Search results

1 – 10 of 250
Article
Publication date: 9 April 2024

Derek L. Nazareth, Jae Choi and Thomas Ngo-Ye

This paper aims to examine the conditions under which small and medium enterprises (SMEs) invest in security services when they migrate their e-commerce applications to the cloud…

Abstract

Purpose

This paper aims to examine the conditions under which small and medium enterprises (SMEs) invest in security services when they migrate their e-commerce applications to the cloud environment. Using a risk management perspective, the paper assesses the impact of security service pricing, security incident prevalence and virulence to estimate SME security spending at the market level and draw out implications for SMEs and security service providers.

Design/methodology/approach

Security risks are inherently characterized by uncertainty. This study uses a Monte Carlo approach to understand the role of uncertainty in the decision to adopt security services. A model relating key security constructs is assembled based on key constructs from the domain. By manipulating security service costs and security incident types, the model estimates the market-level adoption of services, security incidents and damages incurred, along with measures of their relative dispersion.

Findings

Three key findings emerge from this study. First, adoption of services and protection is higher when tiered security services are provided, indicating that SMEs prefer to choose their security services rather than accept uniformly priced products. Second, SMEs are considered price-sensitive, resulting in a maximum level of spending in the market. Third, results indicate that security incidents and damages can be much higher than the mean in some cases, and this should serve as a cautionary note to SMEs.

Originality/value

Security spending has been modeled at the firm level. Adopting a market-level perspective represents a novel contribution. Additionally, the Monte Carlo approach provides managers with tangible measures of uncertainty, affording additional information and insight when making security service adoption decisions.

Details

Journal of Systems and Information Technology, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1328-7265

Keywords

Article
Publication date: 23 February 2024

Anand Prakash and Sudhir Ambekar

This study aims to describe the fundamentals of teaching risk management in a classroom setting, with an emphasis on the learning interface between higher education and the…

Abstract

Purpose

This study aims to describe the fundamentals of teaching risk management in a classroom setting, with an emphasis on the learning interface between higher education and the workplace environment for business management students.

Design/methodology/approach

The study reviews literature that uses spreadsheets to visualize and model risk and uncertainty. Using six distinct case-based activities (CBAs), the study illustrates the practical applications of software like Palisade @RISK in risk management education. It helps to close the gap between theory and practice. The software assists in estimating the likelihood of a risk event and the impact or repercussions it will have if it occurs. This technique of risk analysis makes it possible to identify the risks that need the most active control.

Findings

@RISK can be used to create models that produce results to demonstrate every potential scenario outcome. When faced with a choice or analysis that involves uncertainty, @RISK can be utilized to enhance the perspective of what the future might contain.

Originality/value

The insights from this study can be used to develop critical thinking, independent thinking, problem-solving and other important skills in learners. Further, educators can apply Bloom’s taxonomy and the problem-solving taxonomy to help students make informed decisions in risky situations.

Details

Higher Education, Skills and Work-Based Learning, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2042-3896

Keywords

Article
Publication date: 26 January 2022

Liangyan Liu and Ming Cheng

In the process of building the “Belt and Road” and “Bright Road” community of interests between China and Kazakhstan, this paper proposes the construction of an inland nuclear…

Abstract

Purpose

In the process of building the “Belt and Road” and “Bright Road” community of interests between China and Kazakhstan, this paper proposes the construction of an inland nuclear power plant in Kazakhstan. Considering the uncertainty of investment in nuclear power generation, the authors propose the MGT (Monte-Carlo and Gaussian Radial Basis with Tensor factorization) utility evaluation model to evaluate the risk of investment in nuclear power in Kazakhstan and provide a relevant reference for decision making on inland nuclear investment in Kazakhstan.

Design/methodology/approach

Based on real options portfolio combined with a weighted utility function, this study takes into account the uncertainties associated with nuclear power investments through a minimum variance Monte Carlo approach, proposes a noise-enhancing process combined with geometric Brownian motion in solving complex conditions, and incorporates a measure of investment flexibility and strategic value in the investment, and then uses a deep noise reduction encoder to learn the initial values for potential features of cost and investment effectiveness. A Gaussian radial basis function used to construct a weighted utility function for each uncertainty, generate a minimization of the objective function for the tensor decomposition, and then optimize the objective loss function for the tensor decomposition, find the corresponding weights, and perform noise reduction to generalize the nonlinear problem to evaluate the effectiveness of nuclear power investment. Finally, the two dimensions of cost and risk (estimation of investment value and measurement of investment risk) are applied and simulated through actual data in Kazakhstan.

