Search results

1 – 10 of 18
Article
Publication date: 1 December 2020

Okechukwu Nwadigo, Nicola Naismith Naismith, Ali Ghaffarianhoseini, Amirhosein Ghaffarian Hoseini and John Tookey

A construction project is complex and requires dynamic modelling of a range of factors that deters time performance because of uncertainty and varying operating conditions. In…

Abstract

Purpose

A construction project is complex and requires dynamic modelling of a range of factors that deters time performance because of uncertainty and varying operating conditions. In construction project systems, the system components are the interconnected stages, which are time-dependent. Within the project stages are the activities which are the subsystems of the system components, causing a challenge to the analysis of the complex system. The relationship of construction project time management (CTM) with the construction project time influencing factors (CTFs) and the adaptability of the time-varying system is a key part of project effectiveness. This study explores the relationship between CTM and CTF, including the potentials to add dynamical changes on every project stage.

Design/methodology/approach

This study proposed a dynamic Bayesian network (DBN) model to examine the relationship between CTM and CTF. The model investigates the time performance of a construction project that enhances decision-making. First, the paper establishes a model of probabilistic reasoning and directed acrylic graph (DAG). Second, the study tests the dynamic impact (IM) of CTM-CTF on the project stages over a specific time, including the adaptability of time performance during disruptive CTF events. In demonstrating the effectiveness of the model, the authors selected one-organisation-single-location road-improvement project as the case study. Next, the confirmation of the model internal validity relied on conditional probabilities and the project knowledge experts' selected from the case company.

Findings

The study produced structural dependencies of CTM and CTF with probability observations at each stage. A predictive time performance analysis of the model at different scenarios evaluates the adaptability of CTM during CTF uncertain events. The case demonstration of the model application shows that CTFs have effects on CTM strategy, creating the observations to help time performance restorations after disruptions.

Research limitations/implications

Although the case company experts' panel confirms the internal validity of the results for managing time, the model used conditional probability table (CPT) and project state values from a project contract. A project-wide application then will require multi-case data and data-mining process for generating the CPTs.

Practical implications

The study developed a method for evaluating both quantitative and qualitative relationships between CTM and CTF, besides the knowledge to enhance CTM practice and research. In construction, the project team can use model observations to implement time performance restorations after a predictive or reactive disruption, which enhances decision-making.

Originality/value

The model used qualitative and qualitative data of a complex system to generate results, bounded by a range of probability distributions for CTM-CTF interconnections during time performance disruptions and restorations. The research explores the approach that can complement the mental CTM-CTF modeling of the project team. The CTM-CTF relationship model developed in this research is fundamental knowledge for future research, besides the valuable insight into CTF influence on CTM.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 February 2024

Dat Tien Doan, Tuyet Phuoc Anh Mai, Ali GhaffarianHoseini, Amirhosein Ghaffarianhoseini and Nicola Naismith

This study aims to identify the primary research areas of modern methods of construction (MMC) along with its current trends and developments.

Abstract

Purpose

This study aims to identify the primary research areas of modern methods of construction (MMC) along with its current trends and developments.

Design/methodology/approach

A combination of bibliometric and qualitative analysis is adopted to examine 1,957 MMC articles in the Scopus database. With the support of CiteSpace 6.1.R6, the clusters, leading authors, journals, institutions and countries in the field of MMC are examined.

Findings

Offsite construction, inter-modular connections, augmenting output, prefabricated concrete beams and earthquake-resilient prefabricated beam–column steel joints are the top five research areas in MMC. Among them, offsite construction and inter-modular connections are significantly focused, with many research articles. The potential for collaboration, among prominent authors such as Wang, J., Liu, Y. and Wang, Y., explains the recent rapid growth of the MMC field of research. With a total of 225 articles, Engineering Structures is the journal that has published the most articles on MMC. China is the leading country in this field, and the Ministry of Education China is the top institution in MMC.

Originality/value

The findings of this study bear significant implications for stakeholders in academia and industry alike. In academia, these insights allow researchers to identify research gaps and foster collaboration, steering efforts toward innovative and impactful outcomes. For industries using MMC practices, the clarity provided on MMC techniques facilitates the efficient adoption of best practices, thereby promoting collaboration, innovation and global problem-solving within the construction field.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 December 2023

Dat Tien Doan, Ali Ghaffarianhoseini, Nicola Naismith, Amirhosein Ghaffarianhoseini and John Tookey

In New Zealand, building information modelling (BIM) prevalence is still in its early stages and faces many challenges. This research aims to develop a BIM adoption framework to…

Abstract

Purpose

In New Zealand, building information modelling (BIM) prevalence is still in its early stages and faces many challenges. This research aims to develop a BIM adoption framework to determine the key factors affecting the success of a BIM project.

