Search results

1 – 10 of over 10000
Article
Publication date: 26 August 2022

Jingqi Zhang, Hui Zhao and Ziliang Guo

This paper improves the evaluation index system of green building operation effect and establishes the evaluation model of green building operation effect. It is expected to…

Abstract

Purpose

This paper improves the evaluation index system of green building operation effect and establishes the evaluation model of green building operation effect. It is expected to promote energy saving and emission reduction and provide a more scientific evaluation method for green building operation effect evaluation.

Design/methodology/approach

First, 20 key evaluation indexes are selected to establish the operation effective evaluation index system. Then, the combined weight method is proposed to determine the weight of each evaluation index. Next, the gray clustering-fuzzy comprehensive evaluation method is used to construct the green building operation effective evaluation model. Finally, the feasibility and validity of the selected model were verified by taking Shenzhen Bay One green building in Shenzhen as an example.

Findings

This paper establishes the evaluation system of green building operational effect, and evaluates green building from the angle of operational effect. Taking Shenzhen Bay One project as an example, the rationality and applicability of the model are verified.

Originality/value

In this paper, for the first time, relevant indexes of user experience are included in the evaluation system of green building operational effect, which makes the evaluation system more perfect. In addition, a more scientific fuzzy gray clustering method is used to evaluate the operational effect of green building, and a new evaluation model is established.

Details

Kybernetes, vol. 52 no. 12
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 13 December 2022

Zhenhua Luo, Juntao Guo, Jianqiang Han and Yuhong Wang

Prefabricated technology is gradually being applied to the construction of subway stations due to its characteristic of mechanization. However, the prefabricated subway station in…

Abstract

Purpose

Prefabricated technology is gradually being applied to the construction of subway stations due to its characteristic of mechanization. However, the prefabricated subway station in China is in the initial stage of development, which is prone to construction safety issues. This study aims to evaluate the construction safety risks of prefabricated subway stations in China and formulate corresponding countermeasures to ensure construction safety.

Design/methodology/approach

A construction safety risk evaluation index system for the prefabricated subway station was established through literature research and the Delphi method. Furthermore, based on the structure entropy weight method, matter-element theory and evidence theory, a hybrid evaluation model is developed to evaluate the construction safety risks of prefabricated subway stations. The basic probability assignment (BPA) function is obtained using the matter-element theory, the index weight is calculated using the structure entropy weight method to modify the BPA function and the risk evaluation level is determined using the evidence theory. Finally, the reliability and applicability of the evaluation model are verified with a case study of a prefabricated subway station project in China.

Findings

The results indicate that the level of construction safety risks in the prefabricated subway station project is relatively low. Man risk, machine risk and method risk are the key factors affecting the overall risk of the project. The evaluation results of the first-level indexes are discussed, and targeted countermeasures are proposed. Therefore, management personnel can deeply understand the construction safety risks of prefabricated subway stations.

Originality/value

This research fills the research gap in the field of construction safety risk assessment of prefabricated subway stations. The methods for construction safety risk assessment are summarized to establish a reliable hybrid evaluation model, laying the foundation for future research. Moreover, the construction safety risk evaluation index system for prefabricated subway stations is proposed, which can be adopted to guide construction safety management.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 January 2024

Ning Chen, Zhenyu Zhang and An Chen

Consequence prediction is an emerging topic in safety management concerning the severity outcome of accidents. In practical applications, it is usually implemented through…

Abstract

Purpose

Consequence prediction is an emerging topic in safety management concerning the severity outcome of accidents. In practical applications, it is usually implemented through supervised learning methods; however, the evaluation of classification results remains a challenge. The previous studies mostly adopted simplex evaluation based on empirical and quantitative assessment strategies. This paper aims to shed new light on the comprehensive evaluation and comparison of diverse classification methods through visualization, clustering and ranking techniques.

Design/methodology/approach

An empirical study is conducted using 9 state-of-the-art classification methods on a real-world data set of 653 construction accidents in China for predicting the consequence with respect to 39 carefully featured factors and accident type. The proposed comprehensive evaluation enriches the interpretation of classification results from different perspectives. Furthermore, the critical factors leading to severe construction accidents are identified by analyzing the coefficients of a logistic regression model.

Findings

This paper identifies the critical factors that significantly influence the consequence of construction accidents, which include accident type (particularly collapse), improper accident reporting and handling (E21), inadequate supervision engineers (O41), no special safety department (O11), delayed or low-quality drawings (T11), unqualified contractor (C21), schedule pressure (C11), multi-level subcontracting (C22), lacking safety examination (S22), improper operation of mechanical equipment (R11) and improper construction procedure arrangement (T21). The prediction models and findings of critical factors help make safety intervention measures in a targeted way and enhance the experience of safety professionals in the construction industry.

