Search results
1 – 10 of 559Ram Asra Khural, Shashi, Myriam Ertz and Roberto Cerchione
This study explores the relationships among sustainability implementation barriers (resource, managerial and regulatory barriers), sustainability practices (sustainable…
Abstract
Purpose
This study explores the relationships among sustainability implementation barriers (resource, managerial and regulatory barriers), sustainability practices (sustainable construction materials, sustainable construction design, modern construction methods and environmental provisions and reporting) and sustainability performance (environmental, economic and social) in hill road construction (HRC).
Design/methodology/approach
Primary data were collected from the 313 HRC practitioners with the help of a questionnaire, and research hypotheses were tested employing structural equation modeling.
Findings
The findings reveal a mixed effect of sustainability implementation barriers. Resource (managerial) barriers are negatively related to all practices except environmental provisions and reporting (sustainable construction materials), while regulatory barriers only negatively impact modern construction methods. On the other hand, all sustainability practices positively impact environmental performance, whereas economic (social) performance is positively influenced by all practices, except environmental provisions and reporting (modern construction methods), and positively affects economic performance.
Originality/value
In order to transform HRC toward sustainability, the barriers to sustainability implementation, sustainability practices and performance need to be understood by practitioners; however, the relationships have not previously been empirically assessed in extant literature. Besides, past research appears to be predominantly focused on the environmental aspect, thereby neglecting economic and social aspects. This study is a modest attempt to bridge these research gaps.
Details
Keywords
Ali M. Saad, Mohammed Dulaimi, Suhaib Arogundade, Sambo Lyson Zulu and Chris Gorse
The recent failures and insolvencies of organisations related to the modern methods of construction (MMC) have gained increased attention and controversy across the UK…
Abstract
Purpose
The recent failures and insolvencies of organisations related to the modern methods of construction (MMC) have gained increased attention and controversy across the UK construction sector. Such failures are linked to their inability to achieve an economy of scale and drive key clients to accept the MMC as an alternative to traditional methods. This paper aims to unravel whether a phenomenon of “innovation negativism” has manifested and is contributing to public clients' indecision towards broader MMC, whether this is only linked to past negative experiences formed after the Second World War or whether additional contributing reasons exist to influence adoption.
Design/methodology/approach
This study focusses on exploring the decision-making of the UK public construction sector; therefore, this paper adopts a qualitative approach, utilising interviews with 14 carefully selected MMC experts, government advisors and public clients. The phenomenological stance adopted herewith enables the authors to make better sense of the perceptions of the interviewees, leading to the conceptualisation of the innovation negativism phenomenon.
Findings
The paper identifies nine themes that may be argued to promote a profound understanding of the MMC negativism influencing public clients' decision-making. The study has found that more than just the previous negative perceptions formulated post Second World War are driving innovation negativism in the UK public sector. Notably, the emerging themes are incomprehension, lacking evidence, communication, relationship history, bad experiences, uncertainty, inadequate experimentation, the business case and localism.
Originality/value
This study is the first construction management research that acts as a fair departure point to conceptualise the reasoning behind innovation negativism in the construction setting. Through mirroring demand's unipolarity for traditional methods, policy and decision-makers can now rely on the conceptualised reasoning to determine practical solutions to overcome clients' indecisions towards MMC.
Details
Keywords
Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, J. Jorge Ochoa and Aparna Samaraweera
Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities…
Abstract
Purpose
Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities around its supply chain. Hence, the purpose of this study is twofold: to identify the OC project delivery models, the limitations in their procurement approach to facilitate the resilience of the supply chain and interventions to promote supply chain resilience (SCR) and to identify the gaps in the existing procurement process and propose further research areas that implement strategies to improve SCR.
Design/methodology/approach
The study was conducted as a systematic literature review. In total, 41 peer-reviewed research papers published between 2013 and 2023 were shortlisted through the preferred reporting items for systematic reviews and meta-analysis guidelines. A descriptive analysis was conducted, followed by a thematic analysis.
Findings
The descriptive analysis reveals that the emphasis on digitising OC has shifted to transforming the business model, procurement and supply chain with a human-centric view. In thematic analysis, the predictability of the SC partners and the probabilities of evaluating the prospects are revealed as arbitrary characteristics in the current procurement strategies. Rewarding collaborative relationships among SC partners and incorporating provisions to postpone the module delivery are some interventions to promote flexibility. Drafting comprehensive and effective contracts that address transparency issues and facilitating the need for continuous development of capabilities through procurement are among the further research avenues proposed.
Originality/value
This study is a precursor demonstrating the potential of the procurement process to implement the decrees of SCR for better goal congruence of the OC supply chain.
Details
Keywords
Buddhini Ginigaddara, Srinath Perera, Yingbin Feng, Payam Rahnamayiezekavat and Mike Kagioglou
Industry 4.0 is exacerbating the need for offsite construction (OSC) adoption, and this rapid transformation is pushing the boundaries of construction skills towards extensive…
Abstract
Purpose
Industry 4.0 is exacerbating the need for offsite construction (OSC) adoption, and this rapid transformation is pushing the boundaries of construction skills towards extensive modernisation. The adoption of this modern production strategy by the construction industry would redefine the position of OSC. This study aims to examine whether the existing skills are capable of satisfying the needs of different OSC types.