Design/methodology/approach

Both primary and secondary data were employed in this research, including 21 semi-structured interviews and industry guidelines from the three most well-known global building excellence models (BEMs). The data were analysed through content analysis due to its recognised benefits as a transparent and reliable approach.

Findings

Leadership, clients and other stakeholders, strategic planning, people, resources, process and results were identified as seven main categories along with 39 indicators in the BIM adoption framework. Based on the interviewees' perspectives, leadership is considered the most significant category, impacting all of the remaining categories.

Practical implications

Using the developed framework will enhance comprehension of BIM, offering directives for those embracing BIM. This will aid construction stakeholders in being better equipped for BIM projects. Having a skilled BIM manager can lead to the success of construction projects.

Originality/value

This research contributed to the existing body of knowledge by providing the categories with specific factors that assist BIM practitioners in assessing their BIM performance for further BIM practice improvement.

Article
Publication date: 23 November 2022

Megan Burfoot, Ali GhaffarianHoseini, Amirhosein Ghaffarianhoseini and Nicola Naismith

To maximise acoustic comfort in a classroom, the acoustic conditions of the space should be variable. So, the optimal acoustic state also changes when the classroom changes from a…

Abstract

Purpose

To maximise acoustic comfort in a classroom, the acoustic conditions of the space should be variable. So, the optimal acoustic state also changes when the classroom changes from a study environment into a lecture environment. Passive Variable Acoustic Technology (PVAT) alters a room’s Reverberation Time (RT) by changing the total sound absorption in a room. The purpose of this paper is to evaluate the improvements to classroom acoustic comfort when using PVAT.

Design/methodology/approach

The study is conducted in an existing tertiary classroom at Auckland University of Technology, New Zealand. The PVAT is prototyped, and the RTs are measured according to international standards before and after classroom installation. The acoustic measurement method used is a cost-effective application tool where pre- and post-conditions are of primary concern.

Findings

PVAT is found to offer statistically significant improvements in RT, but the key benefits are realised in its’ ability to vary RT for different classroom situations. It is predicted that the RT recommendations for two room types outlined in the acoustic standard AS/NZS 2107:2016 are satisfied when using PVAT in a single classroom space. By optimising RT, the acoustic comfort during both study and lecture is significantly improved.

Originality/value

When PVAT is combined with an intelligent system – Intelligent Passive Room Acoustic Technology (IPRAT) – it can detect sound waves in real time to identify the optimal RT. This paper details a pilot case study that works towards quantifying the benefits of IPRAT, by prototyping and testing the PVAT component of the system.

Highlights

  1. A pilot case study outlines the development and test of a variable acoustic prototype in a tertiary classroom

  2. A method is adopted to measure acoustic conditions, using three under-researched Android applications

  3. The benefits of PVAT are realised in its ability to vary RT by adjusting the prototypes’ sound absorption

  4. By using PVAT in a single space, the recommended RTs for two room types outlined in the acoustic standard AS/NZS 2107:2016 can be satisfied

  5. The improvements in acoustic comfort due to PVAT are statistically significant

A pilot case study outlines the development and test of a variable acoustic prototype in a tertiary classroom

A method is adopted to measure acoustic conditions, using three under-researched Android applications

The benefits of PVAT are realised in its ability to vary RT by adjusting the prototypes’ sound absorption

By using PVAT in a single space, the recommended RTs for two room types outlined in the acoustic standard AS/NZS 2107:2016 can be satisfied

The improvements in acoustic comfort due to PVAT are statistically significant

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 30 August 2022

Megan Burfoot, Nicola Naismith, Ali GhaffarianHoseini and Amirhosein Ghaffarianhoseini

Informed by acoustic design standards, the built environments are designed with single reverberation times (RTs), a trade-off between long and short RTs needed for different space…

Abstract

Purpose

Informed by acoustic design standards, the built environments are designed with single reverberation times (RTs), a trade-off between long and short RTs needed for different space functions. The novel intelligent passive room acoustic technology (IPRAT) has the potential to revolutionise room acoustics, thus, it is imperative to analyse and quantify its effect. IPRAT achieves real-time room acoustic improvement by integrating passive variable acoustic technology (PVAT) and acoustic scene classification (ASC). This paper aims to compare IPRAT simulation results with the AS/NZS 2107:2016 Australian/New Zealand recommended design acoustic standards.

