Article
Publication date: 11 October 2022

Matti Haverila and Jenny Carita Twyford

Against the backdrop of management, planning, temporary organizations, Shannon–Weaver theory of communication and evaluation theories, the purpose of this research paper is to…

Abstract

Purpose

Against the backdrop of management, planning, temporary organizations, Shannon–Weaver theory of communication and evaluation theories, the purpose of this research paper is to examine the relative importance of specific project management tasks in the various phases of system delivery projects in distinguishing successful and unsuccessful projects.

Design/methodology/approach

A survey method was used (N = 3,129) to collect data from the customers of a major systems delivery project management company operating in the facilities management industry. Logistic regression was used to analyze the capability and relative importance of the tasks in discriminating successful and unsuccessful projects.

Findings

The results of the paper indicate that three out four installation tasks were among the top three in their ability to differentiate the successful and unsuccessful systems delivery project. Especially critical tasks were “Meeting milestones” and “Allocation of appropriate resources” so that the project could be completed on-time. Relatively less important tasks were “Advice and suggestions regarding the development of specifications for the project” and “Proposal to meet the intent of the company’s specifications” in the proposal phase of the project, and “Resolving warranty issues as defined by the warranty process” in the commissioning phase.

Originality/value

Previous research has assessed the importance of the various project management phases. This research examines the capability of the more minutiae tasks to distinguish the successful and unsuccessful projects in the various phases of systems delivery projects, i.e. proposal, installation and commissioning.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 26 March 2024

Jing An, Suicheng Li and Xiao Ping Wu

Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study…

Abstract

Purpose

Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study focuses on resource-constrained project scheduling in multi-project environments. The research simplifies the problem by adopting a single-project perspective using gain coefficients.

Design/methodology/approach

It employs uncertainty theory and multi-objective programming to construct a model. The optimal solution is identified using Matlab, while LINGO determines satisfactory alternatives. By combining these methods and considering actual construction project situations, a compromise solution closely approximating the optimal one is derived.

Findings

The study provides fresh insights into modeling and resolving resource-constrained project scheduling issues, supported by real-world examples that effectively illustrate its practical significance.

Originality/value

The research highlights three main contributions: effective resource utilization, project prioritization and conflict management, and addressing uncertainty. It offers decision support for project managers to balance resource allocation, resolve conflicts, and adapt to changing project demands.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 June 2023

Hana Begić, Mario Galić and Uroš Klanšek

Ready-mix concrete delivery problem (RMCDP), a specific version of the vehicle routing problem (VRP), is a relevant supply-chain engineering task for construction management with…

Abstract

Purpose

Ready-mix concrete delivery problem (RMCDP), a specific version of the vehicle routing problem (VRP), is a relevant supply-chain engineering task for construction management with various formulations and solving methods. This problem can range from a simple scenario involving one source, one material and one destination to a more challenging and complex case involving multiple sources, multiple materials and multiple destinations. This paper presents an Internet of Things (IoT)-supported active building information modeling (BIM) system for optimized multi-project ready-mix concrete (RMC) delivery.

Design/methodology/approach

The presented system is BIM-based, IoT supported, dynamic and automatic input/output exchange to provide an optimal delivery program for multi-project ready-mix-concrete problem. The input parameters are extracted as real-time map-supported IoT data and transferred to the system via an application programming interface (API) into a mixed-integer linear programming (MILP) optimization model developed to perform the optimization. The obtained optimization results are further integrated into BIM by conventional project management tools. To demonstrate the features of the suggested system, an RMCDP example was applied to solve that included four building sites, seven eligible concrete plants and three necessary RMC mixtures.

Findings

The system provides the optimum delivery schedule for multiple RMCs to multiple construction sites, as well as the optimum RMC quantities to be delivered, the quantities from each concrete plant that must be supplied, the best delivery routes, the optimum execution times for each construction site, and the total minimal costs, while also assuring the dynamic transfer of the optimized results back into the portfolio of multiple BIM projects. The system can generate as many solutions as needed by updating the real-time input parameters in terms of change of the routes, unit prices and availability of concrete plants.

