Search results

1 – 10 of 23
Article
Publication date: 27 April 2020

Ashish Yadav, Shashank Kumar and Sunil Agrawal

Multi-manned assembly lines are designed to produce large-sized products, such as automobiles. In this paper, a multi-manned assembly line balancing problem (MALBP) is addressed…

Abstract

Purpose

Multi-manned assembly lines are designed to produce large-sized products, such as automobiles. In this paper, a multi-manned assembly line balancing problem (MALBP) is addressed in which a group of workers simultaneously performs different tasks on a workstation. The key idea in this work is to improve the workstation efficiency and worker efficiency of an automobile plant by minimizing the number of workstations, the number of workers, and the cycle time of the MALBP.

Design/methodology/approach

A mixed-integer programming formulation for the problem is proposed. The proposed model is solved with benchmark test problems mentioned in research papers. The automobile case study problem is solved in three steps. In the first step, the authors find the task time of all major tasks. The problem is solved in the second step with the objective of minimizing the cycle time for the sub-tasks and major tasks, respectively. In the third step, the output results obtained from the second step are used to minimize the number of workstations using Lingo 16 solver.

Findings

The experimental results of the automobile case study show that there is a large improvement in workstation efficiency and worker efficiency of the plant in terms of reduction in the number of workstations and workers; the number of workstations reduced by 24% with a cycle time of 240 s. The reduced number of workstations led to a reduction in the number of workers (32% reduction) working on that assembly line.

Practical implications

For assembly line practitioners, the results of the study can be beneficial where the manufacturer is required to increased workstation efficiency and worker efficiency and reduce resource requirement and save space for assembling the products.

Originality/value

This paper is the first to apply a multi-manned assembly line balancing approach in real life problem by considering the case study of an automobile plant.

Details

Benchmarking: An International Journal, vol. 28 no. 5
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 6 February 2017

Abdolreza Roshani and Farnaz Ghazi Nezami

This paper aims to study a generalized type of mixed-model assembly line with multi-manned workstations where multiple workers simultaneously perform different tasks on the same…

Abstract

Purpose

This paper aims to study a generalized type of mixed-model assembly line with multi-manned workstations where multiple workers simultaneously perform different tasks on the same product. This special kind of assembly line is usually utilized to assemble different models of large products, such as buses and trucks, on the same production line.

Design/methodology/approach

To solve the mixed-model multi-manned assembly line balancing problem optimally, a new mixed-integer-programming (MIP) model is presented. The proposed MIP model is nondeterministic polynomial-time (NP)-hard, and as a result, a simulated annealing (SA) algorithm is developed to find the optimal or near-optimal solution in a small amount of computation time.

Findings

The performance of the proposed algorithm is examined for several test problems in terms of solution quality and running time. The experimental results show that the proposed algorithm has a satisfactory performance from computational time efficiency and solution accuracy.

Originality/value

This research is the very first study that minimizes the number of workers and workstations simultaneously, with a higher priority set for the number of workers, in a mixed-model multi-manned assembly line setting using a novel MIP model and an SA algorithm.

Details

Assembly Automation, vol. 37 no. 1
Type: Research Article
ISSN: 0144-5154

Keywords

Article
Publication date: 2 February 2015

Hamid Yilmaz and Mustafa Yilmaz

The purpose of this paper is balancing multi-manned assembly lines with load-balancing constraints in addition to conventional ones Most research works about the multi-manned

Abstract

Purpose

The purpose of this paper is balancing multi-manned assembly lines with load-balancing constraints in addition to conventional ones Most research works about the multi-manned assembly line balancing problems are focused on the conventional industrial measures that minimize total number of workers, number of multi-manned workstations or both.

Design/methodology/approach

This paper provides a remedial constraint for the model to balance task load density for each worker in workstations.

Findings

Comparisons between the proposed mathematical model and the existing multi-manned mathematical model show a quite promising better task load density performance for the proposed approach.

Originality/value

In this paper, a mathematical model that combines the minimization of multi-manned stations, worker numbers and difference of task load density of workers is proposed for the first time.

