Search results

1 – 10 of over 18000
Article
Publication date: 12 September 2023

Mohammad Hossein Dehghani Sadrabadi, Ahmad Makui, Rouzbeh Ghousi and Armin Jabbarzadeh

The adverse interactions between disruptions can increase the supply chain's vulnerability. Accordingly, establishing supply chain resilience to deal with disruptions and…

Abstract

Purpose

The adverse interactions between disruptions can increase the supply chain's vulnerability. Accordingly, establishing supply chain resilience to deal with disruptions and employing business continuity planning to preserve risk management achievements is of considerable importance. The aforementioned idea is discussed in this study.

Design/methodology/approach

This study proposes a multi-objective optimization model for employing business continuity management and organizational resilience in a supply chain for responding to multiple interrelated disruptions. The improved augmented e-constraint and the scenario-based robust optimization methods are adopted for multi-objective programming and dealing with uncertainty, respectively. A case study of the automotive battery manufacturing industry is also considered to ensure real-world conformity of the model.

Findings

The results indicate that interactions between disruptions remarkably increase the supply chain's vulnerability. Choosing a higher fortification level for the supply chain and foreign suppliers reduces disruption impacts on resources and improves the supply chain's resilience and business continuity. Facilities dispersion, fortification of facilities, lateral transshipment, order deferral policy, dynamic capacity planning and direct transportation of products to markets are the most efficient resilience strategies in the under-study industry.

Originality/value

Applying resource allocation planning and portfolio selection to adopt preventive and reactive resilience strategies simultaneously to manage multiple interrelated disruptions in a real-world automotive battery manufacturing industry, maintaining the long-term achievements of supply chain resilience using business continuity management and dynamic capacity planning are the main contributions of the presented paper.

Open Access
Article
Publication date: 25 March 2024

Hossein Shakibaei, Seyyed Amirmohammad Moosavi, Amir Aghsami and Masoud Rabbani

Throughout human history, the occurrence of disasters has been inevitable, leading to significant human, financial and emotional consequences. Therefore, it is crucial to…

Abstract

Purpose

Throughout human history, the occurrence of disasters has been inevitable, leading to significant human, financial and emotional consequences. Therefore, it is crucial to establish a well-designed plan to efficiently manage such situations when disaster strikes. The purpose of this study is to develop a comprehensive program that encompasses multiple aspects of postdisaster relief.

Design/methodology/approach

A multiobjective model has been developed for postdisaster relief, with the aim of minimizing social dissatisfaction, economic costs and environmental damage. The model has been solved using exact methods for different scenarios. The objective is to achieve the most optimal outcomes in the context of postdisaster relief operations.

Findings

A real case study of an earthquake in Haiti has been conducted. The acquired results and subsequent management analysis have effectively assessed the logic of the model. As a result, the model’s performance has been validated and deemed reliable based on the findings and insights obtained.

Originality/value

Ultimately, the model provides the optimal quantities of each product to be shipped and determines the appropriate mode of transportation. Additionally, the application of the epsilon constraint method results in a set of Pareto optimal solutions. Through a comprehensive examination of the presented solutions, valuable insights and analyses can be obtained, contributing to a better understanding of the model’s effectiveness.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2042-6747

Keywords

Article
Publication date: 12 January 2024

Pengyun Zhao, Shoufeng Ji and Yuanyuan Ji

This paper aims to introduce a novel structure for the physical internet (PI)–enabled sustainable supplier selection and inventory management problem under uncertain environments.

Abstract

Purpose

This paper aims to introduce a novel structure for the physical internet (PI)–enabled sustainable supplier selection and inventory management problem under uncertain environments.

Design/methodology/approach

To address hybrid uncertainty both in the objective function and constraints, a novel interactive hybrid multi-objective optimization solution approach combining Me-based fuzzy possibilistic programming and interval programming approaches is tailored.

Findings

Various numerical experiments are introduced to validate the feasibility of the established model and the proposed solution method.

