1 – 10 of 73
Article
Publication date: 1 November 2022

Zihao Zheng, Yuanqi Li and Jaume Torres

This paper aims to propose a generative design method combined with meta-heuristic algorithm for automating and optimizing the floor layout of modular buildings using typical…

Abstract

Purpose

This paper aims to propose a generative design method combined with meta-heuristic algorithm for automating and optimizing the floor layout of modular buildings using typical standardized module units, which are the room module, the corridor module and the stair module.

Design/methodology/approach

The integrated framework involves the generative design method and optimization for modular construction. The generative rules are provided by geometric relationships and functionalities of the module units. An evaluation function of the generated floor plans is also presented by the combination of project cost and cost penalties for the geometric features. The multi-population genetic algorithm (MPGA) method is provided for the optimization of the combination of costs.

Findings

The proposed MPGA method is demonstrated fast and efficient at discovering the globally optimal solution. The results indicate that when the unit price of modules is high, the transportation distance is long, or the land cost is high, the layout cost, which related to the symmetry, the compactness and the energy is tend to be lower, making the optimal layout economical.

Originality/value

This paper presented an integrated framework of generative floor layout and optimization for modular construction by using typical module units. It fulfills the need for automated layout generation with repetitive units and corresponding assessment during the early design stage.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 17 April 2024

Daan Kabel, Jason Martin and Mattias Elg

The integration of industry 4.0 has become a priority for many organizations. However, not all organizations are suitable and capable of implementing industry 4.0 because it…

Abstract

Purpose

The integration of industry 4.0 has become a priority for many organizations. However, not all organizations are suitable and capable of implementing industry 4.0 because it requires a dynamic and flexible implementation strategy. The implementation of industry 4.0 often involves overcoming several tensions between internal and external stakeholders. This paper aims to explore the paradoxical tensions that arise for health-care organizations when integrating industry 4.0. Moreover, it discusses how a paradox lens can support the conceptualization and proposes techniques for handling tensions during the integration of industry 4.0.

Design/methodology/approach

This qualitative and in-depth study draws upon 32 semi-structured interviews. The empirical case concerns how two health-care organizations handle paradoxical tensions during the integration of industry 4.0.

Findings

The exploration resulted in six recurring technology tensions: technology invention (modularized design vs. flexible design), technology collaboration (automation vs. human augmentation), technology-driven patient experience (control vs. autonomy), technology uncertainty (short-term experimentation vs. long-term planning), technology invention and diffusion through collaborative efforts among stakeholders (selective vs. intensive collaboration) and technological innovation (market maintenance vs. disruption).

Originality/value

A paradox theory-informed conceptual model is proposed for how to handle tensions during the integration of industry 4.0. To the best of the authors’ knowledge, this is the first paper to introduce paradox theory for quality management, including lean and Six Sigma.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 26 March 2024

Keyu Chen, Beiyu You, Yanbo Zhang and Zhengyi Chen

Prefabricated building has been widely applied in the construction industry all over the world, which can significantly reduce labor consumption and improve construction…

Abstract

Purpose

Prefabricated building has been widely applied in the construction industry all over the world, which can significantly reduce labor consumption and improve construction efficiency compared with conventional approaches. During the construction of prefabricated buildings, the overall efficiency largely depends on the lifting sequence and path of each prefabricated component. To improve the efficiency and safety of the lifting process, this study proposes a framework for automatically optimizing the lifting path of prefabricated building components using building information modeling (BIM), improved 3D-A* and a physic-informed genetic algorithm (GA).

Design/methodology/approach

Firstly, the industry foundation class (IFC) schema for prefabricated buildings is established to enrich the semantic information of BIM. After extracting corresponding component attributes from BIM, the models of typical prefabricated components and their slings are simplified. Further, the slings and elements’ rotations are considered to build a safety bounding box. Secondly, an efficient 3D-A* is proposed for element path planning by integrating both safety factors and variable step size. Finally, an efficient GA is designed to obtain the optimal lifting sequence that satisfies physical constraints.

Findings

The proposed optimization framework is validated in a physics engine with a pilot project, which enables better understanding. The results show that the framework can intuitively and automatically generate the optimal lifting path for each type of prefabricated building component. Compared with traditional algorithms, the improved path planning algorithm significantly reduces the number of nodes computed by 91.48%, resulting in a notable decrease in search time by 75.68%.