Research limitations/implications

The empirical study using some well-known classification methods for forecasting the consequences of construction accidents provides some evidence for the comprehensive evaluation of multiple classifiers. These techniques can be used jointly with other evaluation approaches for a comprehensive understanding of the classification algorithms. Despite the limitation of specific methods used in the study, the presented methodology can be configured with other classification methods and performance metrics and even applied to other decision-making problems such as clustering.

Originality/value

This study sheds new light on the comprehensive comparison and evaluation of classification results through visualization, clustering and ranking techniques using an empirical study of consequence prediction of construction accidents. The relevance of construction accident type is discussed with the severity of accidents. The critical factors influencing the accident consequence are identified for the sake of taking prevention measures for risk reduction. The proposed method can be applied to other decision-making tasks where the evaluation is involved as an important component.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 2 April 2024

Minyan Wei, Juntao Zheng, Shouzhen Zeng and Yun Jin

The main aim of this paper is to establish a reasonable and scientific evaluation index system to assess the high quality and full employment (HQaFE).

25

Abstract

Purpose

The main aim of this paper is to establish a reasonable and scientific evaluation index system to assess the high quality and full employment (HQaFE).

Design/methodology/approach

This paper uses a novel Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) multi-criteria framework to evaluate the quality and quantity of employment, wherein the integrated weights of attributes are determined by the combined the Criteria Importance Through Inter-criteria Correlation (CRITIC) and entropy approaches.

Findings

Firstly, the gap in the Yangtze River Delta in employment quality is narrowing year by year; secondly, employment skills as well as employment supply and demand are the primary indicators that determine the HQaFE; finally, the evaluation scores are clearly hierarchical, in the order of Shanghai, Jiangsu, Zhejiang and Anhui.

Originality/value

A scientific and reasonable evaluation index system is constructed. A novel CRITIC-entropy-TOPSIS evaluation is proposed to make the results more objective. Some policy recommendations that can promote the achievement of HQaFE are proposed.

Details

International Journal of Intelligent Computing and Cybernetics, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1756-378X

Keywords

Article
Publication date: 28 November 2023

Huan Wang, Daao Wang, Peng Wang and Zhigeng Fang

The purpose of this research is to provide a theoretical framework for complex equipment quality risk evaluation. The primary aim of the framework is to enhance the ability to…

Abstract

Purpose

The purpose of this research is to provide a theoretical framework for complex equipment quality risk evaluation. The primary aim of the framework is to enhance the ability to identify risks and improve risk control efficiency during the development phase.

Design/methodology/approach

A novel framework for quality risk evaluation in complex equipment is proposed, which integrates probabilistic hesitant fuzzy set-quality function deployment (PHFS-QFD) and grey clustering. PHFS-QFD is applied to identify the quality risk factors, and grey clustering is used to evaluate quality risks in cases of poor quality information during the development stage. The unfolding function of QFD is applied to simplify complex evaluation problems.

Findings

The methodology presents an innovative approach to quality risk evaluation for complex equipment development. The case analysis demonstrates that this method can efficiently evaluate the quality risks for aircraft development and systematically trace back the risk factors through hierarchical relationships. In comparison to traditional failure mode and effects analysis methods for quality risk assessment, this approach exhibits superior effectiveness and reliability in managing quality risks for complex equipment development.

Originality/value

This study contributes to the field by introducing a novel theoretical framework that combines PHFS-QFD and grey clustering. The integration of these approaches significantly improves the quality risk evaluation process for complex equipment development, overcoming challenges related to data scarcity and simplifying the assessment of intricate systems.

Details

Grey Systems: Theory and Application, vol. 14 no. 1
Type: Research Article
ISSN: 2043-9377

Keywords

Article
Publication date: 22 April 2024

Arash Arianpoor and Ahmad Abdollahi

The purpose of this study is to propose a framework for the convergence of maturity model and education and evaluation in accounting.

Abstract

Purpose

The purpose of this study is to propose a framework for the convergence of maturity model and education and evaluation in accounting.