Design/methodology/approach

In this paper 20 classroom environments are virtually configured for the simulation, multiplying 5 classrooms with 4 aural situations typical to New Zealand classrooms. The acoustic parameters RT, sound clarity (C50) and sound strength (G) are considered and analysed in the simulation. These parameters can be used to determine the effects of improved acoustics for both teacher vocal relief and student comprehension. The IPRAT was assumed to vary RT and was represented in the simulation by six different absorption coefficient spectrums.

Findings

The optimised acoustic parameters were derived from relationships between C50, RT and G. These relationships and optimal RTs contribute a unique database to literature. IPRAT’s advantages were discerned from a comparison of “current,” “attainable” and “optimised” acoustic parameters.

Originality/value

By quantifying the effect of IPRAT, it is understood that IPRAT has the potential to satisfy the key recommendations of professional industry standards (for New Zealand namely; AS/NZS 2107:2016 recommended design acoustic standards).

Details

Smart and Sustainable Built Environment, vol. 12 no. 5
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 22 March 2024

Saghar Hashemi, Amirhosein Ghaffarianhoseini, Ali Ghaffarianhoseini, Nicola Naismith and Elmira Jamei

Given the distinct and unique climates in these countries, research conducted in other parts of the world may not be directly applicable. Therefore, it is crucial to conduct…

Abstract

Purpose

Given the distinct and unique climates in these countries, research conducted in other parts of the world may not be directly applicable. Therefore, it is crucial to conduct research tailored to the specific climatic conditions of Australia and New Zealand to ensure accuracy and relevance.

Design/methodology/approach

Given population growth, urban expansions and predicted climate change, researchers should provide a deeper understanding of microclimatic conditions and outdoor thermal comfort in Australia and New Zealand. The study’s objectives can be classified into three categories: (1) to analyze previous research works on urban microclimate and outdoor thermal comfort in Australia and New Zealand; (2) to highlight the gaps in urban microclimate studies and (3) to provide a summary of recommendations for the neglected but critical aspects of urban microclimate.

Findings

The findings of this study indicate that, despite the various climate challenges in these countries, there has been limited investigation. According to the selected papers, Melbourne has the highest number of microclimatic studies among various cities. It is a significant area for past researchers to examine people’s thermal perceptions in residential areas during the summer through field measurements and surveys. An obvious gap in previous research is investigating the impacts of various urban contexts on microclimatic conditions through software simulations over the course of a year and considering the predicted future climate changes in these countries.

Originality/value

This paper aims to review existing studies in these countries, provide a foundation for future research, identify research gaps and highlight areas requiring further investigation.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 15 May 2023

Funmilayo Ebun Rotimi, Marcela Brauner, Megan Burfoot, Nicola Naismith, C.W. Chathurani Silva and Mahsa Mohaghegh

This study aims to determine the effects of sexism and unfavourable job conditions on women's mental and physical wellbeing in construction operations. In addition, this study…

Abstract

Purpose

This study aims to determine the effects of sexism and unfavourable job conditions on women's mental and physical wellbeing in construction operations. In addition, this study will establish the mediating role of work morale in the association between workplace challenges and wellbeing.

Design/methodology/approach

Data for this study were obtained from women working in office environments, onsite professionals and those in trades. A total of 65 participants responded to the survey. The partial least square structural equation modelling method was applied to validate the measurement model and test the hypotheses.

Findings

The findings demonstrate that benevolent and hostile sexism directly influences work morale and indirectly affects women's mental and physical wellbeing in the construction industry. Hostile sexism is the most significant challenge for female construction workers in New Zealand.

Research limitations/implications

The finding is theory-building and challenges the assumptions that the nature of the construction industry has a bearing on the mental and physical health of women in construction. In addition, the finding is useful for creating positive work environments that are both inclusive and empathetic to the diverse needs of the modern-day construction workforce. Thus, reducing the challenges experienced by construction women's workforce.

Originality/value

The current study focuses on women and those who identified themselves as such. The conclusions show the relevance of work morale to their mental wellbeing. This exploratory quantitative study contributes to research by advancing understanding of the challenges women face in the industry and the consequences of those challenges on their physical and mental wellbeing.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 June 2021

Okechukwu Bruno-Kizito Nwadigo, Nicola Naismith, Ali GhaffarianHoseini, Amirhosein GhaffarianHoseini and John Tookey

Dynamic planning and scheduling forms a widely adopted smart strategy for solving real-world problems in diverse business systems. This paper uses deductive content analysis to…

Abstract

Purpose

Dynamic planning and scheduling forms a widely adopted smart strategy for solving real-world problems in diverse business systems. This paper uses deductive content analysis to explore secondary data from previous studies in dynamic planning and scheduling to draw conclusions on its current status, forward action and research needs in construction management.