Findings

The authors assess the core indicators of Kazakhstan's nuclear power plants throughout their construction and operating cycles, based on data relating to a cluster of nuclear power plants of 10 different technologies. The authors compared it with several popular methods for evaluating the benefits of nuclear power generation and conducted subsequent sensitivity analyses of key indicators. Experimental results on the dataset show that the MGT method outperforms the other four methods and that changes in nuclear investment returns are more sensitive to changes in costs while operating cash flows from nuclear power are certainly an effective way to drive investment reform in inland nuclear power generation in Kazakhstan at current levels of investment costs.

Research limitations/implications

Future research could consider exploring other excellent methods to improve the accuracy of the investment prediction further using sparseness and noise interference. Also consider collecting some expert advice and providing more appropriate specific suggestions, which will facilitate the application in practice.

Practical implications

The Novel Coronavirus epidemic has plunged the global economy into a deep recession, the tension between China and the US has made the energy cooperation road unusually tortuous, Kazakhstan in Central Asia has natural geographical and resource advantages, so China–Kazakhstan energy cooperation as a new era of opportunity, providing a strong guarantee for China's political and economic stability. The basic idea of building large-scale nuclear power plants in Balkhash and Aktau is put forward, considering the development strategy of building Kazakhstan into a regional international energy base. This work will be a good inspiration for the investment of nuclear generation.

Originality/value

This study solves the problem of increasing noise by combining Monte Carlo simulation with geometric Brownian motion under complex conditions, adds the measure of investment flexibility and strategic value, constructs the utility function of noise reduction weight based on Gaussian radial basis function and extends the nonlinear problem to the evaluation of nuclear power investment benefit.

Details

Industrial Management & Data Systems, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 8 November 2023

Marcus Achenbach and Guido Morgenthal

The design check regarding the fire resistance of concrete slabs can be easily performed using tabulated values. These tables are based on experimental results, but the level of…

Abstract

Purpose

The design check regarding the fire resistance of concrete slabs can be easily performed using tabulated values. These tables are based on experimental results, but the level of safety, which is obtained by this approach, is not known. On the other hand, performance-based methods are more accepted, but require a target reliability as performance criterion. Hence, there is a need for calibration of the performance-based methods using the results of the “traditional” descriptive approach.

Design/methodology/approach

The calibration is performed for a single span concrete slab, where the axis distance of the reinforcement is chosen according to Eurocode 2 for a defined fire rating. A “standard” compartment is selected to cover typical fields of application. The opening factor is considered as parameter to obtain the maximum peak temperatures in the compartment. A Monte Carlo simulation, in combination with a response surface method, is set up to calculate the probabilities of failure.

Findings

The results indicate that the calculated reliability index for a standard is within the range, which has been used for the derivation of safety and combination factors in the Eurocodes. It can be observed that members designed for a fire rating R90 have a significant increase in the structural safety for natural fires compared to a design for a fire rating R30.

Originality/value

The level of safety, which is obtained by a design based on tabulated values, is quantified for concrete slabs. The results are a necessary input for the calibration of performance-based methods and could stimulate discussions among scientists and building authorities.

Details

Journal of Structural Fire Engineering, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-2317

Keywords

Article
Publication date: 21 December 2023

Libiao Bai, Xuyang Zhao, ShuYun Kang, Yiming Ma and BingBing Zhang

Research and development (R&D) projects are often pursued through a project portfolio (PP). R&D PPs involve many stakeholders, and without proactive management, their interactions…

Abstract

Purpose

Research and development (R&D) projects are often pursued through a project portfolio (PP). R&D PPs involve many stakeholders, and without proactive management, their interactions may lead to conflict risks. These conflict risks change dynamically with different stages of the PP life cycle, increasing the challenge of PP risk management. Existing conflict risk research mainly focuses on source identification but lacks risk assessment work. To better manage the stakeholder conflict risks (SCRs) of R&D PPs, this study employs the dynamic Bayesian network (DBN) to construct its dynamic assessment model.