Originality/value

Due to its interconnectedness, the PI has the opportunity to support firms in addressing sustainability challenges and reducing initial impact. The sustainable supplier selection and inventory management have become critical operational challenges in PI-enabled supply chain problems. This is the first attempt on this issue, which uses the presented novel interactive possibilistic programming method.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Open Access
Article
Publication date: 26 December 2023

Mehmet Kursat Oksuz and Sule Itir Satoglu

Disaster management and humanitarian logistics (HT) play crucial roles in large-scale events such as earthquakes, floods, hurricanes and tsunamis. Well-organized disaster response…

Abstract

Purpose

Disaster management and humanitarian logistics (HT) play crucial roles in large-scale events such as earthquakes, floods, hurricanes and tsunamis. Well-organized disaster response is crucial for effectively managing medical centres, staff allocation and casualty distribution during emergencies. To address this issue, this study aims to introduce a multi-objective stochastic programming model to enhance disaster preparedness and response, focusing on the critical first 72 h after earthquakes. The purpose is to optimize the allocation of resources, temporary medical centres and medical staff to save lives effectively.

Design/methodology/approach

This study uses stochastic programming-based dynamic modelling and a discrete-time Markov Chain to address uncertainty. The model considers potential road and hospital damage and distance limits and introduces an a-reliability level for untreated casualties. It divides the initial 72 h into four periods to capture earthquake dynamics.

Findings

Using a real case study in Istanbul’s Kartal district, the model’s effectiveness is demonstrated for earthquake scenarios. Key insights include optimal medical centre locations, required capacities, necessary medical staff and casualty allocation strategies, all vital for efficient disaster response within the critical first 72 h.

Originality/value

This study innovates by integrating stochastic programming and dynamic modelling to tackle post-disaster medical response. The use of a Markov Chain for uncertain health conditions and focus on the immediate aftermath of earthquakes offer practical value. By optimizing resource allocation amid uncertainties, the study contributes significantly to disaster management and HT research.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2042-6747

Keywords

Article
Publication date: 12 September 2023

Kemal Subulan and Adil Baykasoğlu

The purpose of this study is to develop a holistic optimization model for an integrated sustainable fleet planning and closed-loop supply chain (CLSC) network design problem under…

Abstract

Purpose

The purpose of this study is to develop a holistic optimization model for an integrated sustainable fleet planning and closed-loop supply chain (CLSC) network design problem under uncertainty.

Design/methodology/approach

A novel mixed-integer programming model that is able to consider interactions between vehicle fleet planning and CLSC network design problems is first developed. Uncertainties of the product demand and return fractions of the end-of-life products are handled by a chance-constrained stochastic program. Several Pareto optimal solutions are generated for the conflicting sustainability objectives via compromise and fuzzy goal programming (FGP) approaches.

Findings

The proposed model is tested on a real-life lead/acid battery recovery system. By using the proposed model, sustainable fleet plans that provide a smaller fleet size, fewer empty vehicle repositions, minimal CO2 emissions, maximal vehicle safety ratings and minimal injury/illness incidence rate of transport accidents are generated. Furthermore, an environmentally and socially conscious CLSC network with maximal job creation in the less developed regions, minimal lost days resulting from the work's damages during manufacturing/recycling operations and maximal collection/recovery of end-of-life products is also designed.

Originality/value

Unlike the classical network design models, vehicle fleet planning decisions such as fleet sizing/composition, fleet assignment, vehicle inventory control, empty repositioning, etc. are also considered while designing a sustainable CLSC network. In addition to sustainability indicators in the network design, sustainability factors in fleet management are also handled. To the best of the authors' knowledge, there is no similar paper in the literature that proposes such a holistic optimization model for integrated sustainable fleet planning and CLSC network design.

Open Access
Article
Publication date: 22 December 2022

Oluwatoyin Esther Akinbowale, Heinz Eckart Klingelhöfer and Mulatu Fekadu Zerihun

This study aims to investigate the feasibility of employing a multi-objectives integer-programming model for effective allocation of resources for cyberfraud mitigation. The…

Abstract

Purpose

This study aims to investigate the feasibility of employing a multi-objectives integer-programming model for effective allocation of resources for cyberfraud mitigation. The formulated objectives are the minimisation of the total allocation cost of the anti-fraud capacities and the maximisation of the forensic accounting capacities in all cyberfraud incident prone spots.