Design/methodology/approach

The authors searched academic databases using planning and scheduling keywords without a periodic setting. This research collected secondary data from the database to draw an objective comparison of categories and conclusions about how the data relates to planning and scheduling to avoid the subjective responses from questionnaires and interviews. Then, applying inclusion and exclusion criteria, we selected one hundred and four articles. Finally, the study used a seven-step deductive content analysis to develop the categorisation matrix and sub-themes for describing the dynamic planning and scheduling categories. The authors used deductive analysis because of the secondary data and categories comparison. Using the event types represented in a quadrant mapping, authors delve into where, when, application and benefits of the classes.

Findings

The content analysis showed that all the accounts and descriptions of dynamic planning and scheduling are identifiable in an extensive research database. The content analysis reveals the need for multi-hybrid (4D BIM-Agent based-discrete event-discrete rate-system dynamics) simulation modelling and optimisation method for proffering solutions to scheduling and planning problems, its current status, tools and obstacles.

Originality/value

This research reveals the deductive content analysis talent in construction research. It also draws direction, focuses and raises a question on dynamic planning and scheduling research concerning the five-integrated model, an opportunity for their integration, models combined attributes and insight into its solution viability in construction.

Details

Smart and Sustainable Built Environment, vol. 11 no. 4
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 9 July 2020

Dat Tien Doan, Ali GhaffarianHoseini, Nicola Naismith, Amirhosein Ghaffarianhoseini, Tongrui Zhang and John Tookey

This research aims to explore the perspectives of the key actors in the New Zealand construction industry towards BIM adoption. Specifically, four themes are examined, including…

1374

Abstract

Purpose

This research aims to explore the perspectives of the key actors in the New Zealand construction industry towards BIM adoption. Specifically, four themes are examined, including what BIM is; BIM knowledge and understanding; benefits of BIM adoption; and challenges/barriers to BIM adoption.

Design/methodology/approach

A qualitative approach using 21 semi-structured interviews with industry experts was adopted.

Findings

The results raise a question concerning whether the New Zealand construction industry needs a unique definition of BIM to achieve a clear and consistent understanding amongst construction practitioners. It was found out that most of the construction practitioners in New Zealand are not well aware of BIM, especially the contractors, QSs, supply chain companies and the SMEs. Fourteen potential benefits and ten barriers/challenges to BIM adoption were identified. Individually, time-saving was considered as the most benefit of BIM adoption while BIM understanding was suggested as the most significant barrier by all the interviewees.

Originality/value

The research provides valuable insights into BIM understanding as well as recommendations regarding BIM adoption in New Zealand. The results could be considered baseline information for the companies and government to have effective strategies towards BIM adoption. Furthermore, it confirms that characteristics such as benefits and barriers to BIM adoption amongst different countries could be similar. Therefore, it could be useful to analyse the studies, strategies and practices of the pioneer countries in BIM adoption for the implementation.

Details

Smart and Sustainable Built Environment, vol. 10 no. 4
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 7 September 2021

Dat Tien Doan, Ali GhaffarianHoseini, Nicola Naismith, Amirhosein Ghaffarianhoseini, Tongrui Zhang and John Tookey

Green building information modelling (BIM) has been highlighted as an essential topic owing to its potential benefits. However, both Green Star and BIM are still in their earlier…

Abstract

Purpose

Green building information modelling (BIM) has been highlighted as an essential topic owing to its potential benefits. However, both Green Star and BIM are still in their earlier stages in New Zealand. This paper aims to examine and evaluate the benefits, barriers/challenges and solutions for the integration of Green Star and BIM in New Zealand.

Design/methodology/approach

In this paper, a total of 77 responses collected from construction professionals in New Zealand using questionnaires were analysed through descriptive and statistical tests.

Findings

Building performance modelling used for Green Star assessment can be implemented using BIM; this was highlighted as the most significant benefit of the integration. Whereas, the most significant barrier preventing the integration of Green Star and BIM was the fact they are two completely separate processes. Regarding the solutions for the integration, showcasing BIM-Green Star benchmark projects was considered as the most effective solution amongst a range of eight provided.

Originality/value

The research provided insights into Green Star–BIM integration in New Zealand. By evaluating the significance of the benefits, barriers/challenges and solutions for the integration, this research could be used as a guideline for Green Star and BIM development by New Zealand Green Building Council (NZGBC), the Government and construction practitioners in New Zealand. Specifically, the results here could be valuable inputs for Green Star manuals and the New Zealand BIM handbook.

Details

Smart and Sustainable Built Environment, vol. 12 no. 1
Type: Research Article
ISSN: 2046-6099

Keywords

1 – 10 of 18