Article
Publication date: 9 March 2015

Rita Henriikka Lavikka, Riitta Smeds and Miia Jaatinen

– The paper aims to compare the coordination of supply chain networks in contractually different complex construction projects.

2184

Abstract

Purpose

The paper aims to compare the coordination of supply chain networks in contractually different complex construction projects.

Design/methodology/approach

A comparative case study of the coordination of collaborative work in two successful hospital construction projects was conducted. One of the projects applied multiple dyadic contracts, whereas the other project applied one multi-party contract between the parties. The projects were located in the USA. Data were collected by observing the coordination on the construction sites for six weeks and by conducting 72 interviews.

Findings

The paper shows that depending on the contract type, the timing and extent of complementary procedural coordination differs during projects. Compared with one multi-party contract, the dyadic contracts needed to be complemented during the design phase with three additional procedural coordination mechanisms: organizational design, processes for collaborative work and integrated concurrent engineering sessions. Additionally, common rules of conduct were taken into use during the construction phase. However, regardless of the contract type, procedural coordination mechanisms, such as co-located working, collaborative decision-making in inter-organizational meetings, a liaison role and shared project goals were needed throughout the projects.

Practical implications

If multiple dyadic contracts are applied, procedural coordination mechanisms have to be co-created by all supply chain parties at the beginning of the project.

Originality/value

The paper provides an understanding on successful contractual and complementary procedural coordination mechanisms of supply chain networks in complex construction projects.

Details

Supply Chain Management: An International Journal, vol. 20 no. 2
Type: Research Article
ISSN: 1359-8546

Keywords

Article
Publication date: 27 July 2021

Shuwen Guo, Junwu Wang and Han Wu

This paper examines the profit distribution of engineering projects in the integrated project delivery (IPD) mode. IPD is a new delivery method that can ameliorate many of the…

Abstract

Purpose

This paper examines the profit distribution of engineering projects in the integrated project delivery (IPD) mode. IPD is a new delivery method that can ameliorate many of the disadvantages of traditional delivery methods and improve project results. In the implementation of IPD, the profit distribution is key for ensuring the success of IPD projects.

Design/methodology/approach

This paper described a new method for characterizing profit distribution in the IPD mode. The payment function and Shapley value of the cooperative fuzzy game of fuzzy alliance were defined by considering the Choquet integral of the fuzzy measure. The participation of each player was considered, and the influence of participation on the profit distribution was discussed. Lastly, changes in the profit distribution of core participants under different alliance combinations were studied.

Findings

A case from a report of The American Institute of Architects (AIA) was used to verify the fuzzy alliance model. There was a significant correlation between the degree of participation of the owner, architect and builder and the profit distribution among these three participants.

Research limitations/implications

The theoretical research in this paper has some limitations. Initially, this paper selects a case with only three key participants in order to simplify the research. When there are many core participants, how to establish the alliance in the IPD mode and how to establish the corresponding profit distribution model, further work is certainly required to disentangle these complexities in models. Second, in this case, BIM technology has little impact on the income of the whole project. Therefore, this paper does not consider the impact of BIM technology on the marginal effect of the IPD project. Third, the contract type in the case is a custom tri-party based on IFOA. There is no classified discussion of the impact of different contracts on the profit distribute in the paper.

Practical implications

Based on the in-depth study of cooperative game with alliance structure, this paper promotes the classic cooperative game with alliance structure. The authors define the payoff function of fuzzy cooperative games by Choquet integral of fuzzy measure, and introduce the idea into the field of IPD. It aims at extending the solution to a cooperative game without a core. It can be obtained through a simple calculation. In the IPD alliance, the fuzziness and uncertainty of the participation degree of each participant will affect the profit of the whole project. The authors find that the higher the participation rate of players, the more profit each participant has. The greater the influence weight of the designer on the alliance, the lower the influence weight of the contractor on the alliance, the lower the participation of the contractor and the designer, and the lower the income distribution value of the three core participants. It shows a monotonous decline status.

Social implications

For any construction enterprise, it can make more profits if it joins the grand alliance. In the IPD alliance, each participant can maximize their own interests, which can also promote the enthusiasm of construction enterprises to participate in the alliance and increase the application of IPD mode in AEC industry. This research method provides a new fast, effective, and more realistic solution method for cooperative countermeasures. It can be further extended to other cooperative game fields and advance a new research perspective and solution for the distribution of cooperative interests.