Design/methodology/approach
A critical literature review evaluated the impact of transformative technology on OSC skills. An existing industry standard OSC skill classification was used as the basis to develop a master list that recognises emerging and diminishing OSC skills. The master list recognises 67 OSC skills under six skill categories: managers, professionals, technicians and trade workers, clerical and administrative workers, machinery operators and drivers and labourers. The skills data was extracted from a series of 13 case studies using document reviews and semi-structured interviews with project stakeholders.
Findings
The multiple case study evaluation recognised 13 redundant skills and 16 emerging OSC skills such as architects with building information modelling and design for manufacture and assembly knowledge, architects specialised in design and logistics integration, advanced OSC technical skills, factory operators, OSC estimators, technicians for three dimensional visualisation and computer numeric control operators. Interview findings assessed the current state and future directions for OSC skills development. Findings indicate that the prevailing skills are not adequate to readily relocate construction activities from onsite to offsite.
Originality/value
To the best of the authors’ knowledge, this research is one of the first studies that recognises the major differences in skill requirements for non-volumetric and volumetric OSC types.
Details
Keywords
Lars Stehn and Alexander Jimenez
The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…
Abstract
Purpose
The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.
Design/methodology/approach
Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.
Findings
According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.
Originality/value
Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.
Details
Keywords
Ayman Ahmed Ezzat Othman and Yomna Abdelghany El-Saeidy
The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design…
Abstract
Purpose
The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design process.
Design/methodology/approach
A research methodology consists of literature review, case studies and survey questionnaire was designed to achieve the abovementioned aim. First, the literature review was used to investigate CW, CW generated during the design process, the design process and ESI. Second, two construction projects were analysed to investigate the role of ESI towards reducing CW generated during the design waste. Third, a survey questionnaire was carried out with a representative sample of architectural design firms (ADFs) in Egypt to examine their perception and application of ESI towards reducing CW generated during the design process. Based on the results of the above, the research developed a framework to facilitate ESI during the design process to reduce CW.
Findings
Through literature review, the research highlighted the causes of CW generated during the design process and identified the benefits and challenges that encounter ESI in ADFs. Results of data analysis showed that “last-minute changes due to client requirements” was ranked the highest challenges of ESI in ADFs in Egypt followed by “lack of design experience”. Moreover, “providing technical information about materials and equipment and their capabilities” was ranked by respondents as the highest contributions of suppliers during the design process which leads to waste reduction followed by “better estimation of materials and costs”. Finally, respondents stated that “resistance of ADFs to include suppliers in the design phase” was ranked the highest challenge of ESI in the design process followed by “no clear guidelines or policies that organise ESI”.
Research limitations/implications
Because of the conceptual nature of the proposed framework, it has to be tested and validated to ensure its capability to overcome the challenges of ESI as an approach for reducing CW generated during the design process.
Practical implications
This research presents a practical solution to the problem of CW generated during the design process through ESI.
Originality/value
The research discussed the causes of CW originated from the design process and the benefits and challenges of ESI in ADFs. It investigated the perception and application of ESI in ADFs in Egypt. The proposed framework which was designed to facilitate the integration of suppliers in the early stages of the project life cycle represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.
Details
Keywords
Onaopepo Adeniyi, Niraj Thurairajah and Feyisetan Leo-Olagbaye
Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction…
Abstract
Purpose
Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction industries. This development calls for a reappraisal of organisations’ strength in capabilities required for BIM uptake towards the target of global construction digitalisation. This study aims to assess the BIM Level 2 uptake capability of organisations in a BIM infant construction industry and identify the underlying interactions between the capability criteria.
Design/methodology/approach
The study used a multivariable analysis of fifteen descriptors identified from the people, process, policy, finance and technology domain. Data collection was done in the BIM infant construction industry in Nigeria. Verification of the descriptors and an evaluation of BIM uptake capability in organisations was done. Seventy-three responses were received within the selected context, and data analysis was done with mean weighting and exploratory factor analysis. Maximum Likelihood extraction and Direct Oblimin rotation were used.
Findings
Factor analysis revealed three factors that explained 53.28% of the total variance in the BIM Level 2 uptake capability of construction organisations. The factors are workforce capacity and continuous development, an affinity for innovation and strength in physical and operational facilities.
Research limitations/implications
This study provides an overarching and insightful discussion on BIM uptake capability and construction digitalisation with evidence from a BIM-infant construction industry.
Practical implications
The findings of this study are a piece of valuable empirical evidence on Level 2 BIM uptake capability. This empirical situation analysis will inform the advocacy for the advancement of BIM and enhanced utilisation of building information. Evidence on the capability performance of the BIM infant industry has been revealed.
Originality/value
The outcome is expected to stir debate on the preparedness of organisations to further exploit the benefits of BIM in the BIM infant construction industry. Examination of the capability for a particular phase of BIM is scanty in the literature.
