was conducted with Gerlach, who connected the author with Scott Jennings. A phone interview was conducted with Scott Jennings in May 2018 and follow-up communication with him was handled via e-mail. The information obtained from these interviews was supplemented by material obtained from secondary sources. None of the information in the case has been disguised.

Case overview/synopsis

Scott Jennings, a Vice President at PSEG, the diversified New Jersey-based energy company, was the project leader for a large commercial wind farm that was to be built off the coast. The project, Garden State Offshore Energy, a joint venture between PSEG and Deepwater Wind, an experienced developer of offshore wind projects, had been announced over six years earlier, in late 2008. In the time that had passed, the Garden State Offshore Energy project team had waited for the New Jersey Bureau of Public Utilities, which had been tasked by Governor Chris Christie to evaluate the project costs before it could authorize the actual construction of the wind turbines. Justifying the project on a cost basis proved to be difficult; despite the growing public sentiment in favor of projects that utilized renewable energy sources such as wind power, the Garden State Offshore Energy team was unable to move the project forward. Scott needed to decide whether it made sense to continue to hold regular meetings with the Garden State Offshore Energy team. Scott’s colleagues suggested that Scott speak with senior management at PSEG to find out if the resources that had been dedicated to the Garden State Offshore Energy project could be shifted to other projects that might be more feasible.

Complexity academic level

This case is suitable for courses in Sustainability. It is appropriate to use the case in undergraduate courses to illustrate decision making in a regulated industry. Sufficient information is presented in the case to debate both sides of the offshore wind authorization issue.

Details

The CASE Journal, vol. 16 no. 1
Type: Case Study
ISSN: 1544-9106

Keywords

1 – 10 of 503