Article
Publication date: 24 December 2020

Jessica Borg, Naomi Borg, Christina M. Scott-Young and Nader Naderpajouh

There is a need for project management practitioners to adapt and thrive in today's volatile, uncertain, complex and ambiguous (VUCA) project-based workplaces. In this paper, the…

1751

Abstract

Purpose

There is a need for project management practitioners to adapt and thrive in today's volatile, uncertain, complex and ambiguous (VUCA) project-based workplaces. In this paper, the linkage between work readiness and career resilience is developed, presenting both concepts as critical for effective strategic responses and adaptation to the changing labor market in organizations.

Design/methodology/approach

The resource-based view (RBV) and integrated dynamic capabilities (IDCs) are the theoretical lenses that are used to link the concepts of work readiness and career resilience across the individual and organizational levels.

Findings

A framework and model are proposed to establish a holistic understanding of catalysts for addressing the VUCA context that organizations face. The proposed conceptual linkage adds a chronological dimension to the formation of the interrelated dynamic capabilities during the early career phase of project management practitioners.

Practical implications

The contribution to the project management literature includes a theoretically driven conceptual framework that links two complementary concepts to address the career challenges faced by project managers. Work readiness is positioned as an enabler of career resilience and together they constitute vital attributes which foster talent retention in the current VUCA work environment.

Originality/value

Work readiness and career resilience are underexplored topics in the project management literature, both individually and in conjunction. Specifically, there is a research gap in view of linking these two concepts to present them as a catalyst for project management talent sustainability, and the proposed framework is an initial step in addressing these gaps.

Details

International Journal of Managing Projects in Business, vol. 14 no. 4
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 24 May 2018

Rana Khallaf, Nader Naderpajouh and Makarand Hastak

The purpose of this paper is to build upon the extensive application of risk registries in the construction literature and establish a systematic methodology to develop risk…

Abstract

Purpose

The purpose of this paper is to build upon the extensive application of risk registries in the construction literature and establish a systematic methodology to develop risk registries. Risk registries channel judgment of experts as a basis for risk analysis and should be tailored for each project to be more effective. Given their prevalence, there is a need for systematic integration of tacit and explicit knowledge to develop practical risk registries.

Design/methodology/approach

A combined approach is proposed using the systematic literature review (SLR) technique to integrate explicit knowledge and Delphi technique to integrate tacit knowledge in the development of risk registries. This two-step approach further increases the robustness of the registries by validating them through integrating and contrasting multiple forms of knowledge for a tailored risk registry.

Findings

The application of the proposed approach indicates that the use of multiple forms of knowledge can increase the robustness and practicality of risk registries. It also showcased its potential in the development of risk registries for complex projects. Examples include modification of risk factors obtained from the explicit sources of knowledge based on contextual tacit knowledge.

Originality/value

The proposed approach is an imperative step to standardize the development of risk registries. With its inherent validation process through integrating and contrasting tacit and explicit knowledge, practitioners can use this approach to develop practical risk registries for different categories of projects. Integrating different forms of knowledge can increase the impact of registries beyond risk assessment and in contexts such as decision making and performance assessment.

Details

Built Environment Project and Asset Management, vol. 8 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 26 February 2021

Pauline Teo, Akvan Gajanayake, Sajani Jayasuriya, Ali Izaddoost, Treshani Perera, Nader Naderpajouh and Peter S.P. Wong

This paper critically reviews economic impact assessment methods adopted in construction-related projects, to develop and present a novel bottom-up approach suitable to estimate…

Abstract

Purpose

This paper critically reviews economic impact assessment methods adopted in construction-related projects, to develop and present a novel bottom-up approach suitable to estimate regional economic impacts of building maintenance projects.

Design/methodology/approach

A thorough literature review of economic impact assessment in construction projects is carried out to identify the most relevant approach to estimate wider economic impacts of building maintenance projects. Based on these findings, a model based on the bottom-up approach to estimate wider economic impacts is developed. The applicability and face validity of the developed model is demonstrated through a case of cladding replacement program in Australia.

