Search results

1 – 10 of 36
Article
Publication date: 7 June 2023

Khalil Idrissi Gartoumi, Mohamed Aboussaleh and Smail Zaki

This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation…

Abstract

Purpose

This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation during the construction of megaprojects.

Design/methodology/approach

This paper presents a case study involving the construction of the Mohamed VI Tower in Morocco. It is the tallest tower in Africa, with 55 floors and a total height of 250 m. This study of the quality of the work and the involvement of the LC was carried out using the Define–Measure–Analysis–Improve–Control approach from Lean six sigma. It describes the Critical to Quality and analyses the root causes of quality defects, customer dissatisfaction and variation in the quality process.

Findings

Firstly, the results of this study map the causal factors of lack of quality as established in the literature. Secondly, the LC tools have reduced non-value-added sources of quality waste and, consequently, improved critical quality indicators.

Research limitations/implications

This document focuses on one part of the tower’s construction and is limited to a project case in a country where LC is rarely used.

Originality/value

This study reinforces the literature reviews, surveys and the small number of case studies that have validated the potential of LC and further clarifies future directions for the practical emergence of this quality improvement approach, especially for large-scale projects.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 29 December 2023

Dara Sruthilaya, Aneetha Vilventhan and P.R.C. Gopal

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation…

Abstract

Purpose

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation Laboratory (DEMATEL). The study provides qualitative and quantitative analysis of project complexities factors and their relationships. The results of the study facilitate effective project planning, proactive risk management and informed decision-making by stakeholders.

Design/methodology/approach

This study employs a case-based method for identifying PCFs and a DEMATEL method for analyzing the interdependence of complexity factors in metro rail projects. Initially, PCFs were identified through an extensive literature review. To validate and refine these factors, semi-structured interviews were conducted with thirty experienced professionals, each having 5–20 years of experience in roles such as project management, engineering, and planning. Further, elevated and underground metro rail projects were purposefully selected as cases, for identifying the similarities and differences in PCFs. A questionnaire survey was conducted with various technical experts in metro rail projects. These experts rated the impact of PCFs on a five-point Likert scale, for the evaluation of the interdependence of PCFs. The DEMATEL technique was used to analyze the interdependencies of the PCFs.

Findings

Metro rail projects are influenced by project complexity, which significantly impacts their performance. The analysis reveals that “design problems with existing structures,” “change in design or construction” and “land acquisition” are the key factors contributing to project complexity.

Originality/value

The study of project complexity in metro rail projects is limited because most of the studies have studies on examining complexity in mega projects. The existing literature lacks adequate attention in identifying project complexity and its effects on metro rail project performance. This research aims to bridge this gap by examining project complexity and interdependencies in metro rail projects.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 14 February 2024

Tiep Nguyen, Nicholas Chileshe, Duc Ty Ho, Viet Thanh Nguyen and Quang Phu Tran

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners…

Abstract

Purpose

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners. However, there is a paucity of studies which explore the impact of risks on both “urban rail” project time and cost together considering quantitative assessments. Therefore, this paper focuses on investigating critical risks and quantifying such risk impacts on urban railway project schedule and cost in practice.

Design/methodology/approach

A combination of qualitative and quantitative research methods comprising semi-interviews with five experts and a questionnaire survey of 132 professional respondents is used. The data were modeled using Monte Carlo Simulation to predict the probability of project schedule and cost.

Findings

The results show that 30 risk variables are categorized into seven main groups which have significant impacts on both project time and cost. Outstanding five risk variables were highlighted as follows: (1) project site clearance and land compensation; (2) design changes; (3) physical project resources; (4) contractors’ competencies and (5) project finance. Such findings were supported by Monte Carlo simulation which predicted in the worst case that the project may suffer 11.03 months’ delays and have cost overrun with a contingency of US$287.68 million.

