Article
Publication date: 4 May 2020

Murat Gunduz and Hesham Ahmed Elsherbeny

This paper covers the development of a multidimensional contract administration performance model (CAPM) for construction projects. The proposed CAPM is intended to be…

Abstract

Purpose

This paper covers the development of a multidimensional contract administration performance model (CAPM) for construction projects. The proposed CAPM is intended to be used by the industry stakeholders to measure the construction contract administration (CCA) performance and identify the strengths and weaknesses of the CCA system for running or completed projects.

Design/methodology/approach

The research design follows a sequential mixed methodology of qualitative and quantitative data collection and analysis. In the first phase, contract administration indicators were collected from relevant literature. In the second phase, an online questionnaire was prepared, and data were collected and analyzed using the crisp value of fuzzy membership function, and structural equation modeling (SEM). The fuzzy set was chosen for this study due to the presence of uncertainty and fuzziness associated with the importance of several key indicators affecting the CCA performance. Finally, SEM was used to test and analyze interrelationships among constructs of CCA performance.

Findings

The data collected from 336 construction professionals worldwide through an online survey was utilized to develop the fuzzy structural equation model. The goodness-of-fit and reliability tests validated the model. The study concluded a significant correlation between CCA performance, CCA operational indicators, and the process groups.

Originality/value

The contribution of this paper to the existing knowledge is the development of a fuzzy structural equation model that serves as a measurement tool for the contract administration performance. This is the first quantitative structural equation model to capture contract administration performance. The model consists of 93 Construction Contract Administration(CCA) performance indicators categorized into 11 project management process groups namely: project governance and start-up; team management; communication and relationship management; quality and acceptance management; performance monitoring and reporting management; document and record management; financial management; changes and control management; claims and dispute resolution management; contract risk management and contract closeout management.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

To view the access options for this content please click here
Article
Publication date: 25 December 2020

Khalid Naji, Murat Gunduz and Fatema Salat

The construction sector has a global reach, and construction professionals worldwide often encounter challenges in delivering a project on time and within the assigned…

Abstract

Purpose

The construction sector has a global reach, and construction professionals worldwide often encounter challenges in delivering a project on time and within the assigned budget. Hence, this paper aims to investigate the preproject factors that most affect the performance of construction projects.

Design/methodology/approach

A literature review was conducted to identify these factors from previous research, after which a questionnaire was developed and distributed to construction industry professionals worldwide. The response data were collected and analyzed using several methods, including Cronbach’s alpha, Relative Importance Index (RII), Kruskal–Wallis test, and Spearman’s and Pearson correlations.

Findings

The results highlight four categories of significance, namely design, stakeholder, engineering, and procurement, with 31 factors being assigned to these categories. The relationships between each factor based on the categories established in the survey are then presented. With the help of data analysis, focusing on these significant preproject factors will help management teams to evaluate and improve the preconstruction process to achieve a higher project success rate.

Originality/value

This study differs from other studies in the literature by gathering all relevant preconstruction success factors by an extensive literature review. Finally, highly ranked factors are studied in detail for a better understanding of the impact of preconstruction factors on project performance. This study is supported by powerful tests such as Kruskal–Wallis test and Spearman’s correlation to study the perception of different groups on preconstruction factors. Furthermore, the data analysis will help in identifying and avoiding the failure part of the previous projects and will improve the planning and/or forecasting of the new projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

To view the access options for this content please click here
Article
Publication date: 25 November 2020

Okan Sirin, Murat Gunduz and Mohammed E. Shamiyeh

Pavement is one of the main elements of the roads network. It is extremely essential to study and understand the factors affecting its performance and highlight the most…

Abstract

Purpose

Pavement is one of the main elements of the roads network. It is extremely essential to study and understand the factors affecting its performance and highlight the most important ones for decision-makers and pavement experts to consider during the design, construction and maintenance stages. The purpose of this paper was to identify the factors affecting pavement performance and rank them according to their importance using Analytic Hierarchy Process (AHP) for decision-makers and pavement experts to consider during the design, construction and maintenance stages.