Details

Assembly Automation, vol. 35 no. 1
Type: Research Article
ISSN: 0144-5154

Keywords

Article
Publication date: 1 February 2016

Hamid Yilmaz and Mustafa Yilmaz

Within team-oriented approaches, tasks are assigned to teams before being assigned to workstations as a reality of industry. So it becomes clear, which workers assemble which…

Abstract

Purpose

Within team-oriented approaches, tasks are assigned to teams before being assigned to workstations as a reality of industry. So it becomes clear, which workers assemble which tasks.

Design/methodology/approach

Team numbers of the assembly line can increase with the number of tasks, but at the same time, due to physical situations of the stations, there will be limitations of maximum working team numbers in a station. For this purpose, heuristic assembly line balancing (ALB) procedure is used and mathematical model is developed for the problem.

Findings

Well-known assembly line test problems widely used in the literature are solved to indicate the effectiveness and applicability of the proposed approach in practice.

Originality/value

This paper draws attention to ALB problem in which workers have been assigned to teams in advance due to the need for specialized skills or equipment on the line for the first time.

Details

Assembly Automation, vol. 36 no. 1
Type: Research Article
ISSN: 0144-5154

Keywords

Article
Publication date: 20 July 2021

Wenrui Jin, Zhaoxu He and Qiong Wu

Due to the market trend of low-volume and high-variety, the manufacturing industry is paying close attention to improve the ability to hedge against variability. Therefore, in…

Abstract

Purpose

Due to the market trend of low-volume and high-variety, the manufacturing industry is paying close attention to improve the ability to hedge against variability. Therefore, in this paper the assembly line with limited resources is balanced in a robust way that has good performance under all possible scenarios. The proposed model allows decision makers to minimize a posteriori regret of the selected choice and hedge against the high cost caused by variability.

Design/methodology/approach

A generalized resource-constrained assembly line balancing problem (GRCALBP) with an interval data of task times is modeled and the objective is to find an assignment of tasks and resources to the workstations such that the maximum regret among all the possible scenarios is minimized. To properly solve the problem, the regret evaluation, an exact solution method and an enhanced meta-heuristic algorithm, Whale Optimization Algorithm, are proposed and analyzed. A problem-specific coding scheme and search mechanisms are incorporated.

Findings

Theory analysis and computational experiments are conducted to evaluated the proposed methods and their superiority. Satisfactory results show that the constraint generation technique-based exact method can efficiently solve instances of moderate size to optimality, and the performance of WOA is enhanced due to the modified searching strategy.

Originality/value

For the first time a minmax regret model is considered in a resource-constrained assembly line balancing problem. The traditional Whale Optimization Algorithm is modified to overcome the inferior capability and applied in discrete and constrained assembly line balancing problems.

Details

Engineering Computations, vol. 39 no. 3
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 17 September 2020

Beikun Zhang and Liyun Xu

The increasing energy shortage leads to worldwide attentions. This paper aims to develop a mathematical model and optimization algorithm to solve the energy-oriented U-shaped…

Abstract

Purpose

The increasing energy shortage leads to worldwide attentions. This paper aims to develop a mathematical model and optimization algorithm to solve the energy-oriented U-shaped assembly line balancing problem. Different from most existing works, the energy consumption is set as a major objective.

Design/methodology/approach

An improved flower pollination algorithm (IFPA) is designed to solve the problem. The random key encoding mechanism is used to map the continuous algorithm into discrete problem. The pollination rules are modified to enhance the information exchange between individuals. Variable neighborhood search (VNS) is used to improve the algorithm performance.

Findings

The experimental results show that the two objectives are in conflict with each other. The proposed methodology can help manager obtain the counterbalance between them, for the larger size balancing problems, and the reduction in objectives is even more significant. Besides, the experiment results also show the high efficiency of the proposed IFPA and VNS.

Originality/value

The main contributions of this work are twofold. First, a mathematical model for the U-shaped assembly line balancing problem is developed and the model is dual foci including minimized SI and energy consumption. Second, an IFPA is proposed to solve the problem.

