Search results

1 – 10 of over 19000
Article
Publication date: 17 May 2022

Massicilia Dahmani, Abdelghani Seghir, Nabil Issaadi and Ouali Amiri

This study aims to propose a numerical modeling procedure for response analysis of elastic body floating in water and submitted to regular waves. An equivalent simplified…

Abstract

Purpose

This study aims to propose a numerical modeling procedure for response analysis of elastic body floating in water and submitted to regular waves. An equivalent simplified mechanical single-degree-of-freedom system allowing to reproduce the heave movements is first developed, then the obtained lumped characteristics are used for elastic analysis of the floating body in heave motion.

Design/methodology/approach

First, a two-dimensional numerical model of a rigid floating body in a wave tank is implemented under DualSPHysics, an open source computational fluid dynamics (CFD) code based on smoothed particle hydrodynamics method. Then, the obtained results are exploited to derive an equivalent mechanical mass-spring-damper model. Finally, estimated equivalent characteristics are used in a structural finite element modeling of the considered body assuming elastic behavior.

Findings

Obtained results concerning the floating body displacements are represented and validated using existing experimental data in the literature. Wave forces acting on the body are also evaluated. It was found that for regular waves, it is possible to replace the complex CFD refined model by an equivalent simplified mechanical system which makes easy the use of structural finite element analysis.

Originality/value

The originality of this work lies in the proposed procedure to evaluate the mechanical properties of the equivalent elastic system. This allows to couple two different software tools and to take advantages of their features.

Details

World Journal of Engineering, vol. 20 no. 5
Type: Research Article
ISSN: 1708-5284

Keywords

Article
Publication date: 5 June 2023

Abdullah Ehtesham Akbar and Mohammad A. Hassanain

This paper aims to present a systematic review of the published literature on building information model (BIM)-based simulation tools used for occupant evacuation over the past…

Abstract

Purpose

This paper aims to present a systematic review of the published literature on building information model (BIM)-based simulation tools used for occupant evacuation over the past 23 years.

Design/methodology/approach

A literature review was conducted on BIM-based simulation tools used for occupant evacuation over the past 23 years. The search identified a total of 37 relevant papers, which were reviewed. The paper describes the use of BIM-based simulation tools over the years and identifies the research gaps.

Findings

BIM-based simulation tools have undergone progressive development, with constant improvements through the integration of advanced tools and collection of more data. These tools can assist in identifying faults in the building design. The outcomes of the simulation were not entirely accurate, as real-life scenarios vary depending on the various building types and the behavior of their occupants.

Research limitations/implications

This study contributes to the literature through reviewing the capabilities of BIM-based simulation tools and the different simulation methods along with their limitations.

Practical implications

Fire safety engineers and architects can comprehend the utilization of BIM-based simulation tools to enhance the fire evacuation in light of their shortcomings and flaws.

Originality/value

BIM-based simulation tools are becoming more advanced and widely used. There has not been a comprehensive evaluation of the capabilities of the integration of BIM tools and simulation modeling for occupant evacuation. This study guides researchers on the capabilities and efficiencies of integrated solutions for occupant evacuations and their inherent shortcomings. The study identifies future research areas in BIM-based tools for occupant evacuation.

Details

Facilities , vol. 41 no. 9/10
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 23 August 2022

Mohammad Nafe Assafi, Md. Mehrab Hossain, Nicholas Chileshe and Shuvo Dip Datta

As a developing nation, Bangladesh still has scarce technological applications in the construction sector, which results in construction delays. This paper aims to propose a…

Abstract

Purpose

As a developing nation, Bangladesh still has scarce technological applications in the construction sector, which results in construction delays. This paper aims to propose a framework that will diminish manual labor, reduce human error and apply four-dimensional (4D) building information modeling (BIM)-based solutions to mitigate and prevent construction project delays.

Design/methodology/approach

First, a systematic literature review was conducted on analyzing the construction delay scenario in the context of Bangladesh and other countries. Next, a 4D BIM-based framework was developed using Autodesk Navisworks Manage. Finally, it was used to run on-site simulations on an ongoing construction project which faced delays because of design errors and inefficient planning.

Findings

Affirmative results were found from applying these methods through real-time project simulation. The current status of the project and the status after using BIM technology were compared. It was observed that during both the preconstruction and execution phases, the application of 4D BIM could reduce the delay posed by design error and inefficient planning.