Originality/value

This study expands our knowledge about time and cost contingency of urban metro railway implementation across developing economies and particularly within the context of Vietnam. Policymakers will not only gain an understanding about risk structure but will also recognize the significant impacts of critical risk through risk impact modeling and simulation. Such an approach provides insights into risk treatment priorities for planners so that they can proactively establish suitable strategies for risk mitigation in practice.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 2 April 2024

Rick Forster, Andrew Lyons, Nigel Caldwell, Jennifer Davies and Hossein Sharifi

The study sets out to demonstrate how a lifecycle perspective on complex, public-sector procurement projects can be used for making qualitative assessments of procurement policy…

Abstract

Purpose

The study sets out to demonstrate how a lifecycle perspective on complex, public-sector procurement projects can be used for making qualitative assessments of procurement policy and practice and reveal those procurement capabilities that are most impactful for operating effectively.

Design/methodology/approach

Agency theory, institutional theory and the lifecycle analysis technique are combined to abductively develop a framework to identify, analyse and compare complex procurement policies and practices in public sector organisations. Defence is the focal case and is compared with cases in the Nuclear, Local Government and Health sectors.

Findings

The study provides a framework for undertaking a lifecycle analysis to understand the challenges and capabilities of complex, public-sector buyers. Eighteen hierarchically-arranged themes are identified and used in conjunction with agency theory and institutional theory to explain complex procurement policy and practice variation in some of the UK’s highest-profile public buyers. The study findings provide a classification of complex buyers and offer valuable guidance for practitioners and researchers navigating complex procurement contexts.

Originality/value

The lifecycle approach proposed is a new research tool providing a bespoke application of theory by considering each lifecycle phase as an individual but related element that is governed by unique institutional pressures and principal-agent relationships.

Details

International Journal of Operations & Production Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 26 March 2024

Gavin Ford and Jonathan Gosling

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through…

Abstract

Purpose

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through quantitative research over the years to understand why the industry continues to see similar issues of failure. Some scholars have reported rework figures as high as 12.6% of total contract value, highlighting major concerns of the sustainability of construction projects. Separately, however, there have been few studies that explore and detail the views of industry professions who are caught in the middle of quality issues, to understand their perceptions of where the industry is failing. As such, this paper interrogates qualitative data (open-ended questions) on the topic of nonconformance and rework in construction to understand what industry professionals believe are the causes and suggested improvement areas.

Design/methodology/approach

A qualitative approach is adopted for this research. An industry survey consisting of seven open-ended questions is presented to two professional working groups within a Tier 1 contractor, and outputs are analysed using statistic software (NVivo 12) to identify prominent themes for discussion. Inductive analysis is undertaken to gain further insight into responses to yield recurrent areas for continuous improvement.

Findings

Qualitative analysis of the survey reveals a persistent prioritisation of cost and programme over quality management in construction project. Furthermore, feedback from construction professionals present a number of improvement areas that must be addressed to improve quality. These include increased training and competency investment, overhauling quality behaviours, providing greater quality leadership direction and reshaping the way clients govern schemes.

Research limitations/implications

There are limitations to this paper that require noting. Firstly, the survey was conducted within one principal contractor with varying levels of knowledge across multiple sectors. Secondly, the case study was from one major highways scheme; therefore, the generalisability of the findings is limited. It is suggested that a similar exercise is undertaken in other sectors to uncover similar improvement avenues.

Practical implications

The implications of this study calls for quality to be re-evaluated at project, company, sector and government levels to overhaul how quality is delivered. Furthermore, the paper identifies critical learning outcomes for the construction sector to take forward, including the need to reassess projects to ensure they are appropriately equip with competent personnel under a vetted, progressive training programme, share collaborative behaviours that value quality delivery on an equal standing to safety, programme and cost and tackle the inappropriate resource dilemmas projects finding themselves in through clear tendering and accurate planning. In addition, before making erratic decisions, projects must assess the risk profiling of proceed without approved design details and include the client in the decision-making process. Moreover, the findings call for a greater collaborative environment between the construction team and quality management department, rather than being seen as obstructive (i.e. compliance based policing). All of these must be driven by leadership to overhaul the way quality is managed on schemes. The findings demonstrate the importance and impact from open-ended survey response data studies to enhance quantitative outcomes and help provide strengthened proposals of improvement.