Design/methodology/approach

This study constructs a DBN model to assess the SCRs in R&D PP. First, an indicator system of SCRs is constructed from the life cycle perspective. Then, the risk relationships within each R&D PPs life cycle stage are identified via interpretative structural modeling (ISM). The prior and conditional probabilities of risks are obtained by expert judgment and Monte Carlo simulation (MCS). Finally, crucial SCRs at each stage are identified utilizing propagation analysis, and the corresponding risk responses are proposed.

Findings

The results of the study identify the crucial risks at each stage. Also, for the crucial risks, this study suggests appropriate risk response strategies to help managers better perform risk response activities.

Originality/value

This study dynamically assesses the stakeholder conflict risks in R&D PPs from a life-cycle perspective, extending the stakeholder risk management research. Meanwhile, the crucial risks are identified at each stage accordingly, providing managerial insights for R&D PPs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 September 2023

Mohammad Hossein Dehghani Sadrabadi, Ahmad Makui, Rouzbeh Ghousi and Armin Jabbarzadeh

The adverse interactions between disruptions can increase the supply chain's vulnerability. Accordingly, establishing supply chain resilience to deal with disruptions and…

Abstract

Purpose

The adverse interactions between disruptions can increase the supply chain's vulnerability. Accordingly, establishing supply chain resilience to deal with disruptions and employing business continuity planning to preserve risk management achievements is of considerable importance. The aforementioned idea is discussed in this study.

Design/methodology/approach

This study proposes a multi-objective optimization model for employing business continuity management and organizational resilience in a supply chain for responding to multiple interrelated disruptions. The improved augmented e-constraint and the scenario-based robust optimization methods are adopted for multi-objective programming and dealing with uncertainty, respectively. A case study of the automotive battery manufacturing industry is also considered to ensure real-world conformity of the model.

Findings

The results indicate that interactions between disruptions remarkably increase the supply chain's vulnerability. Choosing a higher fortification level for the supply chain and foreign suppliers reduces disruption impacts on resources and improves the supply chain's resilience and business continuity. Facilities dispersion, fortification of facilities, lateral transshipment, order deferral policy, dynamic capacity planning and direct transportation of products to markets are the most efficient resilience strategies in the under-study industry.

Originality/value

Applying resource allocation planning and portfolio selection to adopt preventive and reactive resilience strategies simultaneously to manage multiple interrelated disruptions in a real-world automotive battery manufacturing industry, maintaining the long-term achievements of supply chain resilience using business continuity management and dynamic capacity planning are the main contributions of the presented paper.

Article
Publication date: 27 June 2023

Kessara Kanchanapoom and Jongsawas Chongwatpol

Customer lifetime value (CLV) is one of the key indicators to measure the success or health of an organization. How can an organization assess the organization's customers'…

Abstract

Purpose

Customer lifetime value (CLV) is one of the key indicators to measure the success or health of an organization. How can an organization assess the organization's customers' lifetime value (LTV) and offer relevant strategies to retain prospective and profitable customers? This study offers an integrated view of different methods for calculating CLVs for both loyalty members and non-membership customers.

Design/methodology/approach

This study outlines eleven methods for calculating CLV considering (1) the deterministic aspect of NPV (Net present value) models in both finite and infinite timespans, (2) the geometric pattern and (3) the probabilistic aspect of parameter estimates through simulation modeling along with (4) the migration models for including “the probability that customers will return in the future” as a key input for CLV calculation.

Findings

The CLV models are validated in the context of complementary and alternative medicine (CAM)in the healthcare industry. The results show that understanding CLV can help the organization develop strategies to retain valuable customers while maintaining profit margins.

Originality/value

The integrated CLV models provide an overview of the mathematical estimation of LTVs depending on the nature of the customers and the business circumstances and can be applied to other business settings.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 19 June 2023

Abdelrahman M. Farouk and Rahimi A. Rahman

Implementing building information modeling (BIM) in construction projects offers many benefits. However, the use of BIM in project cost management is still limited. This study…

Abstract

Purpose

Implementing building information modeling (BIM) in construction projects offers many benefits. However, the use of BIM in project cost management is still limited. This study aims to review the current trends in the application of BIM in project cost management.

Design/methodology/approach

This study systematically reviews the literature on the application of BIM in project cost management. A total of 46 related articles were identified and analyzed using the Preferred Reporting Items for Systematic Reviews and Meta-Analyses method.