Originality/value

In this study, a prefabricated component path planning framework based on the improved A* algorithm and GA is proposed for the first time. In addition, this study proposes a safety-bounding box that considers the effects of torsion and slinging of components during lifting. The semantic information of IFC for component lifting is enriched by taking into account lifting data such as binding positions, lifting methods, lifting angles and lifting offsets.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 March 2024

Qianmai Luo, Chengshuang Sun, Ying Li, Zhenqiang Qi and Guozong Zhang

With increasing complexity of construction projects and new construction processes and methods are adopted, more safety hazards are emerging at construction sites, requiring the…

Abstract

Purpose

With increasing complexity of construction projects and new construction processes and methods are adopted, more safety hazards are emerging at construction sites, requiring the application of the modern risk management methods. As an emerging technology, digital twin has already made valuable contributions to safety risk management in many fields. Therefore, exploring the application of digital twin technology in construction safety risk management is of great significance. The purpose of this study is to explore the current research status and application potential of digital twin technology in construction safety risk management.

Design/methodology/approach

This study followed a four-stage literature processing approach as outlined in the systematic literature review procedure guidelines. It then combined the quantitative analysis tools and qualitative analysis methods to organize and summarize the current research status of digital twin technology in the field of construction safety risk management, analyze the application of digital twin technology in construction safety risk management and identify future research trends.

Findings

The research findings indicate that the application of digital twin technology in the field of construction safety risk management is still in its early stages. Based on the results of the literature analysis, this paper summarizes five aspects of digital twin technology's application in construction safety risk management: real-time monitoring and early warning, safety risk prediction and assessment, accident simulation and emergency response, safety risk management decision support and safety training and education. It also proposes future research trends based on the current research challenges.

Originality/value

This study provides valuable references for the extended application of digital twin technology and offers a new perspective and approach for modern construction safety risk management. It contributes to the enhancement of the theoretical framework for construction safety risk management and the improvement of on-site construction safety.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

79263

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 18 November 2022

Jing Yin, Jiahao Li, Ahui Yang and Shunyao Cai

In regarding to operational efficiency and safety improvements, multiple tower crane service scheduling problem is one of the main problems related to tower crane operation but…

Abstract

Purpose

In regarding to operational efficiency and safety improvements, multiple tower crane service scheduling problem is one of the main problems related to tower crane operation but receives limited attention. The current work presents an optimization model for scheduling multiple tower cranes' service with overlapping areas while achieving collision-free between cranes.

Design/methodology/approach

The cooperative coevolutionary genetic algorithm (CCGA) was proposed to solve this model. Considering the possible types of cross-tasks, through effectively allocating overlapping area tasks to each crane and then prioritizing the assigned tasks for each crane, the makespan of tower cranes was minimized and the crane collision avoidance was achieved by only allowing one crane entering the overlapping area at one time. A case study of the mega project Daxing International Airport has been investigated to evaluate the performance of the proposed algorithm.

Findings

The computational results showed that the CCGA algorithm outperforms two compared algorithms in terms of the optimal makespan and the CPU time. Also, the convergence of CCGA was discussed and compared, which was better than that of traditional genetic algorithm (TGA) for small-sized set (50 tasks) and was almost the same as TGA for large-sized sets.

Originality/value

This paper can provide new perspectives on multiple tower crane service sequencing problem. The proposed model and algorithm can be applied directly to enhance the operational efficiency of tower cranes on construction site.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Xichen Chen, Alice Yan Chang-Richards, Florence Yean Yng Ling, Tak Wing Yiu, Antony Pelosi and Nan Yang

Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This…

Abstract

Purpose

Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This paper aims to discover DT deployment patterns and emerging trends in real-life AEC projects.

Design/methodology/approach

A case study methodology was adopted, including individual case analyses and comparative multiple-case analyses.

Findings

The results revealed the temporal distribution of DT in practical AEC projects, specific DT products/software, major project types integrated with digital solutions, DT application areas and project stages and associated project performance. Three distinct patterns in DT adoption have been observed, reflecting the evolution of DT applications, the progression from single to multiple DT integration and alignment with emerging industry requirements. The DT adoption behavior in the studied cases has been examined using the technology-organization-environment-human (TOE + H) framework. Further, eight emerging trend streams for future DT adoption were identified, with “leveraging the diverse features of certain mature DT” being a shared recognition of all studied companies.

Practical implications

This research offers actionable insights for AEC companies, facilitating the development of customized DT implementation roadmaps aligned with organizational needs. Policymakers, industry associations and DT suppliers may leverage these findings for informed decision-making, collaborative educational initiatives and product/service customization.