Practical implications

The project manager and the design engineers can use these frameworks to review their projects. For the design engineers, the preconstruction phase portion of the framework will help identify the probable errors in the design. For the project managers, keeping track of time using the execution phase portion of the framework will be resourceful.

Originality/value

To the best of the authors’ knowledge, this study is the first to assess the significant delay factors endemic in Bangladesh and develop a BIM-based technological solution. This study is solely dedicated to reforming the construction techniques in Bangladesh through the application of 4D BIM technology.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 25 July 2023

Priyanka Thakral, Praveen Ranjan Srivastava, Sanket Sunand Dash, Sajjad M. Jasimuddin and Zuopeng (Justin) Zhang

The growth of the global labor force and business analytics has significantly impacted human resource management (HRM). Human resource (HR) analytics is an emerging field that…

Abstract

Purpose

The growth of the global labor force and business analytics has significantly impacted human resource management (HRM). Human resource (HR) analytics is an emerging field that creates value for employees and organizations. By examining the existing studies on HR analytics, the paper systematically reviews the literature to identify active research areas and establish a roadmap for future studies in HR analytics.

Design/methodology/approach

A portfolio of 503 articles collected from the Scopus database was reviewed. The study has adopted a Latent Dirichlet allocation (LDA) topic modeling approach to identify significant themes in the literature.

Findings

The HR analytics research domain is classified into four categories: HR functions, statistical techniques, organizational outcomes and employee characteristics. The study has also developed a framework for organizations adopting HR analytics. Linking HR with blockchain technology, explainable artificial intelligence and Metaverse are the areas identified for future researchers.

Practical implications

The framework will assist practitioners in identifying statistical techniques for optimizing various HR functions. The paper discovers that by implementing HR analytics, HR managers and business partners can run reports, make dashboards and visualizations and make evidence-based decision-making.

Originality/value

The previous studies have not applied any machine learning techniques to identify the topics in the extant literature. The paper has applied machine learning tools, making the review more robust and providing an exhaustive understanding of the domain.

Details

Management Decision, vol. 61 no. 12
Type: Research Article
ISSN: 0025-1747

Keywords

Open Access
Article
Publication date: 3 August 2020

Djordje Cica, Branislav Sredanovic, Sasa Tesic and Davorin Kramar

Sustainable manufacturing is one of the most important and most challenging issues in present industrial scenario. With the intention of diminish negative effects associated with…

2094

Abstract

Sustainable manufacturing is one of the most important and most challenging issues in present industrial scenario. With the intention of diminish negative effects associated with cutting fluids, the machining industries are continuously developing technologies and systems for cooling/lubricating of the cutting zone while maintaining machining efficiency. In the present study, three regression based machine learning techniques, namely, polynomial regression (PR), support vector regression (SVR) and Gaussian process regression (GPR) were developed to predict machining force, cutting power and cutting pressure in the turning of AISI 1045. In the development of predictive models, machining parameters of cutting speed, depth of cut and feed rate were considered as control factors. Since cooling/lubricating techniques significantly affects the machining performance, prediction model development of quality characteristics was performed under minimum quantity lubrication (MQL) and high-pressure coolant (HPC) cutting conditions. The prediction accuracy of developed models was evaluated by statistical error analyzing methods. Results of regressions based machine learning techniques were also compared with probably one of the most frequently used machine learning method, namely artificial neural networks (ANN). Finally, a metaheuristic approach based on a neural network algorithm was utilized to perform an efficient multi-objective optimization of process parameters for both cutting environment.

Details

Applied Computing and Informatics, vol. 20 no. 1/2
Type: Research Article
ISSN: 2634-1964

Keywords

Article
Publication date: 23 October 2023

Kathrin Kirchner, Ralf Laue, Kasper Edwards and Birger Lantow

Medical diagnosis and treatment processes exhibit a high degree of variability, as during the process execution, healthcare professionals can decide on additional steps, change…

Abstract

Purpose

Medical diagnosis and treatment processes exhibit a high degree of variability, as during the process execution, healthcare professionals can decide on additional steps, change the execution order or skip a task. Process models can help to document and to discuss such processes. However, depicting variability in graphical process models using standardized languages, such as Business Process Model and Notation (BPMN), can lead to large and complicated diagrams that medical staff who do not have formal training in modeling languages have difficulty understanding. This study proposes a pattern-based process visualization that medical doctors can understand without extensive training. The process descriptions using this pattern-based visualization can later be transformed into formal business process models in languages such as BPMN.