Originality/value

This paper addresses the highly sensitive area of quality failure outcomes and interrogates them via an industry survey within a major UK contractor for feedback. Unique insights are gained into how industry professionals perceive quality in construction. From previous research, this has been largely missing and offers a valuable addition in understanding the “quality status quo” from those delivering schemes.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 1 December 2022

Xian Zheng, Jiawei Deng, Xiangnan Song, Meng Ye and Lan Luo

Corporate social responsibility (CSR) and innovation are the two main approaches firms utilize to promote sustainable development. However, as yet, scholars have reached no…

Abstract

Purpose

Corporate social responsibility (CSR) and innovation are the two main approaches firms utilize to promote sustainable development. However, as yet, scholars have reached no consensus regarding their precise impact on construction firm performance (CFP), hindering efforts to implement effective sustainable development strategies that improve CFP. In view that a simple linear relationship may not be sufficient to capture their precise pattern, this study aims to unveil the nonlinear impact of CSR and innovation on CFP, especially when construction firms take up a distinct competitive position.

Design/methodology/approach

This study first proposed four hypotheses to establish a new theoretical model by incorporating CSR, innovation, CFP and construction firms' competitive position (CFCP). Then the model was tested by using 292 annual observations collected from 75 construction firms in China. A multiple regression model analysis was carried out to analyze the survey data and validate the hypotheses.

Findings

The results reveal that both CSR and innovation have a U-shaped impact on the price-to-book ratio of a construction firm, a specific CFP measure. CFCP negatively moderates the U-shaped relationship between CSR and CFP, but positively moderates the U-shaped relationship between innovation and CFP.

Originality/value

This study goes beyond a simple linear view, instead of unveiling the nonlinear U-shaped effects of CSR and innovation on CFP that deepen the understanding of their complex relationships in the construction industry and makes construction firms aware that CSR and innovation can only improve performance if they reach a certain level. The moderating role of CFCP provides important implications for construction firms seeking to adopt appropriate competitive strategies related to social responsibility and innovation that both promote CFP and achieve sustainable development.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 April 2024

Handan Kunkcu, Kerim Koc and Asli Pelin Gurgun

Work–family conflict is one of the most challenging stressors for construction industry professionals to cope with emotional problems. This study aims to propose a model linking…

Abstract

Purpose

Work–family conflict is one of the most challenging stressors for construction industry professionals to cope with emotional problems. This study aims to propose a model linking work–family conflict and high-quality relationships among project team members and explore mediating effects of life and job satisfactions.

Design/methodology/approach

A theoretical framework was established based on the spillover theory and social exchange theory. Data were obtained by a questionnaire survey conducted with 328 respondents working in construction projects. Structural equation modeling (SEM) was used to test interrelationships among work–family conflict, job satisfaction, life satisfaction and high-quality relationship.

Findings

The results indicate that work–family conflict is negatively associated with both job and life satisfactions of construction professionals. In addition, there were direct and positive relationships between satisfaction domains and high-quality relationship capacity. The findings further support that job satisfaction plays a mediating role between work–family conflict and high-quality relationship among construction professionals, while life satisfaction does not mediate the relationship.

Originality/value

The effects of interrole conflicts on the context of satisfaction have been investigated previously; however, there is a lack of knowledge regarding its influence on high-quality relationship among project team members. This study extends the body of knowledge on high-quality relationships among project team members to understand how conflict and satisfaction factors influence interpersonal relationships in construction project management.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 16 April 2024

Richard Kadan and Jan Andries Wium

Due to the uniqueness of individual construction projects, identifying the dominant risk factors is needed for risk mitigation in ongoing and future projects. This study aims to…

Abstract

Purpose

Due to the uniqueness of individual construction projects, identifying the dominant risk factors is needed for risk mitigation in ongoing and future projects. This study aims to identify the dominant construction supply chain risk (CSCR) factors, based on studies conducted between 2002 and 2022.