Originality/value

This research provides empirical evidence of applicable products/software, application areas and project performance. The examination of the TOE + H framework offers a holistic understanding of the collective influences on DT adoption. The identification of emerging trends addresses the evolving demands of the AEC industry in the digital era.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 February 2024

Alexander Chulok, Maxim Kotsemir, Yadviga Radomirova and Sergey Shashnov

The purpose of this study is to create a methodological approach for identifying priority areas for science and technology (S&T) development and its empirical application within…

Abstract

Purpose

The purpose of this study is to create a methodological approach for identifying priority areas for science and technology (S&T) development and its empirical application within the city of Moscow. This research uncovers a wide range of multicultural and multidisciplinary global trends that will affect the development of major cities in an era of complexity and uncertainty, including the inherent complexity of urban contexts, demographic and socioeconomic trends, as well as scientific and ecological factors.

Design/methodology/approach

The methodological approach is based on classic foresight instruments. Its novelty lays in the blending of qualitative and quantitative methods specially selected as the most appropriate for the identification of S&T areas in an era of complexity and uncertainty, including horizon scanning, bibliometric analysis, expert surveys and the construction of composite indexes with respect to the scope and resources of the research and the selected object for empirical application – Moscow, which is one of the world’s largest megacities. The analysis was performed for the period of 2009–2018 and expert procedures took place in 2019.

Findings

As a result, 25 global trends were identified, evaluated and discussed over the course of an expert survey and subsequent expert events. Ten priority areas of S&T development were determined, including 62 technological sub-areas within them and the most important market niches for all identified technological sub-areas, which could be useful for the world’s megacities. The results of this study are illustrated using the construction sector. Based on the conducted research and results, a list of recommendations on S&T policy measures and instruments were suggested, including the creation of the Moscow Innovation Cluster, which by the end of 2023 contained more than 6,000 projects and initiatives, selected using the findings of this investigation.

Originality/value

This research contributes to the existing literature and research agenda of setting priorities for S&T development and shows how it can be done for a megacity. The blended foresight methodology that was created within the study satisfies the criteria of scientific originality, is repeatable for any interested researcher, is applicable to any other city in the world and demonstrates its high efficiency in empirical application. It could be used for creating new agenda items in S&T policy, setting S&T priorities for a megacity and integrating the results into decision-making processes. This study provides recommendations on the further implementation of the designed methodology and results into a policymaking system. Moreover, the example of the Moscow Innovation Cluster, which was created based on the results of our research, demonstrates these recommendations’ practical significance in real life, which is quite valuable. The limitation of this study is that it is not devoted to urban planning issues directly or the promotion of R&D areas; it is about setting promising S&T priorities in an era of complexity and uncertainty for megacities.

Open Access
Article
Publication date: 1 December 2023

Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…

Abstract

Purpose

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.

Design/methodology/approach

A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.

Findings

The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.

Originality/value

This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 17 April 2024

Hazwani Shafei, Rahimi A. Rahman, Yong Siang Lee and Che Khairil Izam Che Ibrahim

Amid rapid technological progress, the construction industry is embracing Construction 4.0, redefining work practices through emerging technologies. However, the implications of…

Abstract

Purpose

Amid rapid technological progress, the construction industry is embracing Construction 4.0, redefining work practices through emerging technologies. However, the implications of Construction 4.0 technologies to enhancing well-being are still poorly understood. Particularly, the challenge lies in selecting technologies that critically contribute to well-being enhancement. Therefore, this study aims to evaluate the implications of Construction 4.0 technologies to enhancing well-being.

Design/methodology/approach

A list of Construction 4.0 technologies was identified from a national strategic plan on Construction 4.0, using Malaysia as a case study. Fourteen construction industry experts were selected to evaluate the implications of Construction 4.0 technologies on well-being using fuzzy Technique for Order Preference by Similarity to Ideal Solution (TOPSIS). The expert judgment was measured using linguistic variables that were transformed into fuzzy values. Then, the collected data was analyzed using the following analyses: fuzzy TOPSIS, Pareto, normalization, sensitivity, ranking performance and correlation.

Findings

Six Construction 4.0 technologies are critical to enhancing well-being: cloud & real-time collaboration, big data & predictive analytics, Internet of Things, building information modeling, autonomous construction and augmented reality & virtualization. In addition, artificial intelligence and advanced building materials are recommended to be implemented simultaneously as a very strong correlation exists between them.

Originality/value

The novelty of this study lies in a comprehensive understanding of the implications of Construction 4.0 technologies to enhancing well-being. The findings can assist researchers, industry practitioners and policymakers in making well-informed decisions to select Construction 4.0 technologies when targeting the enhancement of the overall well-being of the local construction industry.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 73