Design/methodology/approach

The present research was conducted in two phases. In the first phase, to determine the indicators of convergence of the maturity model and education and evaluation in accounting, a Meta-Synthesis method was used. The conceptual model includes two dimensions of “Teaching and learning processes” and “Evaluation methods"; five levels of initial, repeatable, defined, managed and optimized; and a total number of 35 indicators. In the second phase, a questionnaire was developed, and academics as accounting faculty members in Iranian public universities were employed to fill out the questionnaire electronically and present a final framework. Having received the questionnaires, 66 questionnaires were analyzed statistically.

Findings

The results showed that the two dimensions of “Teaching and learning processes” and “Evaluation methods” considering initial, repeatable, defined, managed and optimized levels include 35 indicators, which form a framework for the convergence of maturity model and education and evaluation in accounting. The results show that both dimensions have positive and significant regression path coefficients in the convergence model. Moreover, the dimension of teaching and learning processes has the highest regression path coefficient indicating a greater impact on the convergence model. Besides, all five levels have positive and significant regression path coefficients with dimensions. Finally, in this study, all indicators were prioritized according to five levels.

Originality/value

Due to the success of maturity models and the urgent developments that require transformative improvements in accounting education, maturity models can respond to the challenges associated with education and learning in accounting. Thus, conceiving an image of the convergence of maturity model, education and evaluation in accounting seems imperative which has been scarcely investigated previously.

Details

Accounting Research Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1030-9616

Keywords

Article
Publication date: 12 October 2023

Renqiang Xie

While providing users with important innovation resources, an enterprise's open innovation community also encounters numerous challenges. The purpose of this study is to develop…

Abstract

Purpose

While providing users with important innovation resources, an enterprise's open innovation community also encounters numerous challenges. The purpose of this study is to develop and implement a set of evaluation systems that can identify the ecological characteristics of open innovation communities. The ultimate goal is to provide guidance for the construction and establishment of these communities.

Design/methodology/approach

Firstly, from the perspective of information ecology, according to the connotation requirements of the four information elements of “people, information, technology and environment” in the information ecosystem, this paper determines the evaluation indicators of enterprise's open innovation community from the aspects of integrity and dynamics. Then, based on the improved analytic hierarchy process, the weight of each index is calculated, and a complete evaluation system of open innovation community is established. Finally, the fuzzy comprehensive evaluation method is used to conduct empirical research on Haier Open Partnership (HOPE) platform, analyze its ecological situation and existing problems and put forward the corresponding construction recommendations.

Findings

The application of HOPE platform shows that the evaluation index system built in this study has good applicability, and the whole research process and research method have certain reference value for future studies. At the same time, the study found that the HOPE platform has good ecological characteristics, but there are also some problems. This study can directly promote the construction of the platform.

Originality/value

This paper, for the first time, combines the information ecology theory with the open innovation community. The results demonstrate that the open innovation community is an information ecosystem, which can be evaluated ecologically. Furthermore, to ensure the calculation's scientific accuracy, the index weight is determined by constructing a judgment matrix based on expert questionnaires.

Details

Business Process Management Journal, vol. 29 no. 7
Type: Research Article
ISSN: 1463-7154

Keywords

Open Access
Article
Publication date: 7 December 2023

Yuxia Yan, Na Wang and Yun Cao

Coastal zone ecological restoration project is of great significance to alleviate marine ecological degradation. Evaluating the effect of coastal ecological restoration projects…

Abstract

Purpose

Coastal zone ecological restoration project is of great significance to alleviate marine ecological degradation. Evaluating the effect of coastal ecological restoration projects and identifying the obstacle factors affecting their restoration level can provide an empirical basis for future Marine ecological restoration projects.

Design/methodology/approach

However, due to the initial stage of coastal zone ecological restoration projects, the actual monitoring data of coastal zone ecological restoration is relatively lacking. Based on the CRITIC-TOPSIS (combination of CRITIC method and TOPSIS method) method, combined with the subjective perception of the public and the actual data of the restoration project, this paper proposes an evaluation method of the coastal zone ecological restoration effect to obtain the specific implementation effect of the coastal zone ecological restoration project. The main obstacle factors affecting the evaluation of coastal ecological restoration effect are identified by using the obstacle degree model.

Findings

This paper conducted an empirical study on the restoration of sandy shoreline and coastal wetland in Qinhuangdao city. Based on the data of restoration projects and the subjective perception of ecological restoration by the public in Qinhuangdao city, the research results showed that the coastal zone ecological restoration effect of Qinhuangdao city was general. The quality of the restoration project and the public perception have an important influence on the evaluation of the restoration effect. Improving the quality of the restoration project, strengthening the public's participation in ecological restoration and allowing the public to better participate in the ecological restoration of the coastal zone can improve the effect of ecological restoration of the coastal zone in an all-round way.