Findings

Eighteen approaches to applying BIM in project cost management were identified. The approaches can be grouped into cost control and cost estimation. Also, BIM can be applied independently or integrated with other techniques. The integrated approaches for cost control include integration with genetic algorithms, Monte Carlo simulation, lean construction, integrated project delivery, neural network and value engineering. On the contrary, integrated approaches for cost estimation include integration with cost-plus pricing, discrepancy analysis, construction progress curves, estimation standards, algorithms, declarative mappings, life cycle sustainability assessment, ontology, Web-based frameworks and structured query language.

Originality/value

To the best of the authors’ knowledge, this study is the first to systematically review prior literature on the application of BIM in project cost management. As a result, the study provides a comprehensive understanding of the current state of the art and fills the literature gap. Researchers and industry professionals can use the study findings to increase the benefits of implementing BIM in construction projects.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 27 March 2024

Xiaomei Liu, Bin Ma, Meina Gao and Lin Chen

A time-varying grey Fourier model (TVGFM(1,1,N)) is proposed for the simulation of variable amplitude seasonal fluctuation time series, as the performance of traditional grey…

16

Abstract

Purpose

A time-varying grey Fourier model (TVGFM(1,1,N)) is proposed for the simulation of variable amplitude seasonal fluctuation time series, as the performance of traditional grey models can't catch the time-varying trend well.

Design/methodology/approach

The proposed model couples Fourier series and linear time-varying terms as the grey action, to describe the characteristics of variable amplitude and seasonality. The truncated Fourier order N is preselected from the alternative order set by Nyquist-Shannon sampling theorem and the principle of simplicity, then the optimal Fourier order is determined by hold-out method to improve the robustness of the proposed model. Initial value correction and the multiple transformation are also studied to improve the precision.

Findings

The new model has a broader applicability range as a result of the new grey action, attaining higher fitting and forecasting accuracy. The numerical experiment of a generated monthly time series indicates the proposed model can accurately fit the variable amplitude seasonal sequence, in which the mean absolute percentage error (MAPE) is only 0.01%, and the complex simulations based on Monte-Carlo method testify the validity of the proposed model. The results of monthly electricity consumption in China's primary industry, demonstrate the proposed model catches the time-varying trend and has good performances, where MAPEF and MAPET are below 5%. Moreover, the proposed TVGFM(1,1,N) model is superior to the benchmark models, grey polynomial model (GMP(1,1,N)), grey Fourier model (GFM(1,1,N)), seasonal grey model (SGM(1,1)), seasonal ARIMA model seasonal autoregressive integrated moving average model (SARIMA) and support vector regression (SVR).

Originality/value

The parameter estimates and forecasting of the new proposed TVGFM are studied, and the good fitting and forecasting accuracy of time-varying amplitude seasonal fluctuation series are testified by numerical simulations and a case study.

Details

Grey Systems: Theory and Application, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2043-9377

Keywords

Article
Publication date: 27 February 2024

Zhiyu Dong, Ruize Qin, Ping Zou, Xin Yao, Peng Cui, Fan Zhang and Yizhou Yang

The occupational health risk associated with the production of prefabricated concrete components is often overlooked. This paper will use a damage assessment and cyclic mitigation…

29

Abstract

Purpose

The occupational health risk associated with the production of prefabricated concrete components is often overlooked. This paper will use a damage assessment and cyclic mitigation (DACM) model to provide individualized exposure risk assessment and corresponding mitigation management measures for workers who are being exposed.

Design/methodology/approach

The DACM model is proposed based on the concept of life cycle assessment (LCA). The model uses Monte-Carlo simulation for uncertainty risk assessment, followed by quantitative damage assessment using disability-adjusted life year (DALY). Lastly, sensitivity analysis is used to identify the parameters with the greatest impact on health risks.

Findings

The results show that the dust concentration is centered around the mean, and the fitting results are close to normal distribution, so the mean value can be used to carry out the calculation of risk. However, calculations using the DACM model revealed that there are still some work areas at risk. DALY damage is most severe in concrete production area. Meanwhile, the inhalation rate (IR), exposure duration (ED), exposure frequency (EF) and average exposure time (AT) showed greater impacts based on the sensitivity analysis.

Originality/value

Based on the comparison, the DACM model can determine that the potential occupational health risk of prefabricated concrete component (PC) factory and the risk is less than that of on-site construction. It synthesizes field research and simulation to form the entire assessment process into a case-base system with the depth of the cycle, which allows the model to be continuously adjusted to reduce the occupational health damage caused by production pollution exposure.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 250