Details

Assembly Automation, vol. 40 no. 6
Type: Research Article
ISSN: 0144-5154

Keywords

Article
Publication date: 1 May 2020

Emre Cevikcan and Mehmet Bulent Durmusoglu

Rabbit chase (RC) is used as one of the most effective techniques in manufacturing systems, as such systems have high level of adaptability and increased productivity in addition…

Abstract

Purpose

Rabbit chase (RC) is used as one of the most effective techniques in manufacturing systems, as such systems have high level of adaptability and increased productivity in addition to providing uniform workload balancing and skill improving environment. In assembly systems, RC inspires the development of walking worker assembly line (WWAL). On the other hand, U-type assembly lines (UALs) may provide higher worker utilization, lower space requirement and more convenient internal logistics when compared to straight assembly lines. In this context, this study aims to improve assembly line performance by generating RC cycles on WWAL with respect to task assignment characteristics of UAL within reasonable walking distance and space requirement. Therefore, a novel line configuration, namely, segmented rabbit chase-oriented U-type assembly line (SRCUAL), emerges.

Design/methodology/approach

The mathematical programming approach treats SRCUAL balancing problem in a hierarchical manner to decrease computational burden. Firstly, segments are generated via the first linear programming model in the solution approach for balancing SRCUALs to minimize total number of workers. Then, stations are determined within each segment for forward and backward sections separately using two different pre-emptive goal programming models. Moreover, three heuristics are developed to provide solution quality with computational efficiency.

Findings

The proposed mathematical programming approach is applied to the light-emitting diode (LED) luminaire assembly section of a manufacturing company. The adaptation of SRCUAL decreased the number of workers by 15.4% and the space requirement by 17.7% for LED luminaire assembly system when compared to UAL. Moreover, satisfactory results for the proposed heuristics were obtained in terms of deviation from lower bound, especially for SRCUAL heuristics I and II. Moreover, the results indicate that the integration of RC not only decreased the number of workers in 40.28% (29 instances) of test problems in U-lines, but also yielded less number of buffer points (48.48%) with lower workload deviation (75%) among workers in terms of coefficient of variation.

Practical implications

This study provides convenience for capacity management (assessing capacity and adjusting capacity by changing the number of workers) for industrial SRCUAL applications. Meanwhile, SRCUAL applications give the opportunity to increase the capacity for a product or transfer the saved capacity to the assembly of other products. As it is possible to provide one-piece flow with equal workloads via walking workers, SRCUAL has the potential for quick realization of defects and better lead time performance.

Originality/value

To the best of the authors’ knowledge, forward–backward task assignments in U-type lines have not been adapted to WWALs. Moreover, as workers travel overall the line in WWALs, walking time increases drastically. Addressing this research gap and limitation, the main innovative aspect of this study can be considered as the proposal of a new line design (i.e. SRCUAL) which is sourced from the hybridization of UALs and WWAL as well as the segmentation of the line with RC cycles. The superiority of SRCUAL over WWAL and UAL was also discussed. Moreover, operating systematic for SRCUAL was devised. As for methodical aspect, this study is the first attempt to solve the balancing problem for SRCUAL design.

Details

Assembly Automation, vol. 40 no. 3
Type: Research Article
ISSN: 0144-5154

Keywords

Article
Publication date: 18 August 2022

Adalberto Sato Michels and Alysson M. Costa

Resource-constrained assembly lines are widely found in industries that manufacture complex products. In such lines, tasks may require specific resources to be processed…

Abstract

Purpose

Resource-constrained assembly lines are widely found in industries that manufacture complex products. In such lines, tasks may require specific resources to be processed. Therefore, decisions on which tasks and resources will be assigned to each station must be made. When the number of available stations is fixed, the problem’s main goal becomes the minimisation of cycle time (type-II version). This paper aims to explore this variant of the problem that lacks investigation in the literature.

