Search results
1 – 10 of 560Meng H. Lean and Wei-Ping L. Chu
The purpose of this paper is to describe a rapid and robust axisymmetric hybrid algorithm to create dynamic temporal and spatial charge distributions, or charge map, in…
Abstract
Purpose
The purpose of this paper is to describe a rapid and robust axisymmetric hybrid algorithm to create dynamic temporal and spatial charge distributions, or charge map, in the simulation of bipolar charge injection using Schottky emission and Fowler-Nordheim tunneling, field-dependent transport, recombination, and bulk and interfacial trapping/de-trapping for layered polymer films spanning the range from initial injection to near breakdown.
Design/methodology/approach
This hybrid algorithm uses a source distribution technique based on an axisymmetric boundary integral equation method (BIEM) to solve the Poisson equation and a fourth-order Runge-Kutta (RK4) method with an upwind scheme for time integration. Iterative stability is assured by satisfying the Courant-Friedrichs-Levy (CFL) stability criterion. Dynamic charge mapping is achieved by allowing conducting and insulating boundaries and material interfaces to be intuitively represented by equivalent free and bound charge distributions that collectively satisfy all local and far-field conditions.
Findings
Charge packets cause substantial increase of electric stress and could accelerate the breakdown of polymeric capacitors. Conditions for the creation of charge packets are identified and numerically demonstrated for a combination of impulsive step excitation, high charge injection, and discontinuous interface.
Originality/value
Metallized bi-axially oriented polypropylene (BOPP) dielectric thin film capacitor with self-clearing and enhanced current carrying capability offer an inexpensive and lightweight alternative for efficient power conditioning, energy storage, energy conversion, and pulsed power. The originality is the comprehensive physics and multi-dimensional modeling which span the dynamic range from initial injection to near breakdown. This model has been validated against some empirical data and may be used to identify failure mechanisms such as charge packets, gaseous voids, and electroluminescence. The value lies in the use of this model to develop mitigation strategies, including re-designs and materials matching, to avoid these failure mechanisms.
Details
Keywords
Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke
The idea of implementing supply chain management (SCM) principles for the construction industry was embraced by construction stakeholders to enhance the sector's…
Abstract
The idea of implementing supply chain management (SCM) principles for the construction industry was embraced by construction stakeholders to enhance the sector's performance. The analysis from the literature revealed that the implementation of SCM in the construction industry enhances the industry's value in terms of cost-saving, time savings, material management, risk management and others. The construction supply chain (CSC) can be managed using the pull or push system. This chapter also discusses the origin and proliferation of SCM into the construction industry. The chapter revealed that the concept of SCM has passed through five different eras: the creation era, the use of ERP, globalisation stage, specialisation stage and electronic stage. The findings from the literature revealed that we are presently in the fourth industrial revolution (4IR) era. At this stage, the SCM witnesses the adoption of technologies and principles driven by the 4IR. This chapter also revealed that the practice of SCM in the construction industry is centred around integration, collaboration, communication and the structure of the supply chain (SC). The forms and challenges hindering the adoption of these practices were also discussed extensively in this chapter.
Details
Keywords
Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke
The model and existing practice of the construction supply chain (CSC) in the United Kingdom (UK) and Australia was presented in this chapter. The policies and reports…
Abstract
The model and existing practice of the construction supply chain (CSC) in the United Kingdom (UK) and Australia was presented in this chapter. The policies and reports that support the practice of the CSC were examined in both countries. It was discovered from the review of literature that the UK has a more detailed report targeted at improving the CSC than Australia. However, both countries have a common factor affecting their CSC which originates from fragmentation experienced within their supply chain. Construction stakeholders in the UK and Australia believe that collaboration and integration are vital components for improving performance. The majority of the contractors in both countries embrace collaborative working for the sole purpose of risk sharing, access to innovation and response to market efficiency. However, most of the models developed for managing the CSC in the UK are built around building information modelling (BIM). Also, the reviewed studies show that supply chain management practice will be effective following the following principle: shared objectives, trust, reduction in a blame culture, joint working, enhanced communication and information-sharing. Finally, the UK has a more established framework and more CSC models compared to Australia.
Details
Keywords
Phuoc Luong Le and Nguyen Thi Duc Nguyen
To deal with the present situation and recover after the COVID-19 pandemic, construction firms are required to recognise the trends in construction supply chain management…
Abstract
Purpose
To deal with the present situation and recover after the COVID-19 pandemic, construction firms are required to recognise the trends in construction supply chain management (CSCM) for the upcoming years and determine the appropriate practices towards the trends for the improvement of construction activities in terms of strategy, tactic and operations. This paper aims to recognise key trends in CSCM and uses these trends as strategic criteria for the evaluation and prioritisation of lean construction (LC) tools at different project phases including design and architectural engineering, planning and control, on-site construction and safety management.
Design/methodology/approach
The integrated analytic hierarchy process–Delphi method is used to collect and analyse the data from construction experts to evaluate the importance levels of the CSCM trends and recommend the appropriate tools for LC practices to improve project performances.
Findings
Seven key CSCM trends are identified: lean supply chain management (SCM), supply chain (SC) integration, SC standardisation, SC problem-solving, SC information-sharing, SC flexibility and SC sustainability. Based on these trends, a set of prioritised lean tools are suggested for LC practices, in which “virtual design construction” (VDC) and “last planner system” are considered as the central tools. These two LC practices can be integrated with other effective tools to support the strategic, tactical and operational targets in construction supply chain (CSC) projects.
Research limitations/implications
This study gives the managerial implications by developing an application framework of LC practices for CSC projects. The framework promotes “VDC” as a strategic tool for the phase of design and architectural engineering and considers “last planner system” as the central LC practice for the phase of project planning and control. The framework also focuses on the improvement of efficiency in construction operations by taking into account the aspects of on-site collaboration, problem-solving, improvement and safety.
Originality/value
Up to date, there is still a lack of researches in classifying and prioritising the significant LC tools for each project phase to deal with CSC issues in both breadth and depth. Thus, this study is performed to provide construction managers with the awareness of CSCM trends on which they can focus to have strategic criteria for selecting LC practices to improve CSC performances.
Details
Keywords
Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke
The prevalent practice of construction supply chain (CSC) in developing countries with a focus on Africa was presented in this chapter. Two African countries (South Africa…
Abstract
The prevalent practice of construction supply chain (CSC) in developing countries with a focus on Africa was presented in this chapter. Two African countries (South Africa and Ghana) were selected due to the extensive literature on the CSC emanating from the countries. The impediment to the effective management of the CSC in the two African countries was also examined in this chapter. It was discovered that the vital inhibition to the performance of CSC in developing countries is the adoption of culture from developed countries without a proper model for ensuring its implementation in developing countries. Also, no model has incorporated the principles and technologies of the fourth industrial revolution (4IR) to manage the CSC. The failure to adopt the 4IR technologies like block chain, big data and the internet of things has prevented the proper application of CSC practices in developing countries. CSC practices like collaboration, integration, lean supply chain, information sharing, financial management and communication are the primary practice in developing countries. Finally, this chapter called for the development of a model for managing the CSC in developing countries in alignment with the principles of the 4IR.
Details
Keywords
Martin Evans, Peter Farrell, Emad Elbeltagi and Helen Dion
The architecture, engineering and construction (AEC) industry encounter substantial risks and challenges in its evolution towards sustainable development. International…
Abstract
Purpose
The architecture, engineering and construction (AEC) industry encounter substantial risks and challenges in its evolution towards sustainable development. International businesses, multinational AEC organisations, technical professionals, project and portfolio management organisations face global connectivity challenges between business units, especially during the outbreak of novel coronavirus pandemic, to manage construction megaprojects (CMPs). That raises the need to manage global connectivity as a main strategic goal of global organisations. This paper aims to investigate barriers to integrating lean construction (LC) practices and integrated project delivery (IPD) on CMPs towards the global integrated delivery (GID) transformative initiatives and develop future of work (FOW) global initiatives in contemporary multinational AEC organisations.
Design/methodology/approach
A two-stage quantitative and qualitative research approach is adopted. The qualitative research methodology consists of a literature review to appraise barriers to integrating LeanIPD&GID on CMPs. Barriers are arranged into six-factor clusters (FCs), with a conceptualisation of LeanIPD&GID, GID strategy placements and FOW global initiatives with multiple validations. This analysis also involved semi-structured interviews and focus group techniques. Stage two consisted of an empirical questionnaire survey that shaped the foundation of analysis and findings of 230 respondents from 23 countries with extensive cosmopolitan experience in the construction of megaprojects. The survey examined a set of 28 barriers to integrating LeanIPD&GID on CMPs resulting from a detailed analysis of extant literature after validation. Descriptive and inferential statistical tests were exploited for data analysis, percentage scoring analysis, principal component analysis (PCA) and eigenvalues were used to elaborate on clustered factors.
Findings
The research conceptualised LeanIPD&GID principles and proposed GID strategy placements for LeanIPD&GID transformative initiatives and FOW global initiatives. It concluded that the most significant barriers to integration of LeanIPD&GID on CMPs are “lack of mandatory building information modelling (BIM) and LC industry standards and regulations by governments”, “lack of involvement and support of governments”, “high costs of BIM software licenses”, “resistance of industry to change from traditional working practices” and “high initial investment in staff training costs of BIM”. PCA revealed the most significant FCs are “education and knowledge-related barriers”, “project objectives-related barriers” and “attitude-related barriers”. Awareness of BIM in the Middle East and North Africa (MENA) region is higher than LC and LC awareness is higher than IPD knowledge. Whilst BIM adoption in the MENA region is higher than LC; the second is still taking its first steps, whilst IPD has little implementation. LeanBIM is slightly integrated, whilst LeanIPD integration is almost not present.
Originality/value
The research findings, conclusion and recommendation and proposed GID strategy placements for LeanIPD&GID transformative initiatives to integrating LeanIPD&GID on CMPs. This will allow project key stakeholders to place emphasis on tackling LeanIPD&GID barriers identified in this research and commence GID strategies. The study has provided effective practical strategies for enhancing the integration of LeanIPD&GID transformative initiatives on CMPs.
Details
Keywords
Peter Boxall, Meng-Long Huo, Keith Macky and Jonathan Winterton
High-involvement work processes (HIWPs) are associated with high levels of employee influence over the work process, such as high levels of control over how to handle…
Abstract
High-involvement work processes (HIWPs) are associated with high levels of employee influence over the work process, such as high levels of control over how to handle individual job tasks or a high level of involvement at team or workplace level in designing work procedures. When implementations of HIWPs are accompanied by companion investments in human capital – for example, in better information and training, higher pay and stronger employee voice – it is appropriate to talk not only of HIWPs but of “high-involvement work systems” (HIWSs). This chapter reviews the theory and practice of HIWPs and HIWSs. Across a range of academic perspectives and societies, it has regularly been argued that steps to enhance employee involvement in decision-making create better opportunities to perform, better utilization of skill and human potential, and better employee motivation, leading, in turn, to various improvements in organizational and employee outcomes.
However, there are also costs to increased employee involvement and the authors review the important economic and sociopolitical contingencies that help to explain the incidence or distribution of HIWPs and HIWSs. The authors also review the research on the outcomes of higher employee involvement for firms and workers, discuss the quality of the research methods used, and consider the tensions with which the model is associated. This chapter concludes with an outline of the research agenda, envisaging an ongoing role for both quantitative and qualitative studies. Without ignoring the difficulties involved, the authors argue, from the societal perspective, that the high-involvement pathway should be considered one of the most important vectors available to improve the quality of work and employee well-being.
Details
Keywords
Martin Evans, Peter Farrell, Wael Zewein and Ayman Mashali
The construction industry encounters substantial challenges in its evolution towards sustainable development and to the adoption of building information modelling (BIM…
Abstract
Purpose
The construction industry encounters substantial challenges in its evolution towards sustainable development and to the adoption of building information modelling (BIM) technology and lean construction (LC) practices on construction mega-projects. This study aims to present critical challenges and to investigate the interactions of BIM and LC on construction mega-projects encountered by key stakeholders in their efforts to integrate BIM and LC.
Design/methodology/approach
A qualitative research approach is adopted to introduce and validate LC principles and BIM functionalities resulting from a detailed analysis of extant literature, followed by a conceptual analysis of the interactions between BIM and LC on construction mega-projects. A quantitative questionnaire survey is then used. Descriptive and inferential statistical tests are used for data analysis, and analysis of variance tests elaborate and validate results.
Findings
The research yielded ten BIM functionalities and ten LC principles, which are categorised in four principle areas and four BIM functionality groups. A research framework for analysis of the interaction between BIM and LC is then compiled.
Originality/value
Research findings and the proposed framework will enhance the adoption of BIM and LC practices on construction mega-projects and allow project key stakeholders to place emphasis on tackling crucial challenges and barriers identified in this research. The framework will guide and stimulate research; and as such, the approach adopted up to this point is constructive. The identified interactions between BIM and LC on construction mega-projects show positive synergies between the two.
Details
Keywords
Shakil Ahmed, Md. Mehrab Hossain and Iffat Haq
Construction management is enriched in many ways by direct and indirect support of lean construction concept. The objectives of this study are to assess the current level…
Abstract
Purpose
Construction management is enriched in many ways by direct and indirect support of lean construction concept. The objectives of this study are to assess the current level of awareness about lean construction practice, to identify the potential benefits and challenges to implement lean construction in the Bangladeshi construction industry and to prioritize them.
Design/methodology/approach
A comprehensive literature review has been done to design a questionnaire for the survey. The final questionnaire has been designed with 27 lean tools, 41 challenges, and seven benefits of implementing lean principles in the construction industry. A total of 164 valid responses have been collected from Bangladeshi construction practitioners involved in different types of construction organizations. The result has been analyzed by Relative Important Index (RII).
Findings
The findings revealed 41 challenges to implement lean construction with seven benefits in the Bangladeshi construction industry. The result shows that an appreciable number of respondent familiar with the techniques of lean construction but they don't practice. The findings have also pointed out that the lean construction approach adds a positive impact especially on quality, safety, cost, productivity, and environmental level. The top-ranked challenges to implementing lean construction are: lack of awareness and skill, poor management, traditional culture and attitude of employees, inadequate resources and equipment and nonuse of modern techniques and technologies.
Originality/value
This study reveals real scenario of lean construction in Bangladesh. It contributes to the body of knowledge, as it uncovers for the first time the awareness level, benefits and challenges to implement lean construction with reference to the social, economic and cultural context of Bangladesh. Exploring the findings, the study could help the stakeholders, construction firms, academician, researchers and government to focus their effort and resources on the significantly appropriate issues. Again, the study may be beneficial to developing countries especially in South Asia which share the same socio-economic status with Bangladesh.
Details
Keywords
José C.M. Franken, Desirée H. van Dun and Celeste P.M. Wilderom
As a problem-solving tool, the kaizen event (KE) is underutilised in practice. Assuming this is due to a lack of group process quality during those events, the authors…
Abstract
Purpose
As a problem-solving tool, the kaizen event (KE) is underutilised in practice. Assuming this is due to a lack of group process quality during those events, the authors aimed to grasp what is needed during high-quality KE meetings. Guided by the phased approach for structured problem-solving, the authors built and explored a measure for enriching future KE research.
Design/methodology/approach
Six phases were used to code all verbal contributions (N = 5,442) in 21 diverse, videotaped KE meetings. Resembling state space grids, the authors visualised the course of each meeting with line graphs which were shown to ten individual kaizen experts as well as to the filmed kaizen groups.
Findings
From their reactions to the graphs the authors extracted high-quality KE process characteristics. At the end of each phase, that should be enacted sequentially, explicit group consensus appeared to be crucial. Some of the groups spent too little time on a group-shared understanding of the problem and its root causes. Surprisingly, the mixed-methods data suggested that small and infrequent deviations (“jumps”) to another phase might be necessary for a high-quality process. According to the newly developed quantitative process measure, when groups often jump from one phase to a distant, previous or next phase, this relates to low KE process quality.
Originality/value
A refined conceptual model and research agenda are offered for generating better solutions during KEs, and the authors urge examinations of the effects of well-crafted KE training.
Details