Originality/value

The contribution of this paper is the development of a fuzzy alliance model that provides a tool for measuring the profit distribution in IPD. This is the first quantitative model to connect the degree of participation with the profit distribution in IPD using fuzzy alliance.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 February 2023

Sara Rashidian, Robin Drogemuller, Sara Omrani and Fereshteh Banakar

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving…

Abstract

Purpose

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving collaboration and delivering construction projects has been acknowledged by construction academics and professionals. Once organizations have fully embraced BIM, IPD and LC integration, a measurement tool such as a maturity model (MM) for benchmarking their progress and setting realistic goals for continuous improvement will be required. In the context of MMs literature, however, no comprehensive analysis of these three construction management methods has been published to reveal the current trends and common themes in which the models have approached each other.

Design/methodology/approach

Therefore, this study integrates systematic literature review (SLR) and thematic analysis techniques to review and categorize the related MMs; the key themes in which the interrelationship between BIM, IPD and LC MMs has been discussed and conceptualized in the attributes; the shared characteristics of the existing BIM, IPD and LC MMs, as well as their strengths and limitations. The Preferred Reporting Items for Systematic Reviews (PRISMA) method has been used as the primary procedure for article screening and reviewing published papers between 2007 and 2022.

Findings

Despite the growth of BIM, IPD and LC integration publications and acknowledgment in the literature, no MM has been established that holistically measures BIM, IPD and LC integration in an organization. This study identifies five interrelated and overlapping themes indicative of the collaboration of BIM, IPD and LC in existing MMs' structure, including customer satisfaction, waste minimization, Lean practices and cultural and legal aspects. Furthermore, the MMs' common characteristics, strengths and limitations are evaluated to provide a foundation for developing future BIM, IPD and LC-related MMs.

Practical implications

This paper examines the current status of research and the knowledge gaps around BIM, IPD and LC MMs. In addition, the highlighted major themes serve as a foundation for academics who intend to develop integrated BIM, IPD, and LC MMs. This will enable researchers to build upon these themes and establish a comprehensive list of maturity attributes fulfilling the BIM, IPD and LC requirements and principles. In addition, the MMs' BIM, IPD and LC compatibility themes, which go beyond themes' intended characteristics in silos, increase industry practitioners' awareness of the underlying factors of BIM, IPD and LC integration.

Originality/value

This review article is the first of a kind to analyze the interaction of IPD, BIM and LC in the context of MMs in current AEC literature. This study concludes that BIM, IPD and LC share several joint cornerstones according to the existing MMs.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 8 March 2021

Raymond Obayi and Seyed Nasrollah Ebrahimi

In a departure from the efficiency theory assumptions implicit in most supply chain risk management (SCRM) literature, this study aims to explore the role that external…

Abstract

Purpose

In a departure from the efficiency theory assumptions implicit in most supply chain risk management (SCRM) literature, this study aims to explore the role that external neo-institutional pressures play in shaping the risk management strategies deployed to mitigate transaction cost risks in construction supply chains (CSC).

Design/methodology/approach

A theory-elaborating case study is used to investigate how regulatory, normative and mimetic neo-institutional pressures underpin SCRM strategies in state-led and private-led CSC in China.

Findings

The study finds that institutionalized Confucianist networks serve as proxies for regulatory accountability and thereby create a form of dysmorphia in the regulatory, normative and mimetic drivers of SCRM strategies in state-led and private-led CSC in China.

Originality/value

The findings reveal that relational costs such as bargaining, transfer and monitoring costs underpin SCRM in state-led CSC. Behavioral costs associated with search, screening and enforcement are the core drivers of SCRM in private-led CSC. These differences in transaction cost drivers of SCRM arise from the risk-buffering effect of personalized Guanxi networks, creating variants of institutional pressures on actors' risk analysis, identification and treatment strategies in China. Considering China's global hegemony in construction and related industries, this study provides valuable insights for practitioners and researchers on the need for a constrained efficiency view of SCRM in global CSC.

Details

Supply Chain Management: An International Journal, vol. 26 no. 5
Type: Research Article
ISSN: 1359-8546

Keywords

Article
Publication date: 1 February 2016

Mikko Kantola and Arto Saari

The paper aims to reveal the most functioning project delivery systems for nearly zero-energy building (nZEB) projects. The focus is set to reveal the qualities of the systems…

1015

Abstract

Purpose

The paper aims to reveal the most functioning project delivery systems for nearly zero-energy building (nZEB) projects. The focus is set to reveal the qualities of the systems that support the nZEB goals and sustainability.

Design/methodology/approach

Research method used in this paper is inductive reasoning. The reasoning is based on existing literature, and conclusions are drawn by combining pieces of that literature.