Design/methodology/approach

A survey was developed considering 29 factors found in the literature that affect pavement performance. The survey was sent to pavement professionals in Qatar to rate their perception of factors affecting pavement performance to enhance roads' sustainability. 205 responses were collected and analyzed using AHP.

Findings

The findings indicate that the factor “unconsidered heavy vehicles volume” is the most critical factor that affects pavement performance. The second most critical factor affecting the pavement performance is the “low asphalt content” due to escalating binder aging, reducing fatigue life of the pavement and decreasing the durability of roads. The third and fourth factors are “poor mechanical and thermal properties” and “unexpected high traffic volume,” respectively. These two factors are strongly attached to the first and second factors since the traffic volume affects the pavement performance less but similar to the heavy vehicles and a mix with poor mechanical and thermal properties is related indirectly to the asphalt content in the mix.

Originality/value

The research provides help for decision-makers in the construction industry to improve the performance of pavements using a multi-criteria decision-making tool. This paper's outcome would help the pavement management professionals in the construction industry to improve pavement performance and management, increase the pavement's life cycle and reduce maintenance costs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

To view the access options for this content please click here
Book part
Publication date: 10 February 2020

Seval Kardeş Selimoğlu and Mehtap Altunel

Along with accounting scandals in the past, academics, researchers, and legislators have focused on fraud. The purpose of this study is to examine postgraduate and…

Abstract

Along with accounting scandals in the past, academics, researchers, and legislators have focused on fraud. The purpose of this study is to examine postgraduate and doctoral studies, articles, and books about forensic accounting and fraud audit published between the years 2008 and 2018 in Turkey. For this purpose, a total of 96 studies have been examined and 35 of these are master’s theses, 10 of them are PhD theses, 45 of them are articles, and six of them are books. These studies were presented in tables as classified. The studies examined in our research are summarized as year they were published, the author, and the scope of the topic and in terms of results. The conclusions of this study can be summarized as follows: (a) the majority of thesis published about forensic accounting and fraud audit are in 2011 and following years. In addition, most of the theses are focused on forensic accounting review rather than fraud audit. (b) Results in the articles reviewed are in the same direction with theses. (c) There are very few books about fraud audit and forensic accounting. One of them is related to fraud audit, while the rest of them are related to forensic accounting and forensic accounting profession. We suggest extending the scope of the study and making to other countries.

Details

Contemporary Issues in Audit Management and Forensic Accounting
Type: Book
ISBN: 978-1-83867-636-0

Keywords

To view the access options for this content please click here
Article
Publication date: 18 November 2019

Hossein Derakhshanfar, J. Jorge Ochoa, Konstantinos Kirytopoulos, Wolfgang Mayer and Vivian W.Y. Tam

The purpose of this paper is to systematically develop a delay risk terminology and taxonomy. This research also explores two external and internal dimensions of the…

Abstract

Purpose

The purpose of this paper is to systematically develop a delay risk terminology and taxonomy. This research also explores two external and internal dimensions of the taxonomy to determine how much the taxonomy as a whole or combinations of its elements are generalisable.

Design/methodology/approach

Using mixed methods research, this systematic literature review incorporated data from 46 articles to establish delay risk terminology and taxonomy. Qualitative data of the top 10 delay risks identified in each article were coded based on the grounded theory and constant comparative analysis using a three-stage coding approach. Word frequency analysis and cross-tabulation were used to develop the terminology and taxonomy. Association rules within the taxonomy were also explored to define risk paths and to unmask associations among the risks.

Findings

In total, 26 delay risks were identified and grouped into ten categories to form the risk breakdown structure. The universal delay risks and other delay risks that are more or less depending on the project location were determined. Also, it is realized that delays connected to equipment, sub-contractors and design drawings are highly connected to project planning, finance and owner slow decision making, respectively.

Originality/value

The established terminology and taxonomy may be used in manual or automated risk management systems as a baseline for delay risk identification, management and communication. In addition, the association rules assist the risk management process by enabling mitigation of a combination of risks together.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 10
Type: Research Article
ISSN: 0969-9988