Originality/value

The suggested system allows dynamic adjustments during the optimization process, andis adaptable to changes in input data also considering the real-time input data. The system is based on spreadsheets, which are widely used and common tool that most stakeholders already utilize daily, while also providing the possibility to apply a more specialized tool. Based on this, the RMCDP can be solved using both conventional and advanced optimization software, enabling the system to handle even large-scale tasks as necessary.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 February 2024

Qianwen Zhou and Xiaopeng Deng

Despite the knowledge transfer between projects has received increasing attention from scholars, few scholars still conduct comprehensive research on inter-project knowledge…

Abstract

Purpose

Despite the knowledge transfer between projects has received increasing attention from scholars, few scholars still conduct comprehensive research on inter-project knowledge transfer from both horizontal and vertical perspectives. Besides, knowledge transfer is affected by multiple antecedent conditions, and these factors should be combined for analysis. Therefore, this paper aims to explore the key factors influencing knowledge transfer between projects using the fuzzy-set qualitative comparative analysis (fsQCA) method from both horizontal and vertical perspectives and how these factors combine to improve the effectiveness of knowledge transfer (EKT) between projects.

Design/methodology/approach

First, nine factors affecting knowledge transfer between projects were identified, which were from the four dimensions of subject, relationship, channel, and context, namely temporary nature (TN), time urgency (TU), transmit willingness (TW), receive willingness (RW), trust (TR), project-project transfer channels (PPC), project-enterprise transfer channels (PEC), organizational atmosphere (OA), and motivation system (MS). Then, the source of the samples was determined and the data from the respondents was collected for analysis. Following the operation steps of the fsQCA method, variable calibration, single condition necessity analysis, and configuration analysis were carried out. After that, the configurations of influencing factors were obtained and the robustness test was conducted.

Findings

The results of the fsQCA method show that there are five configurations that can obtain better EKT between projects. Configuration 3 (∼TN * ∼TU * TW * RW * TR * ∼PPC * PEC * MS) has the highest consistency, indicating that it has the highest degree of the explanatory variable subset. Configuration 1 (∼TN * ∼TU * TW * RW * PEC * OA * MS) has the highest coverage, meaning that this configuration can explain most cases. Also, the five configurations were divided into three types: vertical transfer, horizontal-vertical transfer, and channel-free transfer category.

Originality/value

Firstly, this study explores the key factors influencing knowledge transfer between projects from four dimensions, which presents the logical chain of influencing factors more clearly. Then, this study divided the five configurations obtained into three categories according to the transfer direction: vertical, horizontal-vertical, and channel-free transfer, which gives implications to focus on both horizontal knowledge transfer (HKT) and (VKT) when studying knowledge transfer between projects. Lastly, this study helps to realize the exploration of combined improvement strategies for EKT, thereby providing meaningful recommendations for enterprises and project teams to facilitate knowledge transfer between projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 March 2024

Ewa Sońta-Drączkowska and Agnieszka Krogulec

This study seeks to illuminate the managerial tensions inherent in implementing scaled agile (on the organizational, top management, middle management and team levels) and to…

Abstract

Purpose

This study seeks to illuminate the managerial tensions inherent in implementing scaled agile (on the organizational, top management, middle management and team levels) and to frame these challenges within the broader context of project management.

Design/methodology/approach

The study adopts a grounded theory approach and delves into a qualitative dataset sourced from 34 interviews with subject matter experts actively engaged in scaling agile initiatives within large organizations spanning various industries. Additionally, the data have been enriched through a comprehensive literature review of the existing body of knowledge on scaling agile.

Findings

As a result of our investigation, we propose a framework of managerial tensions in scaling agile in large corporate settings and a series of research propositions and questions that may contribute significantly to the body of knowledge surrounding the phenomenon of “deprojectification” and propose agenda for the future studies in the field of project management.

Research limitations/implications

The study also carries significant managerial implications. Firstly, based on the insights from the practice of scaling agile in large corporate setting, management can build awareness of the challenges inherent of transitioning to agile practices. This may help to anticipate the possible problems and proactively develop strategies how to address them. Secondly, management can be instructed about contingencies inherent in scaling agile, along with the potential disfunctions and side effects (unintended outcomes) that may emerge during the transition process. Thirdly, project management practitioners can gain insights on how scaling agile may cause shifts in the approach to managing projects, project team management and competencies that need to be developed to cope with environments where various approaches to managing projects coexist.

Practical implications

These insights can aid in the agile transition process, beginning with directing managerial attention toward contextual factors and progressing through potential challenges at the organizational, top management, middle management and team levels. Furthermore, the study highlights possible dysfunctionalities and side effects of scaling agile, shedding light on the “dark side” of agile.

