Article
Publication date: 9 August 2018

Ahmad Huzaimi Abd Jamil and Mohamad Syazli Fathi

Building information modeling (BIM) has been proven to enable outstanding results in construction processes by enhancing knowledge sharing with regard to a building or facility…

2536

Abstract

Purpose

Building information modeling (BIM) has been proven to enable outstanding results in construction processes by enhancing knowledge sharing with regard to a building or facility throughout its life cycle from the conceptual design to facility management. The purpose of this paper is to investigate the extent to which the use of BIM has impacted the legal and contractual implications of the existing construction contracts for aligning the three sets of relevant development domains: BIM functionality, contract procurement methods, and BIM legal and contractual issues to enhance the efficient use of valuable resources.

Design/methodology/approach

This exploratory study was undertaken by analyzing the literature using a novel approach involving a matrix that juxtaposes BIM functionalities for each project life cycle with contract procurement methods. As part of the study, 28 interactions of BIM legal and contractual issues have been identified, as representing positive and negative interactions.

Findings

The interaction matrix framework that juxtaposes BIM functionalities and procurement methods highlights the theoretical and practical relationships identified between the methods. It also simultaneously recognizes the constructive and destructive interactions between these development domains by means of critically identifying the possible interactions of the legal and contractual aspects of both the BIM project procurement and the practical aspects of BIM project delivery.

Originality/value

The present study contributes to the existing literature by extensively identifying the probable interactions of contractual issues within BIM functionality with contract procurement methods throughout the life cycle of a building construction project.

Details

Built Environment Project and Asset Management, vol. 8 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 16 February 2022

Zeeshan Aziz, Ebrahim Alzaabi and Mohamad Syazli Fathi

This paper aims to develop a crisis readiness framework for road traffic crisis response for law enforcement agencies in the United Arab Emirates (UAE).

Abstract

Purpose

This paper aims to develop a crisis readiness framework for road traffic crisis response for law enforcement agencies in the United Arab Emirates (UAE).

Design/methodology/approach

A Delphi method was used that combined questionnaire-based survey and the analytical hierarchy process to collect quantitative and qualitative data from an expert panel of crisis readiness professionals on how they prioritise and weigh the different strategic criteria, sub-criteria and performance indicators in the context of law enforcement agencies’ traffic response.

Findings

The findings of this paper resulted in the identification, ranking and validation of ten key dimensions of crisis readiness clustered into three distinct sets of priority rankings: response planning, resources, training and coordination; information management and communication and risk and hazard assessment; and early warning, legal and institutional frameworks, recovery initiation and property protection. The results additionally established the relative priority of sub-criteria for each criterion and validated a broad set of key performance indicators (KPIs) for the top six ranked criteria.

Research limitations/implications

The findings are based on a single case study focused on a specific area of operation within crisis response and one group of organisations of the UAE police sector. This potentially places a constraint on the wider generalisation of the findings to different operational areas and agencies, as they may have different priorities or organisational conditions that have implications for the framework application and the relative importance of certain criteria and sub-criteria.

Practical implications

This paper provides strategic guidance in the form of a prioritised list of criteria, sub-criteria and KPIs that can direct efforts to optimise different dimensions of crisis readiness at a strategic and operational level.

Originality/value

This paper makes an original contribution in identifying the key criteria and performance indicators of crisis readiness for road traffic situations. The findings contribute a comprehensive strategic readiness framework that supports planning and decision-making for the development of organisational capacities that can enhance response times of police to road traffic crises. This framework ranks dimensions of crisis readiness and key sub-criteria in order of priority and validates the key components of crisis readiness that can support practitioners to structure, standardise and benchmark key processes and elements of crisis response.

Details

Journal of Financial Management of Property and Construction , vol. 28 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 17 February 2022

Siti Zati Hanani Mahamood and Mohamad Syazli Fathi

This paper aims to improve the seismic building design (SBD) work process for Malaysian Government projects.

Abstract

Purpose

This paper aims to improve the seismic building design (SBD) work process for Malaysian Government projects.

Design/methodology/approach

Semi-structured interviews were virtually conducted to a small sample size of internal and external stakeholders from the Malaysian Government technical agency. There were seven of them, comprising Structural Engineers, an Architect, a Quantity Surveyor and consultants-linked government projects. The respondents have at least five years of experience in building design and construction.

Findings

The paper evaluates the current SBD work process in the government technical agency. There were four main elements that appear to need to be improved, specifically in the design stage: limitations in visualization, variation of works, data management and coordination.

Research limitations/implications

This study was limited to Malaysian Government building projects and covered a small sample size. Therefore, further research is recommended to extend to other government agencies or ministries to obtain better results. Furthermore, the findings and proposal for improvements to the SBD work process can also be replicated for other similar disasters resilience projects.

Practical implications

The findings and proposal for improvements to the SBD work process can also be replicated for other similar disasters resilience projects.

Social implications

This study was limited to government building projects and covered a small sample size. Therefore, further research is recommended to extend to other government agencies or ministries to obtain better results. Furthermore, the findings and proposal for improvements to the SBD work process can also be replicated for other similar disasters resilience projects.

Originality/value

This study provides an initial step to introduce the potential of building information modeling for SBD in implementing Malaysian Government projects. It will be beneficial both pre-and post-disaster and is a significant step toward a resilient infrastructure and community.

Details

International Journal of Disaster Resilience in the Built Environment, vol. 13 no. 2
Type: Research Article
ISSN: 1759-5908

Keywords

Abstract

Details

Journal of Financial Management of Property and Construction , vol. 28 no. 2
Type: Research Article
ISSN: 1366-4387