Design/methodology/approach

In this paper, the authors propose mixed-integer linear programming (MILP) models to minimise cycle time in resource-constrained assembly lines, given a limited number of stations and resources. Dedicated and alternative resource types for tasks are considered in different scenarios.

Findings

Besides, past modelling decisions and assumptions are questioned. The authors discuss how they were leading to suboptimal solutions and offer a rectification.

Practical implications

The proposed models and data set fulfil more practical concerns by taking into account characteristics found in real-world assembly lines.

Originality/value

The proposed MILP models are applied to an existing data set, results are compared against a constraint programming model, and new optimal solutions are obtained. Moreover, a data set extension is proposed due to the simplicity of the current one and instances up to 70 tasks are optimally solved.

Details

Assembly Automation, vol. 42 no. 5
Type: Research Article
ISSN: 0144-5154

Keywords

Article
Publication date: 14 May 2018

Masood Fathi, Dalila Benedita Machado Martins Fontes, Matias Urenda Moris and Morteza Ghobakhloo

The purpose of this study is to first investigate the efficiency of the most commonly used performance measures for minimizing the number of workstations (NWs) in approaches…

1563

Abstract

Purpose

The purpose of this study is to first investigate the efficiency of the most commonly used performance measures for minimizing the number of workstations (NWs) in approaches addressing simple assembly line balancing problem (SALBP) for both straight and U-shaped line, and second to provide a comparative evaluation of 20 constructive heuristics to find solutions to the SALBP-1.

Design/methodology/approach

A total of 200 problems are solved by 20 different constructive heuristics for both straight and U-shaped assembly line. Moreover, several comparisons have been made to evaluate the performance of constructive heuristics.

Findings

Minimizing the smoothness index is not necessarily equivalent to minimizing the NWs; therefore, it should not be used as the fitness function in approaches addressing the SALBP-1. Line efficiency and the idle time are indeed reliable performance measures for minimizing the NWs. The most promising heuristics for straight and U-shaped line configurations for SALBP-1 are also ranked and introduced.

Practical implications

Results are expected to help scholars and industrial practitioners to better design effective solution methods for having the most balanced assembly line. This study will further help with choosing the most proper heuristic with regard to the problem specifications and line configuration.

Originality/value

There is limited research assessing the efficiency of the common objectives for SALBP-1. This study is among the first to prove that minimizing the workload smoothness is not equivalent to minimizing the NWs in SALBP-1 studies. This work is also one of the first attempts for evaluating the constructive heuristics for both straight and U-shaped line configurations.

Details

Journal of Modelling in Management, vol. 13 no. 2
Type: Research Article
ISSN: 1746-5664

Keywords

Article
Publication date: 16 January 2019

Muhamad Magffierah Razali, Nur Hairunnisa Kamarudin, Mohd Fadzil Faisae Ab. Rashid and Ahmad Nasser Mohd Rose

This paper aims to review and discuss four aspects of mixed-model assembly line balancing (MMALB) problem mainly on the optimization angle. MMALB is a non-deterministic…

Abstract

Purpose

This paper aims to review and discuss four aspects of mixed-model assembly line balancing (MMALB) problem mainly on the optimization angle. MMALB is a non-deterministic polynomial-time hard problem which requires an effective algorithm for solution. This problem has attracted a number of research fields: manufacturing, mathematics and computer science.

Design/methodology/approach

This paper review 59 published research works on MMALB from indexed journal. The review includes MMALB problem varieties, optimization algorithm, objective function and constraints in the problem.

Findings

Based on research trend, this topic is still growing with the highest publication number observed in 2016 and 2017. The review indicated that the future research direction should focus on human factors and sustainable issues in the problem modeling. As the assembly cost becomes crucial, resource utilization in the assembly line should also be considered. Apart from that, the growth of new optimization algorithms is predicted to influence the MMALB optimization, which currently relies on well-established algorithms.

Originality/value

The originality of this paper is on the research trend in MMALB. It provides the future direction for the researchers in this field.

Details

Engineering Computations, vol. 36 no. 2
Type: Research Article
ISSN: 0264-4401

Keywords

1 – 10 of 23