Design/methodology/approach

From the literature survey conducted and primary qualitative data gathered from the 17 licenced banks in South Africa on fraud investigators, the suggested fraud investigators are the organisation’s finance department, the internal audit committee, the external risk manager, accountants and forensic accountants. These five human resource capacities were considered for the formulation of the multi-objectives integer programming (MOIP) model. The MOIP model is employed for the optimisation of the employed capacities for cyberfraud mitigation to ensure the effective allocation and utilisation of human resources. Thus, the MOIP model is validated by a genetic algorithm (GA) solver to obtain the Pareto-optimum solution without the violation of the identified constraints.

Findings

The formulated objective functions are optimised simultaneously. The Pareto front for the two objectives of the MOIP model comprises the set of optimal solutions, which are not dominated by any other feasible solution. These are the feasible choices, which indicate the suitability of the MOIP to achieve the set objectives.

Practical implications

The results obtained indicate the feasibility of simultaneously achieving the minimisation of the total allocation cost of the anti-fraud capacities, or the maximisation of the forensic accounting capacities in all cyberfraud incident prone spots – or the trade-off between them, if they cannot be reached simultaneously. This study recommends the use of an iterative MOIP framework for decision-makers which may aid decision-making with respect to the allocation and utilisation of human resources.

Originality/value

The originality of this work lies in the development of multi-objectives integer-programming model for effective allocation of resources for cyberfraud mitigation.

Details

Journal of Financial Crime, vol. 30 no. 6
Type: Research Article
ISSN: 1359-0790

Keywords

Open Access
Article
Publication date: 19 July 2022

Ilkan Sarigol, Rifat Gurcan Ozdemir and Erkan Bayraktar

This paper focuses on multi-objective order allocation with product substitution for the vaccine supply chain under uncertainty.

Abstract

Purpose

This paper focuses on multi-objective order allocation with product substitution for the vaccine supply chain under uncertainty.

Design/methodology/approach

The weighted-sum minimization approach is used to find a compromised solution between three objectives of minimizing inefficiently vaccinated people, postponed vaccinations, and purchasing costs. A mixed-integer formulation with substitution quantities is proposed, subject to capacity and demand constraints. The substitution ratios between vaccines are assumed to be exogenous. Besides, uncertainty in supplier reliability is formulated using optimistic, most likely, and pessimistic scenarios in the proposed optimization model.

Findings

Covid-19 vaccine supply chain process is studied for one government and three vaccine suppliers as an illustrative example. The results provide essential insights for the governments to have proper vaccine allocation and support governments to manage the Covid-19 pandemic.

Originality/value

This paper considers the minimization of postponement in vaccination plans and inefficient vaccination and purchasing costs for order allocation among different vaccine types. To the best of the authors’ knowledge, there is no study in the literature on order allocation of vaccine types with substitution. The analytical hierarchy process structure of the Covid-19 pandemic also contributes to the literature.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 13 no. 2
Type: Research Article
ISSN: 2042-6747

Keywords

Article
Publication date: 6 July 2022

Pouyan Mahdavi-Roshan and Seyed Meysam Mousavi

Most projects are facing delays, and accelerating the pace of project progress is a necessity. Project managers are responsible for completing the project on time with minimum…

Abstract

Purpose

Most projects are facing delays, and accelerating the pace of project progress is a necessity. Project managers are responsible for completing the project on time with minimum cost and with maximum quality. This study provides a trade-off between time, cost, and quality objectives to optimize project scheduling.

Design/methodology/approach

The current paper presents a new resource-constrained multi-mode time–cost–quality trade-off project scheduling model with lags under finish-to-start relations. To be more realistic, crashing and overlapping techniques are utilized. To handle uncertainty, which is a source of project complexity, interval-valued fuzzy sets are adopted on several parameters. In addition, a new hybrid solution approach is developed to cope with interval-valued fuzzy mathematical model that is based on different alpha-levels and compensatory methods. To find the compatible solution among conflicting objectives, an arithmetical average method is provided as a compensatory approach.

Findings

The interval-valued fuzzy sets approach proposed in this paper is denoted to be scalable, efficient, generalizable and practical in project environments. The results demonstrated that the crashing and overlapping techniques improve time–cost–quality trade-off project scheduling model. Also, interval-valued fuzzy sets can properly manage expressions of the uncertainty of projects which are realistic and practical. The proposed mathematical model is validated by solving a medium-sized dataset an adopted case study. In addition, with a sensitivity analysis approach, the solutions are compared and the model performance is confirmed.

