Search results

1 – 2 of 2
Article
Publication date: 28 March 2024

Chinthaka Niroshan Atapattu, Niluka Domingo and Monty Sutrisna

The current estimation practice in construction projects greatly needs upgrading, as there has been no improvement in the cost overrun issue over the past 70 years. The purpose of…

Abstract

Purpose

The current estimation practice in construction projects greatly needs upgrading, as there has been no improvement in the cost overrun issue over the past 70 years. The purpose of this research was to develop a new multiple regression analysis (MRA)-based model to forecast the final cost of road projects at the pre-design stage using data from 43 projects in New Zealand (NZ).

Design/methodology/approach

The research used the case study of 43 completed road projects in NZ. Document analysis was conducted to collect data, and statistical tests were used for model development and analysis.

Findings

Eight models were developed, and all models achieved the required F statistics and met the regression assumptions. The models’ mean absolute percentage error (MAPE) was between 21.25% and 22.77%. The model with the lowest MAPE comprised the road length and width, number of bridges, pavement area, cut and fill area, preliminary cost and cost indices change.

Research limitations/implications

The model is based on road projects in NZ. However, it was designed to be able to adapt to other contexts. The findings suggest that the model can be used to improve traditional conceptual estimating methods. Past project data is often stored by the project team but rarely used for analysing and forecasting purposes. This research emphasises that past data can be effectively used to predict the project cost at the pre-design stage with limited information.

Originality/value

No research was conducted to adopt cost modelling techniques into the conceptual estimation practice in the NZ construction industry.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 12 October 2022

Thomas Danel, Zoubeir Lafhaj, Anand Puppala, Samer BuHamdan, Sophie Lienard and Philippe Richard

The crane plays an essential role in modern construction sites as it supports numerous operations and activities on-site. Additionally, the crane produces a big amount of data…

243

Abstract

Purpose

The crane plays an essential role in modern construction sites as it supports numerous operations and activities on-site. Additionally, the crane produces a big amount of data that, if analyzed, could significantly affect productivity, progress monitoring and decision-making in construction projects. This paper aims to show the usability of crane data in tracking the progress of activities on-site.

Design/methodology/approach

This paper presents a pattern-based recognition method to detect concrete pouring activities on any concrete-based construction sites. A case study is presented to assess the methodology with a real-life example.

Findings

The analysis of the data helped build a theoretical pattern for concrete pouring activities and detect the different phases and progress of these activities. Accordingly, the data become useable to track progress and identify problems in concrete pouring activities.

Research limitations/implications

The paper presents an example for construction practitioners and researcher about a practical and easy way to analyze the big data that comes from cranes and how it is used in tracking projects' progress. The current study focuses only on concrete pouring activities; future studies can include other types of activities and can utilize the data with other building methods to improve construction productivity.

Practical implications

The proposed approach is supposed to be simultaneously efficient in terms of concrete pouring detection as well as cost-effective. Construction practitioners could track concrete activities using an already-embedded monitoring device.

Originality/value

While several studies in the literature targeted the optimization of crane operations and of mitigating hazards through automation and sensing, the opportunity of using cranes as progress trackers is yet to be fully exploited.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 2 of 2