Design/methodology/approach

The study adopts the preferred reporting items for systematic reviews and meta-analysis (PRISMA) procedure to identify, screen and select relevant articles in order to provide a bibliography and annotation of the prevalent risks in the supply chains. A descriptive analysis of the findings then follows.

Findings

The study’s findings have highlighted the three most prevalent risks in the construction supply chain (poor communication across project teams, changes in foreign currency rate, unfavorable climate conditions) as reported in literature, that project teams need to pay closer attention to and take proactive steps to mitigate.

Research limitations/implications

Due to limitations imposed by the chosen research methodology, tools, time frame and article availability, the study was unable to examine all CSCR-related papers.

Practical implications

The results will serve as a useful roadmap for risk/supply chain managers in the construction industry to take strategically proactive steps towards allocating resources for CSCR mitigation efforts.

Social implications

Context-specific research on the impact of social and cultural risks on the construction supply chain would be beneficial, due to emerging social network risk factors and the complex socio-cultural settings.

Originality/value

There is presently no study that has reviewed extant studies to identify and compile the dominant risk factors (DRFs) associated with the supply chain of construction projects for ranking in the supply chain risk management process.

Details

Frontiers in Engineering and Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2634-2499

Keywords

Article
Publication date: 27 November 2023

Li Ma and Yongqiang Lu

The purpose of this study is to examine how construction project managers’ conflict management styles (CMSs) affect project team resilience from the perspective of social identity…

Abstract

Purpose

The purpose of this study is to examine how construction project managers’ conflict management styles (CMSs) affect project team resilience from the perspective of social identity theory.

Design/methodology/approach

This study adopted a cross-sectional survey design and collected paired data from 110 construction project managers and 474 employees in China. Based on the data collected, the authors tested the proposed hypotheses using hierarchical regression analysis.

Findings

The results show that a project manager’s cooperative CMS positively affects team resilience, and a project manager’s competitive and avoidant CMS negatively affects team resilience. Team followership plays a mediating role in this relationship. The team power distance moderates the effects of a project manager’s cooperative and avoidant CMSs on team followership.

Originality/value

This paper enriches the existing literature on conflict management in construction projects and have potential guiding significance and application value for team resilience management practices.

Details

International Journal of Conflict Management, vol. 35 no. 3
Type: Research Article
ISSN: 1044-4068

Keywords

Article
Publication date: 28 March 2022

Muhammad Ayat, Azmat Ullah and Changwook Kang

The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects…

Abstract

Purpose

The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects in developing countries.

Design/methodology/approach

The main data set for this study was collected from the World Bank database consisting of 8,951 PPI projects that occurred in developing countries from 1996 to 2020. Hierarchical logistic regression was applied for investigating the effects of USPs on project success. Three moderators, namely, control of corruption, presence of local sponsor and project size were also included in the model to test the impact of their interactions with the USP on the performance of PPI projects. Further, to assess the impact of the effect of USPs, the average marginal effect was calculated. The framework used in this study consists of 18 control variables, three moderators and one noncontrolled independent variable (the USP).

Findings

The results of hierarchical logistic regression indicate that USPs have a significant and negative effect on the success of PPI projects occurring in developing countries. The negative effect of a USP weakens with the presence of local sponsors and stronger control of corruption in the host country. However, contrary to the authors’ expectations, the results show that project size does not significantly affect the association between USPs and the success of PPI projects. Moreover, the results of average marginal effects show that the negative impact of USP on the success of PPI projects ranges between 2.4% and 3.8%.

Originality/value

This study quantifies the negative impact of USP on the success of PPI projects in developing countries, which will be helpful for the practitioners to understand the associated risk with USP projects. Furthermore, it also identifies the moderating roles of control of corruption and the presence of local sponsors on the relationship between USP and the success of PPI projects.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 10 of 36