Originality/value

The study contributes to the expansion of the empirical database on the implementation of agile practices in large organizational settings. It plays a role in defining and delineating the phenomenon of scaling agile within the context of project management and outlines a research agenda for future project management studies. Additionally, our study adds to the ongoing discourse surrounding the “deprojectification” effect that can occur during the scaling of agile. Lastly, it establishes connections between project management and software development literature regarding the implementation of agile at scale.

Details

International Journal of Managing Projects in Business, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 5 December 2023

Lahiru Supun Deshan Rathnayaka, Buddha Koralage Malsha Nadeetharu and Udayangani Kulatunga

Documentation plays a key role in navigating the costs of construction projects. Traditional document management systems (TDMS) used in developing countries, however, hinder the…

Abstract

Purpose

Documentation plays a key role in navigating the costs of construction projects. Traditional document management systems (TDMS) used in developing countries, however, hinder the achievement of expected cost targets. Although the electronic document management system (EDMS) has been implemented to improve documentation, the Sri Lankan construction industry has failed to effectively adapt to it. Hence, this study aims to provide strategies for the effective application of EDMS to the cost management of Sri Lankan mega construction projects.

Design/methodology/approach

This study uses a qualitative approach followed by 12 semi-structured expert interviews. Quantity surveying experts were selected through judgemental sampling. Manual content analysis was used to analyse the data.

Findings

The EDMS is more suitable for megaprojects than traditional methods of documentation in terms of functionality, neutrality, interoperability, space, reversibility and delivery speed. However, there are contradictory views about cost and security. Furthermore, five transitional challenges of EDMS have been identified under the three key themes of cost, stakeholder perception and technical difficulties. Four reasons were also identified as causing these five challenges. Seven suggestions were made to deal with these transitional challenges and three key feasible solutions for the Sri Lankan construction industry regarding the EDMS were identified. Development of Sri Lankan software with low initial cost was highlighted as the most feasible solution.

Originality/value

This is a novel study to investigate the applicability of EDMS to cost management mechanisms of megaprojects in Sri Lanka. The findings reveal transitional challenges and appropriate feasible solutions for EDMS adaptation. This can be applied to the cost management of megaprojects in other developing countries as well.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 20 March 2023

Xu Zhang, Mark Goh, Sijun Bai and Zonghan Wang

Risk response decisions (RRDs) are vital for project risk mitigation. Although past research has focused on RRDs for independent single projects, it has scarcely explored how to…

Abstract

Purpose

Risk response decisions (RRDs) are vital for project risk mitigation. Although past research has focused on RRDs for independent single projects, it has scarcely explored how to make RRDs for single projects in project portfolios (SPPPs). Consequently, this study aims to bridge the gap in extant literature by developing an integrated approach to select risk response strategies (RRSs) for SPPPs considering objective adjustments and project interdependencies (PIs).

Design/methodology/approach

An integrated quality function deployment (QFD) method was used throughout this study. More so, a balanced score card (BSC) and stratified-Z-numbers-full consistency method (SZFUCOM) was applied to identify SPPP success criteria (SP3SC) to determine their weights. In addition, a spherical fuzzy set-design structure matrix (SFDSM) was used to quantify the correlation between the risks and the relationship between the risks and the predecessor projects. Consequently, the relationships between the risks and SP3SC and RRSs were described by the spherical fuzzy set (SFS) and Z-numbers, respectively. Besides, the results are weaved into QFD to transform SP3SC into risks and then into RRSs, while a linear optimization model is used to obtain the optimal RRSs. Lastly, a construction project portfolio (PP) was used to test the veracity of the results to prove their validity.

Findings

The approach to RRDs for single projects is observed to be different from that of SPPPs. In addition, this study finds that project portfolio objective adjustments (PPOAs) and PIs have significant impacts on RRDs given that they influence the risk priorities of independent single projects and SPPPs. Moreover, the application of an integrated QFD effectively synthesized the results from the findings of this study, as well as enabled companies to determine robust RRSs. Finally, the consistency results of the SZFUCOM were better than those of the triangular fuzzy number-full consistency method.

Originality/value

The study innovatively explores the method of RRDs for SPPP, which has been ignored by past research. SP3SC highly compatible with PP success is determined. Z-numbers are first used to evaluate the effect of RRSs to enhance the robustness of RRDs. The study proposes a method of RRDs comprehensively considering PPOAs and PIs, which provides robust methodological guidance for SPPP managers to control risks.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 2 January 2024

Kun You, Zubir Azhar and Qingyu Wang

This paper aims to explore how a shared service centre (SSC) is mobilised in a power-dominant context of a Chinese state-owned enterprise (SOE). Specifically, it examines the…

Abstract

Purpose

This paper aims to explore how a shared service centre (SSC) is mobilised in a power-dominant context of a Chinese state-owned enterprise (SOE). Specifically, it examines the mobilisation of SSC within this multi-divisional SOE, the role and dynamics of actors involved and the influence of changes in the integrated information system (IIS) during the mobilisation process.