Details
Keywords
Douglas Aghimien, Clinton Aigbavboa, Ayodeji Emmanuel Oke and John Aliu
Digitalisation, which involves the use of digital technologies in transforming an organisation’s activities, transcends just the acquiring of emerging digital tools. Having the…
Abstract
Purpose
Digitalisation, which involves the use of digital technologies in transforming an organisation’s activities, transcends just the acquiring of emerging digital tools. Having the right people to drive the implementation of these technologies and attaining strategic organisational goals is essential. While most studies have focused on the use of emerging technologies in the construction industry, less attention has been given to the ‘people’ dimension. Therefore, this study aims to assess the people-related features needed for construction digitalisation.
Design/methodology/approach
The study adopted pragmatic thinking using a mixed-method approach. A Delphi was used to achieve the qualitative aspect of the research, while a questionnaire survey conducted among 222 construction professionals was used to achieve the quantitative aspect. The data gathered were analysed using frequency, percentage, mean item score, Kruskal–Wallis H test, exploratory factor analysis and confirmatory factor analysis.
Findings
Based on acceptable reliability, validity and model fit indices, the study found that the people-related factors needed for construction digitalisation can be grouped into technical capability of personnel, attracting and retaining digital talent and organisation’s digital culture.
Practical implications
The findings offer valuable benefits to construction organisations as understanding these identified people features can help lead to better deployment of digital tools and the attainment of the digital transformation.
Originality/value
This study attempts to fill the gap in the shortage of literature exploring the people dimension of construction digitalisation. The study offers an excellent theoretical backdrop for future works on digital talent for construction digitalisation, which has gained less attention in the current construction digitalisation discourse.
Details
Keywords
Qianmai Luo, Chengshuang Sun, Ying Li, Zhenqiang Qi and Guozong Zhang
With increasing complexity of construction projects and new construction processes and methods are adopted, more safety hazards are emerging at construction sites, requiring the…
Abstract
Purpose
With increasing complexity of construction projects and new construction processes and methods are adopted, more safety hazards are emerging at construction sites, requiring the application of the modern risk management methods. As an emerging technology, digital twin has already made valuable contributions to safety risk management in many fields. Therefore, exploring the application of digital twin technology in construction safety risk management is of great significance. The purpose of this study is to explore the current research status and application potential of digital twin technology in construction safety risk management.
Design/methodology/approach
This study followed a four-stage literature processing approach as outlined in the systematic literature review procedure guidelines. It then combined the quantitative analysis tools and qualitative analysis methods to organize and summarize the current research status of digital twin technology in the field of construction safety risk management, analyze the application of digital twin technology in construction safety risk management and identify future research trends.
Findings
The research findings indicate that the application of digital twin technology in the field of construction safety risk management is still in its early stages. Based on the results of the literature analysis, this paper summarizes five aspects of digital twin technology's application in construction safety risk management: real-time monitoring and early warning, safety risk prediction and assessment, accident simulation and emergency response, safety risk management decision support and safety training and education. It also proposes future research trends based on the current research challenges.
Originality/value
This study provides valuable references for the extended application of digital twin technology and offers a new perspective and approach for modern construction safety risk management. It contributes to the enhancement of the theoretical framework for construction safety risk management and the improvement of on-site construction safety.
Details
Keywords
Babar Ali, Ajibade A. Aibinu and Vidal Paton-Cole
Delay and disruption claims involve a complex process that often result in disputes, unnecessary expenses and time loss on construction projects. This study aims to review and…
Abstract
Purpose
Delay and disruption claims involve a complex process that often result in disputes, unnecessary expenses and time loss on construction projects. This study aims to review and synthesize the contributions of previous research undertaken in this area and propose future directions for improving the process of delay and disruption claims.
Design/methodology/approach
This study adopted a holistic systematic review of literature following Preferred Reporting Items for Systematic Reviews and Meta-Analysis guidelines. A total of 230 articles were shortlisted related to delay and disruption claims in construction using Scopus and Web of Science databases.
Findings
Six research themes were identified and critically reviewed including delay analysis, disruption analysis, claim management, contract administration, dispute resolution and delay and disruption information and records. The systematic review showed that there is a dearth of research on managing the wide-ranging information required for delay and disruption claims, ensuring the transparency and uniformity in delay and disruption claims’ information and adopting an end-user’s centred research approach for resolving the problems in the process of delay and disruption claims.
Practical implications
Complexities in delay and disruption claims are real-world problems faced by industry practitioners. The findings will help the research community and industry practitioners to prioritize their energies toward information management of delay and disruption claims.
Originality/value
This study contributes to the body of knowledge in delay and disruption claims by identifying the need for conducting more research on its information requirements and management. Subsequently, it provides an insight on the use of modern technologies such as drones, building information modeling, radio frequency identifiers, blockchain, Bigdata and machine learning, as tools for more structured and efficient attainment of required information in a transparent and consistent manner. It also recommends greater use of design science research approach for delay and disruption claims. This will help to ensure delay and disruption claims are the least complex and less dispute-prone process.
Details