Design/methodology/approach

The authors derived patterns for expressing variability in healthcare processes from the literature and medical guidelines. Then, the authors evaluated and revised these patterns based on interviews with physicians in a Danish hospital.

Findings

A set of business process variability patterns was proposed to express situations with variability in hospital treatment and diagnosis processes. The interviewed medical doctors could translate the patterns into their daily work practice, and the patterns were used to model a hospital process.

Practical implications

When communicating with medical personnel, the patterns can be used as building blocks for documenting and discussing variable processes.

Originality/value

The patterns can reduce complexity in process visualization. This study provides the first validation of these patterns in a hospital.

Details

Business Process Management Journal, vol. 30 no. 1
Type: Research Article
ISSN: 1463-7154

Keywords

Article
Publication date: 6 February 2023

Nofirman Firdaus, Hasnida Ab-Samat and Bambang Teguh Prasetyo

This paper reviews the literature on maintenance strategies for energy efficiency as a potential maintenance approach. The purpose of this paper is to identify the main concept…

Abstract

Purpose

This paper reviews the literature on maintenance strategies for energy efficiency as a potential maintenance approach. The purpose of this paper is to identify the main concept and common principle for each maintenance strategy for energy efficiency.

Design/methodology/approach

A literature review has been carried out on maintenance and energy efficiency. The paper systematically classified the literature into three maintenance strategies (e.g. inspection-based maintenance [IBM], time-based maintenance [TBM] and condition-based maintenance [CBM]). The concept and principle of each maintenance strategy are identified, compared and discussed.

Findings

Each maintenance strategy's main concept and principle are identified based on the following criteria: data required and collection, data analysis/modeling and decision-making. IBM relies on human senses and common senses to detect energy faults. Any detected energy losses are quantified to energy cost. A payback period analysis is commonly used to justify corrective actions. On the other hand, CBM monitors relevant parameters that indicate energy performance indicators (EnPIs). Data analysis or deterioration modeling is needed to identify energy degradation. For the diagnostics approach, the energy degradation is compared with the threshold to justify corrective maintenance. The prognostics approach estimates when energy degradation reaches its threshold; therefore, proper maintenance tasks can be planned. On the other hand, TBM uses historical data from energy monitoring. Data analysis or deterioration modeling is required to identify degradation. Further analysis is performed to find the optimal time to perform a maintenance task. The comparison between housekeeping, IBM and CBM is also discussed and presented.

Practical implications

The literature on the classification of maintenance strategies for energy efficiency has been limited. On the other hand, the ISO 50001 energy management systems standard shows the importance of maintenance for energy efficiency (MFEE). Therefore, to bridge the gap between research and industry, the proposed concept and principle of maintenance strategies will be helpful for practitioners to apply maintenance strategies as energy conservation measures in implementing ISO 50001 standard.

Originality/value

The novelty of this paper is in-depth discussion on the concept and principle of each maintenance strategy (e.g. housekeeping or IBM, TBM and CBM) for energy efficiency. The relevant literature for each maintenance strategy was also summarized. In addition, basic rules for maintenance strategy selection are also proposed.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 3
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 17 November 2022

Asli Pelin Gurgun, Kerim Koc and Handan Kunkcu

Completing construction projects within the planned schedule has widely been considered as one of the major project success factors. This study investigates the use of…

1033

Abstract

Purpose

Completing construction projects within the planned schedule has widely been considered as one of the major project success factors. This study investigates the use of technologies to address delays in construction projects and aims to address three research questions (1) to identify the adopted technologies and proposed solutions in the literature, (2) to explore the reasons why the delays cannot be prevented despite disruptive technologies and (3) to determine the major strategies to prevent delays in construction projects.

Design/methodology/approach

In total, 208 research articles that used innovative technologies, methods, or tools to avoid delays in construction projects were investigated by conducting a comprehensive literature review. An elaborative content analysis was performed to cover the implemented technologies and their transformation, highlighted research fields in relation to selected technologies, focused delay causes and corresponding delay mitigation strategies and emphasized project types with specific delay causes. According to the analysis results, a typological framework with appropriate technological means was proposed.

Findings

The findings revealed that several tools such as planning, imaging, geo-spatial data collection, machine learning and optimization have widely been adopted to address specific delay causes. It was also observed that strategies to address various delay causes throughout the life cycle of construction projects have been overlooked in the literature. The findings of the present research underpin the trends and technological advances to address significant delay causes.

Originality/value

Despite the technological advancements in the digitalization era of Industry 4.0, many construction projects still suffer from poor schedule performance. However, the reason of this is questionable and has not been investigated thoroughly.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 May 2023

Meysam Soltaninejad, Esmatullah Noorzai and Amir Faraji

This research aims to provide optimization and route safety planning employing the fuzzy Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) technique.

Abstract

Purpose

This research aims to provide optimization and route safety planning employing the fuzzy Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) technique.

Design/methodology/approach

This research combines the use of graphical, communication tools and simulated models based on building information modeling (BIM) technology and agent-based modeling (ABM) to identify a safe evacuation route. Adopting the multi-criteria decision-making (MCDM) approach, the proposed rescue plan can reduce potential hazards along the evacuation route by selecting a safe route for evacuating residents and entering firefighters to the scene of the incident.

Findings

The results show that the use of simulated models along with MCDM methods in the selection of safe routes improves the performance of safe evacuation operations for both relief groups and residents.

Practical implications

The introduced model can improve the performance management of different groups at the time of the incident and reduce casualties and property losses using the information received from sensors at the scene. Moreover, the proposed rescue plan prevents group and individual reactivation at the time of the incident.

Originality/value

Despite many advances in the architecture, engineering and construction (AEC) industry, the number of victims of fire incidents in buildings is increasing compared to other natural disasters. Improving decision management based on effective parameters at the time of incident reduces casualties of residents and rescue workers.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 2 June 2023

Lina Gozali, Teuku Yuri M. Zagloel, Togar Mangihut Simatupang, Wahyudi Sutopo, Aldy Gunawan, Yun-Chia Liang, Bernardo Nugroho Yahya, Jose Arturo Garza-Reyes, Agustinus Purna Irawan and Yuliani Suseno

This research studies the development of the evolving dynamic system model and explores the important elements or factors and what detailed attributes are the main influences…

Abstract

Purpose

This research studies the development of the evolving dynamic system model and explores the important elements or factors and what detailed attributes are the main influences model in achieving the success of a business, industry and management. It also identifies the real and major differences between static and dynamic business management models and the detailed factors that influence them. Later, this research investigates the benefits/advantages and limitations/disadvantages of some research studies. The studies conducted in this research put more emphasis on the capabilities of system dynamics (SD) in modeling and the ability to measure, analyse and capture problems in business, industry, manufacturing etc.

Design/methodology/approach

The research presented in this work is a qualitative research based on a literature review. Publicly available research publications and reports have been used to create a research foundation, identify the research gaps and develop new analyses from the comparative studies. As the literature review progressed, the scope of the literature search was further narrowed down to the development of SD models. Often, references to certain selected literature have been examined to find other relevant literature. To do so, a supporting tool (that connects related articles) provided by Google Scholar, Scopus, and particular journals has been used.

Findings

The dynamic business and management model is very different from the static business model in complexity, formality, flexibility, capturing, relationships, advantages, innovation model, new goals, updated information, perspective and problem-solving abilities. The initial approach of a static system was applied in the canvas business model, but further developments can be continued with a dynamic system approach.

Research limitations/implications

Based on this study, which shows that businesses are developing more towards digitalisation, wanting the ability to keep up with the era that is moving so fast and the desire to increase profits, an instrument is needed that can help describe the difficulties of the needs and developments of the future world. This instrument, or tool of SD, is also expected to assist in drawing future models and in building a business with complex variables that can be predicted from the beginning.

Practical implications

This study will contribute to the SD study for many business incubator research studies. Many practical in business incubator management to have a benefit how to achieve the business performance management (BPM) in SD review.

Originality/value

The significant differences between static and dynamics to be used for business research and strategic performance management. This comparative study analyses some SD models from many authors worldwide. Their goals behind their strategic business models and encounter for their respective progress.

1 – 10 of over 19000