Design/methodology/approach

The study follows a qualitative case study methodology. The authors draw on actor-network theory to examine the network and translation processes constructed in mobilising SSC in the chosen SOE. The data sources of this study were collected through semi-structured interviews, observations and documentary reviews.

Findings

The mobilisation of SSC is not a linear process but rather a “spiral” interplay through continuous interactions and compromises between human and non-human actors. Power gave the core actor as an orchestrator legitimacy and formality to reduce resistance and obstruction in translation for the mobilisation of SSC. The changes in IIS appear to facilitate the interaction between the heterogeneous actors.

Practical implications

This case study contributes towards understanding the mobilisation of SSC in a power-dominant context by highlighting the impact of changes in IIS and the details of the mobilisation of SSC in terms of the role played by both the individual actors and the technology.

Originality/value

This study provides a broader understanding of the interactions of the heterogeneous actors for mobilising SSC in a power-dominant context. More importantly, the study inspires future research into examining how SSC practices unfold and how the changes in IIS influence the mobilisation of SSC.

Details

Journal of Accounting & Organizational Change, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1832-5912

Keywords

Article
Publication date: 21 July 2023

Deepak Datta Nirmal, K. Nageswara Reddy and Sujeet Kumar Singh

The main purpose of this study is to provide a comprehensive review and critical insights of the application of fuzzy methods in modeling, assessing and understanding the various…

Abstract

Purpose

The main purpose of this study is to provide a comprehensive review and critical insights of the application of fuzzy methods in modeling, assessing and understanding the various aspects of green and sustainable supply chains (SSCs).

Design/methodology/approach

The present study conducts a systematic literature review (SLR) and bibliometric analysis of 252 research articles. This study employs various tools such as VOSviewer version 1.6.10, Publish or Perish, Mendeley and Excel that aid in descriptive analysis, bibliometric analysis and network visualization. These tools have been used for performing citation analysis, top authors' analysis, co-occurrence of keywords, cluster and content analysis.

Findings

The authors have divided the literature into seven application areas and discussed detailed insights. This study has observed that research in the social sustainability area, including various issues like health and safety, labor rights, discrimination, etc. is scarce. Integration of the Industry 4.0 technologies like blockchain, big data analytics, Internet of Things (IoT) with the sustainable and green supply chain (GSC) is a promising field for future research.

Originality/value

The authors' contribution primarily lies in providing the integrated framework which shows the changing trends in the use of fuzzy methods in the sustainability area classifying and consolidating green and sustainable supply chain management (SSCM) literature in seven major areas where fuzzy methods are predominantly applied. These areas have been obtained after the analysis of clusters and content analysis of the literature presenting key insights from the past and developing the conceptual framework for future research studies.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 18 January 2024

Shiba Hessami, Hamed Davari-Ardakani, Youness Javid and Mariam Ameli

This study aims to deal with the multi-mode resource-constrained project scheduling problem (MRCPSP) with the ability to transport resources among multiple sites, aiming to…

Abstract

Purpose

This study aims to deal with the multi-mode resource-constrained project scheduling problem (MRCPSP) with the ability to transport resources among multiple sites, aiming to minimize the total completion time and the total cost of the project simultaneously.

Design/methodology/approach

To deal with the problem under consideration, a bi-objective optimization model is developed. All activities are interconnected by finish-start precedence relations, and pre-emption is not allowed. Then, the ɛ-constraint optimization method is used to solve 24 different-sized instances, ranging from 5 to 120 activities, and report the makespan, total cost and CPU time. A set of Pareto-optimal solutions are determined for some instances, and sensitivity analyses are performed to find the impact of changing parameters on objective values.

Findings

Results highlight the importance of resource transportability assumption on project completion time and cost, providing useful insights for decision makers and practitioners.

Originality/value

A novel bi-objective optimization model is proposed to deal with the multi-site MRCPSP, considering both the cost and time of resource transportation between multiple sites. To the best of the authors’ knowledge, none of the studies in the project scheduling area has yet addressed this problem.

Details

Journal of Modelling in Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1746-5664

Keywords