Originality/value

This paper introduces a new continuous-based, resource-constrained, and multi-mode model with crashing and overlapping techniques simultaneously. In addition, a new hybrid compensatory solution approach is extended based on different alpha-levels to handle interval-valued fuzzy multi-objective mathematical model of project scheduling with influential uncertain parameters.

Details

Kybernetes, vol. 52 no. 10
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 5 February 2024

Ahsan Haghgoei, Alireza Irajpour and Nasser Hamidi

This paper aims to develop a multi-objective problem for scheduling the operations of trucks entering and exiting cross-docks where the number of unloaded or loaded products by…

Abstract

Purpose

This paper aims to develop a multi-objective problem for scheduling the operations of trucks entering and exiting cross-docks where the number of unloaded or loaded products by trucks is fuzzy logistic. The first objective function minimizes the maximum time to receive the products. The second objective function minimizes the emission cost of trucks. Finally, the third objective function minimizes the number of trucks assigned to the entrance and exit doors.

Design/methodology/approach

Two steps are implemented to validate and modify the proposed model. In the first step, two random numerical examples in small dimensions were solved by GAMS software with min-max objective function as well as genetic algorithms (GA) and particle swarm optimization. In the second step, due to the increasing dimensions of the problem and computational complexity, the problem in question is part of the NP-Hard problem, and therefore multi-objective meta-heuristic algorithms are used along with validation and parameter adjustment.

Findings

Therefore, non-dominated sorting genetic algorithm (NSGA-II) and non-dominated ranking genetic algorithm (NRGA) are used to solve 30 random problems in high dimensions. Then, the algorithms were ranked using the TOPSIS method for each problem according to the results obtained from the evaluation criteria. The analysis of the results confirms the applicability of the proposed model and solution methods.

Originality/value

This paper proposes mathematical model of truck scheduling for a real problem, including cross-docks that play an essential role in supply chains, as they could reduce order delivery time, inventory holding costs and shipping costs. To solve the proposed multi-objective mathematical model, as the problem is NP-hard, multi-objective meta-heuristic algorithms are used along with validation and parameter adjustment. Therefore, NSGA-II and NRGA are used to solve 30 random problems in high dimensions.

Details

Journal of Modelling in Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1746-5664

Keywords

Article
Publication date: 11 May 2023

Farbod Zahedi, Hamidreza Kia and Mohammad Khalilzadeh

The vehicle routing problem (VRP) has been widely investigated during last decades to reduce logistics costs and improve service level. In addition, many researchers have realized…

Abstract

Purpose

The vehicle routing problem (VRP) has been widely investigated during last decades to reduce logistics costs and improve service level. In addition, many researchers have realized the importance of green logistic system design in decreasing environmental pollution and achieving sustainable development.

Design/methodology/approach

In this paper, a bi-objective mathematical model is developed for the capacitated electric VRP with time windows and partial recharge. The first objective deals with minimizing the route to reduce the costs related to vehicles, while the second objective minimizes the delay of arrival vehicles to depots based on the soft time window. A hybrid metaheuristic algorithm including non-dominated sorting genetic algorithm (NSGA-II) and teaching-learning-based optimization (TLBO), called NSGA-II-TLBO, is proposed for solving this problem. The Taguchi method is used to adjust the parameters of algorithms. Several numerical instances in different sizes are solved and the performance of the proposed algorithm is compared to NSGA-II and multi-objective simulated annealing (MOSA) as two well-known algorithms based on the five indexes including time, mean ideal distance (MID), diversity, spacing and the Rate of Achievement to two objectives Simultaneously (RAS).

Findings

The results demonstrate that the hybrid algorithm outperforms terms of spacing and RAS indexes with p-value <0.04. However, MOSA and NSGA-II algorithms have better performance in terms of central processing unit (CPU) time index. In addition, there is no meaningful difference between the algorithms in terms of MID and diversity indexes. Finally, the impacts of changing the parameters of the model on the results are investigated by performing sensitivity analysis.

Originality/value

In this research, an environment-friendly transportation system is addressed by presenting a bi-objective mathematical model for the routing problem of an electric capacitated vehicle considering the time windows with the possibility of recharging.

1 – 10 of over 18000