Findings

The literature review revealed that bottom-up models are better suited for estimating regional economic impacts of maintenance projects, given the challenges of obtaining micro-level economic data in the maintenance sector. In relation to the total economic impacts (direct and indirect), the results show that for every $1 of government spending on similar projects the Gross State Product would increase by $1.34. In terms of employment impact, over 70% of the direct economic value addition is driven by the increase in labour, where close to 3 FTE jobs will be required for each $1 million of spending on cladding replacement projects.

Originality/value

This paper presents a model to estimate the wider economic impacts of building maintenance projects, which is typically overlooked in the construction management field. The proposed model is developed to incorporate the variability of different building maintenance projects so that the economic impact resulting from these projects could be estimated more accurately. This model can be used by local government decision-makers to justify and prioritise maintenance projects in a similar manner to new construction projects.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 November 2017

Hamed Zamenian, Juyeong Choi, Seyed Amir Sadeghi and Nader Naderpajouh

The purpose of this paper is to develop a systemic approach to evaluate physical condition of water pipeline infrastructure with limited condition assessment data that can help…

Abstract

Purpose

The purpose of this paper is to develop a systemic approach to evaluate physical condition of water pipeline infrastructure with limited condition assessment data that can help asset managers prioritize capital investments in maintenance projects for urban water pipeline systems.

Design/methodology/approach

Spatial pattern analyses are conducted in this research to find the spatial pattern of the service life of pipelines. Based on the spatial relationship, the critical areas where groups of pipelines with short service life are likely to be found were located using spatial statistical analyses. A visualized platform was also developed and used to validate the implementation of the proposed approach with the case study of urban water pipeline infrastructure in a city in the Midwest region of the USA.

Findings

The results of the spatial pattern analyses reveal that water pipelines are spatially clustered based on their service life. Further, it was found that on average the pipelines in the center of a city have longer service life while the average expected service life of the pipelines in the marginal areas is shorter. The interpolation method produced raster data with continuous information about the service years of pipelines that are useful for asset maintenance planning.

Originality/value

With the limited data, the proposed approach enables identification of the critical area of water pipelines with the likelihood of shorter service life. This result can be used as a priority rule for a rehabilitation plan and contributes to shifting from a responsive to a preventive approach in underground asset management.

Details

Built Environment Project and Asset Management, vol. 7 no. 5
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 30 September 2020

Hossein Derakhshanfar, J. Jorge Ochoa, Konstantinos Kirytopoulos, Wolfgang Mayer and Craig Langston

The purpose of this research is to identify the most impactful delay risks in Australian construction projects, including the associations amongst those risks as well as the…

1163

Abstract

Purpose

The purpose of this research is to identify the most impactful delay risks in Australian construction projects, including the associations amongst those risks as well as the project phases in which they are most likely present. The correlation between project and organisational characteristics with the impact of delay risks was also studied.

Design/methodology/approach

A questionnaire survey was used to collect data from 118 delayed construction projects in Australia. Data were analysed to rank the most impactful delay risks, their correlation to project and organisational characteristics and project phases where those risks are likely to emerge. Association rule learning was used to capture associations between the delay risks.

Findings

The top five most impactful delay risks in Australia were changes by the owner, slow decisions by the owner, preparation and approval of design drawings, underestimation of project complexity and unrealistic duration imposed to the project, respectively. There is a set of delay risks that are mutually associated with project complexity. In addition, while delay risks associated with resources most likely arise in the execution phase, stakeholder and process-related risks are more smoothly distributed along all the project phases.

Originality/value

This research for the first time investigated the impact of delay risks, associations amongst them and project phases in which they are likely to happen in the Australian context. Also, this research for the first time sheds light on the project phases for the individual project delay risks which aids the project managers to understand where to focus on during each phase of the project.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords