1 – 2 of 2Libiao Bai, Xiaoyan Xie, Yichen Sun, Xue Qu and Xiao Han
Assessing project criticality in a project portfolio (PP) is of great practical significance to improve robustness from damage. While project criticality assessment has increased…
Abstract
Purpose
Assessing project criticality in a project portfolio (PP) is of great practical significance to improve robustness from damage. While project criticality assessment has increased diversity in approaches, the understanding of vulnerable project impacts is still limited. To promote a better understanding of assessing project criticality, a vulnerability measurement model is constructed.
Design/methodology/approach
First, integrating the tasks, projects and corresponding relationships among them, a project portfolio network (PPN) is constructed. Second, the project's vulnerability is measured by combining the topological structure and functional attributes. Third, project criticality is assessed by the vulnerability measurement results. Lastly, the proposed model is applied in a numerical example to illustrate its suitability and effectiveness.
Findings
For academia, this study provides a novel perspective on project vulnerability measurement and expands project criticality assessment tools. For practitioners, the straightforward model provides an effective tool for assessing project criticality and contributes to enhancing project portfolio management (PPM).
Originality/value
The impact of the task on the project is considered in this study. Topological structure and functional attributes are also integrated for measuring project vulnerability due to the impact of random attacks in an uncertain environment, providing a new perspective on the requirements of project criticality assessment and the measurement of project vulnerability.
Details
Keywords
Elena Stefana, Paola Cocca, Federico Fantori, Filippo Marciano and Alessandro Marini
This paper aims to overcome the inability of both comparing loss costs and accounting for production resource losses of Overall Equipment Effectiveness (OEE)-related approaches.
Abstract
Purpose
This paper aims to overcome the inability of both comparing loss costs and accounting for production resource losses of Overall Equipment Effectiveness (OEE)-related approaches.
Design/methodology/approach
The authors conducted a literature review about the studies focusing on approaches combining OEE with monetary units and/or resource issues. The authors developed an approach based on Overall Equipment Cost Loss (OECL), introducing a component for the production resource consumption of a machine. A real case study about a smart multicenter three-spindle machine is used to test the applicability of the approach.
Findings
The paper proposes Resource Overall Equipment Cost Loss (ROECL), i.e. a new KPI expressed in monetary units that represents the total cost of losses (including production resource ones) caused by inefficiencies and deviations of the machine or equipment from its optimal operating status occurring over a specific time period. ROECL enables to quantify the variation of the product cost occurring when a machine or equipment changes its health status and to determine the actual product cost for a given production order. In the analysed case study, the most critical production orders showed an actual production cost about 60% higher than the minimal cost possible under the most efficient operating conditions.
Originality/value
The proposed approach may support both production and cost accounting managers during the identification of areas requiring attention and representing opportunities for improvement in terms of availability, performance, quality, and resource losses.