Originality/value

The research results of this paper have a guiding role in the ecological restoration of coastal cities in the future, and also have a demonstration and reference role for the assessment of the effect of ecological restoration of coastal zones.

Details

Marine Economics and Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2516-158X

Keywords

Open Access
Article
Publication date: 25 December 2023

Jiahe Wang, Huajian Li, Chengxian Ma, Chaoxun Cai, Zhonglai Yi and Jiaxuan Wang

This study aims to analyze the factors, evaluation techniques of the durability of existing railway engineering.

Abstract

Purpose

This study aims to analyze the factors, evaluation techniques of the durability of existing railway engineering.

Design/methodology/approach

China has built a railway network of over 150,000 km. Ensuring the safety of the existing railway engineering is of great significance for maintaining normal railway operation order. However, railway engineering is a strip structure that crosses multiple complex environments. And railway engineering will withstand high-frequency impact loads from trains. The above factors have led to differences in the deterioration characteristics and maintenance strategies of railway engineering compared to conventional concrete structures. Therefore, it is very important to analyze the key factors that affect the durability of railway structures and propose technologies for durability evaluation.

Findings

The factors that affect the durability and reliability of railway engineering are mainly divided into three categories: material factors, environmental factors and load factors. Among them, material factors also include influencing factors, such as raw materials, mix proportions and so on. Environmental factors vary depending on the service environment of railway engineering, and the durability and deterioration of concrete have different failure mechanisms. Load factors include static load and train dynamic load. The on-site rapid detection methods for five common diseases in railway engineering are also proposed in this paper. These methods can quickly evaluate the durability of existing railway engineering concrete.

Originality/value

The research can provide some new evaluation techniques and methods for the durability of existing railway engineering.

Details

Railway Sciences, vol. 3 no. 1
Type: Research Article
ISSN: 2755-0907

Keywords

Article
Publication date: 11 October 2023

Xiongming Lai, Yuxin Chen, Yong Zhang and Cheng Wang

The paper proposed a fast procedure for solving the reliability-based robust design optimization (RBRDO) by modifying the RBRDO formulation and transforming it into a series of…

Abstract

Purpose

The paper proposed a fast procedure for solving the reliability-based robust design optimization (RBRDO) by modifying the RBRDO formulation and transforming it into a series of RBRDO subproblems. Then for each subproblem, the objective function, constraint function and reliability index are approximated using Taylor series expansion, and their approximate forms depend on the deterministic design vector rather than the random vector and the uncertain estimation in the inner loop of RBRDO can be avoided. In this way, it can greatly reduce the evaluation number of performance function. Lastly, the trust region method is used to manage the above sequential RBRDO subproblems for convergence.

Design/methodology/approach

As is known, RBRDO is nested optimization, where the outer loop updates the design vector and the inner loop estimate the uncertainties. When solving the RBRDO, a large evaluation number of performance functions are needed. Aiming at this issue, the paper proposed a fast integrated procedure for solving the RBRDO by reducing the evaluation number for the performance functions. First, it transforms the original RBRDO problem into a series of RBRDO subproblems. In each subproblem, the objective function, constraint function and reliability index caused are approximated using simple explicit functions that solely depend on the deterministic design vector rather than the random vector. In this way, the need for extensive sampling simulation in the inner loop is greatly reduced. As a result, the evaluation number for performance functions is significantly reduced, leading to a substantial reduction in computation cost. The trust region method is then employed to handle the sequential RBRDO subproblems, ensuring convergence to the optimal solutions. Finally, the engineering test and the application are presented to illustrate the effectiveness and efficiency of the proposed methods.

Findings

The paper proposes a fast procedure of solving the RBRDO can greatly reduce the evaluation number of performance function within the RBRDO and the computation cost can be saved greatly, which makes it suitable for engineering applications.

Originality/value

The standard deviation of the original objective function of the RBRDO is replaced by the mean and the reliability index of the original objective function, which are further approximated by using Taylor series expansion and their approximate forms depend on the deterministic design vector rather than the random vector. Moreover, the constraint functions are also approximated by using Taylor series expansion. In this way, the uncertainty estimation of the performance functions (i.e. the mean of the objective function, the constraint functions) and the reliability index of the objective function are avoided within the inner loop of the RBRDO.

Details

International Journal of Structural Integrity, vol. 14 no. 6
Type: Research Article
ISSN: 1757-9864

Keywords

1 – 10 of over 10000