Findings

The state-of-the-art heating, ventilation and air conditioning (HVAC) and insulation requirements of nZEB technology and the lack of experience in the industry regarding nZEB projects suggest that modern collaboration-based project delivery systems should be favoured. The authors found that the most suitable project delivery system for a standard nZEB project is the integrated project delivery (IPD), which binds the financial goals of the main parties together via a reimbursement solution: target pricing. The authors also found the construction management (CM) at-risk system a suitable solution, especially if it is modified by adding the tools utilised in the IPD approach, thereby making it an IPD lite system.

Originality/value

The paper has value for the entire construction industry in Finland and European Union (EU). The owners and construction companies can use the findings in their development efforts towards nZEB construction. The EU 2020 nZEB degree makes all the findings concerning practicalities of nZEB projects valuable due to the lack of time and the lack of experience in the industry.

Article
Publication date: 31 July 2019

Seoung-Wook Whang, Kenneth Sungho Park and Sangyong Kim

The purpose of this paper is to identify the critical success factors (CSFs) to implement integrated project delivery (IPD) systems in the Korean construction industry.

1026

Abstract

Purpose

The purpose of this paper is to identify the critical success factors (CSFs) to implement integrated project delivery (IPD) systems in the Korean construction industry.

Design/methodology/approach

This study categorized potential CSFs and analyzed them using factor analysis and multiple regression analysis to choose the best ones based on responses from Korean construction experts.

Findings

In total, 29 potential factors were selected and categorized into 7 CSFs using factor analysis.

Originality/value

The outcomes of the study are useful as a reference for applying the IPD system in different developing countries and mid-sized construction industries.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 June 2009

Adekunle S. Oyegoke, Michael Dickinson, Malik M.A. Khalfan, Peter McDermott and Steve Rowlinson

The purpose of this paper is to examine different categories of building project procurement routes based on organisational, contractual, financial and technical issues.

13254

Abstract

Purpose

The purpose of this paper is to examine different categories of building project procurement routes based on organisational, contractual, financial and technical issues.

Design/methodology/approach

The paper is based on review of literature and conditions of contracts. The UK construction industry serves as a general frame of reference. The Royal Institution of Chartered Surveyors survey of Contracts in Use from 1985 to 2004 is used to probe the share and value of contracts along different procurement routes and across different conditions of contracts in the UK. The logic is that the value and the share of contracts will indicate the behaviour of different procurement routes in the UK construction market while the in‐depth analysis of conditions of contracts will show the gaps and relationships between the general definition/categorisation and contractual context (conditions of contracts) of each of the procurement routes.

Findings

The preliminary result of the analysis shows that traditional routes remain the main type of procurement route for the construction project industry sector, within which different management and incentivisation systems are applied for greater efficiency. The conditions of contracts in the UK support this assertion by aligning different procurement routes to different conditions of contracts and additionally specifying different forms of agreements, special provisions and incentivisation in order to increase performance, reduce risks and improve compensation methods.

Research limitations/implications

The study can serve as a learning opportunity for construction project stakeholders internationally, and clients in particular, to differentiate between procurement routes, management‐oriented systems, relational contracting and incentivisation.

Originality/value

The research provides an original assessment of construction procurement which can be used as intervening tool in different levels of private and public procurement strategies.

Details

International Journal of Managing Projects in Business, vol. 2 no. 3
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 9 July 2021

Sapir Handelman

Intractable conflict is a long-time violent and self-perpetuating crisis. The peacemaking revolution has the potential to stop the destructive dynamic of the conflict. The purpose…

Abstract

Purpose

Intractable conflict is a long-time violent and self-perpetuating crisis. The peacemaking revolution has the potential to stop the destructive dynamic of the conflict. The purpose of this paper is to present a contractualist model of a peacemaking revolution and its theoretical foundations. It analyzes the revolutionary peacemaking process in Northern Ireland during the 1990s in light of the contractualist model.

Design/methodology/approach

The paper presents a contractualist model to describe the interplay between leaders (policymakers) and people (public opinion) and its impact on the strategy to cope with situations of intractable conflict. The paper includes theoretical background and a case study analysis.

Findings

The peacemaking revolution is a process of dynamic equilibrium between peacemaking policy and public expectations for change. It progresses from one point of equilibrium to the next.

Originality/value

The paper intends to add a fresh perspective to the study of the peacemaking revolution, in general, and the interplay between peacemaking policy and public support in particular. It points out that a consensus-building process, which combines political-elite diplomacy and public diplomacy, has the potential to create the conditions for a peacemaking revolution. Political-elite diplomacy offers diplomatic channels for leaders to begin a peace process, support it and conclude agreements. Public diplomacy offers instruments to involve the people in the peacemaking efforts, prepare them for a change and motivate the leaderships to conclude agreements.

Details

International Journal of Conflict Management, vol. 32 no. 4
Type: Research Article
ISSN: 1044-4068

Keywords

Open Access
Article
Publication date: 11 May 2020

Zhizhao Zhang, Tianzhi Yang and Yuan Liu

The purpose of this work is to bridge FL and blockchain technology through designing a blockchain-based smart agent system architecture and applying in FL. and blockchain…

2256

Abstract

Purpose

The purpose of this work is to bridge FL and blockchain technology through designing a blockchain-based smart agent system architecture and applying in FL. and blockchain technology through designing a blockchain-based smart agent system architecture and applying in FL. FL is an emerging collaborative machine learning technique that trains a model across multiple devices or servers holding private data samples without exchanging their data. The locally trained results are aggregated by a centralized server in a privacy-preserving way. However, there is an assumption where the centralized server is trustworthy, which is impractical. Fortunately, blockchain technology has opened a new era of data exchange among trustless strangers because of its decentralized architecture and cryptography-supported techniques.

Design/methodology/approach

In this study, the author proposes a novel design of a smart agent inspired by the smart contract concept. Specifically, based on the proposed smart agent, a fully decentralized, privacy-preserving and fair deep learning blockchain-FL framework is designed, where the agent network is consistent with the blockchain network and each smart agent is a participant in the FL task. During the whole training process, both the data and the model are not at the risk of leakage.

Findings

A demonstration of the proposed architecture is designed to train a neural network. Finally, the implementation of the proposed architecture is conducted in the Ethereum development, showing the effectiveness and applicability of the design.

Originality/value

The author aims to investigate the feasibility and practicality of linking the three areas together, namely, multi-agent system, FL and blockchain. A blockchain-FL framework, which is based on a smart agent system, has been proposed. The author has made several contributions to the state-of-the-art. First of all, a concrete design of a smart agent model is proposed, inspired by the smart contract concept in blockchain. The smart agent is autonomous and is able to disseminate, verify the information and execute the supported protocols. Based on the proposed smart agent model, a new architecture composed by these agents is formed, which is a blockchain network. Then, a fully decentralized, privacy-preserving and smart agent blockchain-FL framework has been proposed, where a smart agent acts as both a peer in a blockchain network and a participant in a FL task at the same time. Finally, a demonstration to train an artificial neural network is implemented to prove the effectiveness of the proposed framework.

Details

International Journal of Crowd Science, vol. 4 no. 2
Type: Research Article
ISSN: 2398-7294

Keywords

Article
Publication date: 30 May 2023

Sharifah Nur Aina Syed Alwee, Umi Kalsum Zolkafli and Hafez Salleh

The era of digital construction, including building information modelling (BIM), has placed a high demand for a seamless collaboration of people, technology and processes in…

Abstract

Purpose

The era of digital construction, including building information modelling (BIM), has placed a high demand for a seamless collaboration of people, technology and processes in meeting a project delivery. The project actors involved in a BIM process must ensure compliance with all regulations and contractual requirements from inception. While many studies have disclosed the various contractual implications arising from BIM implementation, little has been examined on the current state of BIM in contract administration practice, particularly in the Malaysian construction industry. This study aims to explore the current state of BIM implementation with specific reference to a design-and-build construction project.

Design/methodology/approach

The exploratory case study involved the construction of a public complex. Semi-structured interviews were carried out with the project actors, and document analysis was performed on the project’s contractual guidelines to derive the findings.

Findings

Findings from the thematic analysis revealed the following five sequences of activities that guided the contract administration practices, particularly during the pre-contract and post-contract stages of a BIM-based construction project: project inception, tendering phase, detailed design, construction and preparation for the handing over phase. Most of the activities were conducted to deliver the final BIM outputs successfully. Nevertheless, some shortcomings were noted in the project monitoring, the validation process of the BIM deliverables and the BIM players’ competency level in fulfilling the specified BIM contractual requirements.

Practical implications

The study contributes to a practical understanding of how BIM can affect project administration and how a public client can improve contractual risk allocation in future BIM implementation.

Originality/value

This paper discloses the current practices of contract administration to better understand the impacts of BIM management during the pre-contract and post-contract stages of a BIM-based construction project.

Details

Facilities , vol. 41 no. 11/12
Type: Research Article
ISSN: 0263-2772

Keywords